# TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order

- **operation:** document
- **citation:** CPF 220111010H
- **title:** TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-11-28
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220111010h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220111010h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220111010h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220111010H
**body:**

Corrective Action Order involving TENNESSEE GAS PIPELINE COMPANY. The dataset does not identify a cited regulation for this case. The case was opened on 2011-11-28 and is reported as closed as of 2013-04-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220111010H_CAO_11282011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111010H/220111010H_CAO_11282011.pdf

220111010H_CAO_11282011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111010H/220111010H_CAO_11282011_text.pdf

220111010H_closure  letter_04162013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111010H/220111010H_closure%20%20letter_04162013_text.pdf

220111010H_closure letter_04162013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111010H/220111010H_closure%20letter_04162013.pdf

220111010H_closure  letter_04162013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 16, 2013
Mr. Gary M. Buchler
Vice President, Eastern Region
Kinder Morgan
Tennessee Gas Pipeline Company
1001 Louisiana
Houston, TX 77001
CPF No. 2-2011-1010H
Dear Mr. Buchler:
On April 12, 2013, you wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) Southern Region, Office of Pipeline Safety requesting closure of the Corrective
Action Order (CAO) (CPF No. 2-2011-1010H) PHMSA issued on November 28, 2011, after
a failure on the Tennessee Gas Pipeline Company, LLC (TGP) Line 100-1 pipeline near
Batesville, Mississippi on November 21, 2011.
This letter is to inform you that the Southern Region has reviewed all the actions taken by
TGP with respect to the CAO. We find that TGP has complied with the terms of the CAO.
No further actions are necessary with regards to the CAO and all pressure restrictions
established by the CAO are withdrawn. This case is now closed
Please be advised that this letter refers only to the CAO (CPF 2-2011-1010H) and not to any
other PHMSA pending cases, if any. The pipeline system remains subject to inspection by
PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220111010H_closure letter_04162013.pdf

U.S. Department
233 Peachtree Street Ste. 600
of Transportation
Atlanta, GA 30303
Hazardous Materials Safety
Pipeline and
Administration
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 16, 2013
Mr. Gary M. Buchler
Vice President, Eastern Region
Kinder Morgan
Tennessee Gas Pipeline Company
1001 Louisiana
Houston, TX 77001
CPF No. 2-2011-1010H
Dear Mr. Buchler:
On April 12, 2013, you wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) Southern Region, Office of Pipeline Safety requesting closure of the Corrective
Action Order (CAO) (CPF No. 2-2011-1010H) PHMSA issued on November 28, 2011, after
a failure on the Tennessee Gas Pipeline Company, LLC (TGP) Line 100-1 pipeline near
Batesville, Mississippi on November 21, 2011.
This letter is to inform you that the Southern Region has reviewed all the actions taken by
TGP with respect to the CAO. We find that TGP has complied with the terms of the CAO.
No further actions are necessary with regards to the CAO and all pressure restrictions
established by the CAO are withdrawn. This case is now closed
Please be advised that this letter refers only to the CAO (CPF 2-2011-1010H) and not to any
other PHMSA pending cases, if any. The pipeline system remains subject to inspection by
PHMSA.
Sincerely,
Wayne T. Lemor
сти
Director, Office of Pipeline Safety
PHMSA Southern Region
- **truncated:** false
- **body characters:** 3529