# TENNESSEE GAS PIPELINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 220101006M
- **title:** TENNESSEE GAS PIPELINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-03-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.171, 192.605(a), 192.605(b)(6), 192.805(a), 192.805(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220101006m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220101006m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220101006m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220101006M
**body:**

Notice of Amendment involving TENNESSEE GAS PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.171,  192.605(a),  192.605(b)(6),  192.805(a),  192.805(b). The case was opened on 2010-03-11 and is reported as closed as of 2010-11-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220101006M_closure letter_11262010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101006M/220101006M_closure%20letter_11262010.pdf

220101006M_closure letter_11262010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101006M/220101006M_closure%20letter_11262010_text.pdf

220101006M_NOA_03112010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101006M/220101006M_NOA_03112010.pdf

220101006M_NOA_03112010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101006M/220101006M_NOA_03112010_text.pdf

220101006M_operator response_04072010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101006M/220101006M_operator%20response_04072010.pdf

220101006M_closure letter_11262010_text.pdf

November 26, 2010
Mr. William Cope
Vice President, Eastern Operations
Tennessee Gas Pipeline
569 Brookwood Village
Room 766
Birmingham, AL 35209
CPF 2-2010-1006M
Dear Mr. Cope:
On September 22, 2009, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety inspected the Tennessee Gas Pipeline
(TGP) Operator Qualification (OQ) program procedures in Clay City, Kentucky, pursuant to
Chapter 601 of 49 United States Code.
As a result of the inspection, PHMSA issued a Notice of Amendment (NOA) on March 11,
2010, which required TGP to amend its OQ program procedures.
The PHMSA Southern Region has reviewed your November 17, 2010, written response to the
NOA. We find that you have met the requirements specified in the NOA. No further action
is necessary with regards to the NOA and this case is now closed.
Please be advised that nothing herein states or implies that the above described OQ program
meets the requirements of the federal pipeline safety regulations or that the program is
approved. The pipeline system and its OQ program remain subject to inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region