# HUNT CRUDE OIL SUPPLY CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 220115008M
- **title:** HUNT CRUDE OIL SUPPLY CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-04-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.214(a), 195.222(a), 195.571.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220115008m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220115008m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220115008m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220115008M
**body:**

Notice of Amendment involving HUNT CRUDE OIL SUPPLY CO. PHMSA's enforcement data identifies the cited regulations as 195.214(a),  195.222(a),  195.571. The case was opened on 2011-04-14 and is reported as closed as of 2011-06-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220115008M_closure letter_06142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220115008M/220115008M_closure%20letter_06142011.pdf

220115008M_closure letter_06142011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220115008M/220115008M_closure%20letter_06142011_text.pdf

220115008M_notice of amendment_04142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220115008M/220115008M_notice%20of%20amendment_04142011.pdf

220115008M_notice of amendment_04142011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220115008M/220115008M_notice%20of%20amendment_04142011_text.pdf

220115008M_closure letter_06142011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 14, 2011
Mr. N.C. Bowerman
Vice President of Operations
Hunt Crude Oil Supply Company
P.O. Box 211
Gilbertown, AL 36908
CPF 2-2011-5008M
Dear Mr. Bowerman:
From December 13-17, 2010, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected the Hunt Crude Oil Supply Company (Hunt) written
procedural manual for operations, maintenance, and emergencies at your Melvin, Alabama,
pipeline office, pursuant to Chapter 601 of 49 United States Code. On the basis of the
inspection, PHMSA issued a Notice of Amendment (NOA) on April 14, 2011.
Hunt responded to the NOA in a letter dated May 6, 2011. The PHMSA Southern Region
reviewed the written response and subsequently held several telephone conversations with
Hunt personnel. As a result, we find Hunt’s response adequate. Therefore, this letter is to
inform you that Hunt has complied with the terms of the NOA and that no further action is
necessary with regards to the NOA. This case is now closed.
Please be advised that this letter refers only to the NOA (CPF 2-2011-5008M) and not to any
other PHMSA pending cases. Also be advised that nothing herein states or implies that the
above described procedural manual meets the requirements of the federal pipeline safety
regulations or that the procedural manual is approved. The Hunt pipeline system and the
procedural manual remain subject to inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220115008M_notice of amendment_04142011_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 14, 2011
Mr. N.C. Bowerman
Vice President of Operations
Hunt Crude Oil Supply Company
P.O. Box 211
Gilbertown, AL 36908
CPF 2-2011-5008M
Dear Mr. Bowerman:
From December 13-17, 2010, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected the Hunt Crude Oil Supply Company (Hunt) written
procedural manual for operations, maintenance, and emergencies at your Melvin, Alabama,
pipeline office, pursuant to Chapter 601 of 49 United States Code.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Hunt’s procedures, as described below:
1. § 195.214 Welding procedures.
(a) Welding must be performed by a qualified welder in accordance with welding
procedures qualified under Section 5 of API 1104 or Section IX of the ASME Boiler
and Pressure Vessel Code (incorporated by reference, see §195.3) . The quality of the
test welds used to qualify the welding procedure shall be determined by destructive
testing.
(b) Each welding procedure must be recorded in detail, including the results of the
qualifying tests. This record must be retained and followed whenever the procedure
is used.
Hunt’s Liquid Pipeline O&M Plan – August 2010, Procedure 6.10.1 was inadequate
because it did not specify the correct edition and section of American Petroleum Institute
(API) Standard 1104, Welding of Pipeline and Related Facilities, it would use to qualify
welding procedures. Moreover, the procedure did not require Hunt to record the welding
procedures in detail and include the results of the qualifying tests.
1



2. § 195.222 Welders: Qualification of welders.
(a) Each welder must be qualified in accordance with section 6 of API 1104
(incorporated by reference, see § 195.3) or section IX of the ASME Boiler and
Pressure Vessel Code, (incorporated by reference, see § 195.3) except that a welder
qualified under an earlier edition than listed in § 195.3 may weld but may not re-
qualify under that earlier edition.
Hunt’s Liquid Pipeline O&M Plan – August 2010, Procedure 6.10.1 was inadequate
because it did not specify the correct edition or section of API Standard 1104 it would use
to qualify welders.
3. § 195.571 What criteria must I use to determine the adequacy of cathodic
protection?
Cathodic protection required by this Subpart must comply with one or more of the
applicable criteria and other considerations for cathodic protection contained in
paragraphs 6.2 and 6.3 of NACE SP 0169 (incorporated by reference, see § 195.3).
Hunt’s Liquid Pipeline O&M Plan – August 2010, Procedure 7.9 was inadequate because
it did not specify the correct edition of NACE International Standard Practice SP 0169,
Control of External Corrosion on Underground or Submerged Metallic Piping Systems, it
would use to determine the adequacy of its cathodic protection.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 30 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
2



It is requested (not mandated) that Hunt maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Wayne Lemoi, Director, Southern Region, Office of
Pipeline Safety, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 2-2011-5008M and, for each document you
submit, please provide a copy in electronic format whenever possible.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
3
- **truncated:** false
- **body characters:** 7850