# NORFOLK SOUTHERN RAILWAY-BROSNAN YARD PIPELINE — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 220116005
- **title:** NORFOLK SOUTHERN RAILWAY-BROSNAN YARD PIPELINE — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-02-17
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(f)(3), 195.452(i)(1), 195.452(i)(3), 195.452(i)(4), 195.452(k), 195.452(l)(1)(ii).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116005.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116005.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116005
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220116005
**body:**

Notice of Probable Violation involving NORFOLK SOUTHERN RAILWAY-BROSNAN YARD PIPELINE. PHMSA's enforcement data identifies the cited regulations as 195.452(f)(3),  195.452(i)(1),  195.452(i)(3),  195.452(i)(4),  195.452(k),  195.452(l)(1)(ii). The case was opened on 2011-02-17 and is reported as closed as of 2012-02-01. Proposed civil penalty: $77,500. Assessed civil penalty: $77,500. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220116005_closure letter_02012012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_closure%20letter_02012012.pdf

220116005_closure letter_02012012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_closure%20letter_02012012_text.pdf

220116005_Final Order_07222011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_Final%20Order_07222011.pdf

220116005_Final Order_07222011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_Final%20Order_07222011_text.pdf

220116005_nopv_pcp_pco_02172011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_nopv_pcp_pco_02172011.pdf

220116005_nopv_pcp_pco_02172011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_nopv_pcp_pco_02172011_text.pdf

220116005_Operator response_03182011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116005/220116005_Operator%20response_03182011.pdf

220116005_closure letter_02012012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 1, 2012
Mr. Tim Heilig
Vice President of Mechanical Operations
Norfolk Southern Corporation
1200 Peachtree Street NE (Box 184)
Atlanta, GA 30309
CPF 2-2011-6005
Dear Mr. Heilig:
On September 28-29, November 30, 2009, and June 29, 2010, a representative of the Pipeline
and Hazardous Materials Safety Administration (PHMSA) inspected the Norfolk Southern
Corporation (NSC) Integrity Management (IM) program records and procedures for the
Macon Pipeline at the Macon, Georgia office pursuant to Chapter 601 of 49 United States
Code.
As a result of the inspections, PHMSA issued a Final Order to NSC on July 22, 2011. The
Final Order included a Compliance Order (CO), which required NSC to take certain actions to
protect the public and the environment.
In late August 2011, PHMSA received letters from both NSC and Buckeye Development &
Logistics, LLC (Buckeye) confirming that as of July 1, 2011, Buckeye is the operator of the
Macon Pipeline and implementing Buckeye’s IM plan for the pipeline. Buckeye notified
PHMSA by letter on January 20, 2012, that the Macon Pipeline has been integrated into
Buckeye’s IM plan and the CO items have been completed. Therefore, no further action is
necessary with regards to this Final Order and this case is now closed.
Please be advised that nothing herein states or implies that the above described Buckeye IM
plan meets the requirements of the federal pipeline safety regulations or that the Buckeye IM
plan is approved. The pipeline system and Buckeye’s written IM plan remain subject to
inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
cc: Mr. Thomas S. Collier, Vice President, Performance Assurance & Asset Integrity,
Buckeye Partners, L.P.

220116005_Final Order_07222011_text.pdf

JUL 22 2011
Mr. Tim Heilig
Vice President of Mechanical Operations
Norfolk Southern Corporation
1200 Peachtree Street, N.E. (Box:184)
Atlanta, GA 30309
Re: CPF No. 2-2011-6005
Dear Mr. Heilig:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, assesses a civil penalty of $77,500, and specifies actions that need to be taken by
Norfolk Southern Corporation to comply with the pipeline safety regulations. The penalty
payment terms are set forth in the Final Order. When the civil penalty has been paid and the
terms of the compliance order completed, as determined by the Director, Southern Region, this
enforcement action will be closed. Service of the Final Order by certified mail is deemed
effective upon the date of mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, Pipeline Safety
Ms. A. Gayle Jordan, General Solicitor-Environmental
Mr. Wayne Lemoi, Director, OPS Southern Region
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7005 1160 0001 0075 9671]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Norfolk Southern Corporation, ) CPF No. 2-2011-6005
)
Respondent. )
____________________________________)
FINAL ORDER
On September 28-29, 2009, November 30, 2009, and June 29, 2010, pursuant to 49 U.S.C.
§ 60117, a representative of the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection of
the facilities and records of Norfolk Southern Corporation (Norfolk or Respondent) in Macon,
Georgia. Respondent operates 5.5 miles of diesel fuel pipeline in Macon, Georgia.1
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated February 17, 2011, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that Norfolk had committed various violations of 49 C.F.R. Part 195
and proposed assessing a civil penalty of $77,500 for the alleged violations. The Notice also
proposed ordering Respondent to take certain measures to correct the alleged violations. The
warning items required no further action, but warned the operator to correct the probable
violation.
Norfolk responded to the Notice by letter dated March 18, 2011 (Response). The company did
not contest the allegations of violation but provided an explanation of its actions and requested
that the proposed civil penalty be reduced. Respondent did not request a hearing and therefore
has waived its right to one.
FINDINGS OF VIOLATION
In its Response, Norfolk did not contest the allegations in the Notice that it violated 49 C.F.R.
Part 195, as follows:
1 http://www.nscorp.com/(last accessed 6/20/2011).



2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(3), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program…
(3) An analysis that integrates all available information about the
integrity of the entire pipeline and the consequences of a failure (see
paragraph (g) of this section)…
(g) What is an information analysis? In periodically evaluating the
integrity of each pipeline segment (paragraph (j) of this section), an
operator must analyze all available information about the integrity of the
entire pipeline and the consequences of a failure. This information
includes:
(1) Information critical to determining the potential for, and
preventing, damage due to excavation, including current and planned
damage prevention activities, and development or planned development
along the pipeline segment;
(2) Data gathered through the integrity assessment required under this
section;
(3) Data gathered in conjunction with other inspections, tests,
surveillance and patrols required by this Part, including, corrosion control
monitoring and cathodic protection surveys; and
(4) Information about how a failure would affect the high consequence
area, such as location of the water intake.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(3) by failing to perform an
analysis that integrated all available information about the integrity of its covered pipeline
segments and the consequences of a failure, in accordance with 49 C.F.R. 195.452(g).
Specifically, the Notice alleged that Norfolk failed to perform an analysis that integrated the nine
risk factors2
required by its Integrity Management Program (IMP) to evaluate the integrity of its
covered pipeline segments and the consequences of a failure. The Notice also alleged that the
company failed to analyze and evaluate its prior integrity assessments or risks based on its IM
procedures. Respondent did not contest this allegation of violation. Accordingly, based upon a
2 Section 4 of Norfolk’s Pipeline Integrity Management Program (NSCIMP) requires a Risk Assessment Committee
perform the risk analysis using Subject Matter Experts (SMEs) to evaluate the relative likelihood and consequence
of nine risk factors required for the assessment. The risk factors include (1) the results of prior IM assessments, (2)
pipeline construction, (3) pipeline history (leak history, repair history, cathodic protection history), (4) the product
transported, (5) maximum operating pressure (MOP) and percent of specified minimum yield strength (% SMYS),
(6) activities in the area, (7) local factors, (8) geotechnical factors, and (9) physical support for the pipeline.



3
review of all of the evidence, I find that Respondent violated 49 C.F.R. § 195.452 (f)(3) by
failing to perform an analysis that integrated nine risk factors to evaluate the integrity of its
covered pipeline segments and the consequences of a failure on the pipeline, in accordance with
49 C.F.R. 195.452(g).
Item 3A: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program:…
(6) Identification of preventive and mitigative measures to protect the
high consequence area (see paragraph (i) of this section)…
i) What preventive and mitigative measures must an operator take to
protect the high consequence area? —(1) General requirements. An
operator must take measures to prevent and mitigate the consequences of a
pipeline failure that could affect a high consequence area. These measures
include conducting a risk analysis of the pipeline segment to identify
additional actions to enhance public safety or environmental protection.
Such actions may include, but are not limited to, implementing damage
prevention best practices, better monitoring of cathodic protection where
corrosion is a concern, establishing shorter inspection intervals, installing
EFRDs on the pipeline segment, modifying the systems that monitor
pressure and detect leaks, providing additional training to personnel on
response procedures, conducting drills with local emergency responders
and adopting other management controls....
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1) by failing to perform a
risk analysis of its pipeline segments to identify additional measures to prevent and mitigate the
consequences of a pipeline failure that could affect HCAs.
Norfolk failed to conduct a risk analysis of the pipeline to identify additional measures to
enhance public safety or environmental protection in order to prevent and mitigate the
consequences of a pipeline failure that could affect HCAs. Respondent acknowledged that it
3 Specifically, the Notice alleged that
3 An HCA is defined as: (1) a commercially navigable waterway, which means a waterway where a substantial
likelihood of commercial navigation exists; (2) a high population area, which means an urbanized area, as defined
and delineated by the Census Bureau, that contains 50,000 or more people and has a population density of at least
1,000 people per square mile; (3) an other populated area, which means a place, as defined and delineated by the
Census Bureau, that contains a concentrated population, such as an incorporated or unincorporated city, town,
village, or other designated residential or commercial area; and (4) an unusually sensitive area, as defined in
§ 195.6. 49 C.F.R. § 195.450.



4
failed to identify additional measures to prevent and mitigate the consequences, as required by its
IMP. Accordingly, based upon a review of all of the evidence, I find that Respondent violated
49 C.F.R. § 195.452 (i)(1) by failing to conduct a risk analysis to identify measures to take to
prevent and mitigate the consequences of a pipeline failure that could affect a high consequence
area.
Item 3B: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(3), which states in
relevant part:
§ 195.452 --Pipeline integrity management in high consequence areas.
(i) …
(3) Leak detection. An operator must have a means to detect leaks on
its pipeline system. An operator must evaluate the capability of its leak
detection means and modify, as necessary, to protect the high consequence
area. An operator's evaluation must, at least, consider, the following
factors—length and size of the pipeline, type of product carried, the
pipeline’s proximity to the high consequence area, the swiftness of leak
detection, location of nearest response personnel, leak history, and risk
assessment results…
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(3) by failing to evaluate the
capability of its leak detection system or modify the system, as necessary, to protect HCAs.
Specifically, the Notice alleged that Norfolk did not have documentation to demonstrate that it
evaluated its leak detection capability. The Notice also alleged that Respondent’s personnel
stated that they could not confirm that an evaluation had been completed. Respondent did not
contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I
find that Respondent violated 49 C.F.R. § 195.452(i)(3) by failing to evaluate the capability of
its leak detection system or modify the system, as necessary, to protect HCAs.
Item 3C: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(4), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
(i) …
4) Emergency Flow Restricting Devices (EFRD). If an operator
determines that an EFRD is needed on a pipeline segment to protect a high
consequence area in the event of a hazardous liquid pipeline release, an
operator must install the EFRD. In making this determination, an operator
must, at least, consider the following factors—the swiftness of leak
detection and pipeline shutdown capabilities, the type of commodity
carried, the rate of potential leakage, the volume that can be released,
topography or pipeline profile, the potential for ignition, proximity to
power sources, location of nearest response personnel, specific terrain
between the pipeline segment and the high consequence area, and benefits
expected by reducing the spill size.



5
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(4) by failing to perform an
evaluation on its pipeline to determine the need for Emergency Flow Restricting Devices
personnel stated that they could not confirm that an evaluation had been completed. Respondent
did not contest this allegation of violation. Accordingly, based upon a review of all of the
evidence, I find that Respondent violated 49 C.F.R. § 195.452(i)(4) by failing to perform an
evaluation on its pipeline to determine the need for EFRDs.
(EFRDs)4 to protect high consequence areas along its pipeline. PHMSA asserted that Norfolk
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(k), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
(j) …
(k) What methods to measure program effectiveness must be used? An
operator's program must include methods to measure whether the program
is effective in assessing and evaluating the integrity of each pipeline
segment and in protecting the high consequence areas. See Appendix C of
this part for guidance on methods that can be used to evaluate a program's
effectiveness.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(k) by failing to perform a
review of its integrity management program to measure whether the program was effective in
assessing and evaluating the integrity of each pipeline segment and in protecting the high
consequence areas. Specifically, the Notice alleged that Norfolk failed to provide documentation
to demonstrate that it had ever performed an IM program review. Respondent did not contest
this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that
Respondent violated 49 C.F.R. § 195.452(k) by failing to review the effectiveness of its IM
program to measure whether the program effectively assessed and evaluated the integrity of each
pipeline segment and protected the high consequence areas.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $77,500 for the violations cited above.
4 A check valve or remote control valve as defined by 49 C.F.R. §195.450 – Definitions.



6
Item 1: The Notice proposed a civil penalty of $15,500 for Respondent’s violation of 49 C.F.R.
§ 195.452(f) for failing to perform an analysis that integrated the nine risk factors required by its
IMP to evaluate the integrity of its covered pipeline segments and the consequences of a failure.
Respondent requested mitigation of the proposed civil penalty based on its efforts to comply by
analyzing five risk factors it considered pertinent to its pipeline. I find that although Norfolk’s
analysis addressed five risk factors, the company did not analyze and evaluate any of the nine
risks factors required by its IM procedures. In terms of the culpability, Respondent knew of its
responsibility to meet the various requirements of its IMP; therefore a reduction of the civil
penalty is not warranted. Accordingly, having reviewed the record and considered the
assessment criteria, I assess Respondent a civil penalty of $15,500 for violation of 49 C.F.R.
§ 195.452(f).
Item 3A: The Notice proposed a civil penalty of $15,500 for Respondent’s violation of 49
C.F.R. § 195.452(i)(1) for failing to perform a risk analysis of its pipeline to identify measures
to take to prevent and mitigate the consequences of a pipeline failure that could affect a HCA.
Respondent acknowledged that it did not follow its IMP to develop the guidelines to identify
measures to prevent and mitigate the consequences of a pipeline failure that could affect HCAs.
However, the company advised that it did take steps to address the risks it identified that were
particular to the pipeline’s location in the railroad yard, including hiring third party contractors to
respond immediately to any incident along the pipeline and employ the necessary response
equipment. In terms of the culpability of the offense, Respondent knew of its responsibility to
meet the various requirements of its IMP procedures and acknowledged its non-compliance.
Performance of integrity assessments and preventing and mitigating the consequences of a
pipeline failure are vital components of the integrity management regulations, which are
designed to ensure a heightened level of safety for HCAs. Accordingly, having reviewed the
record and considered the assessment criteria, I assess Respondent a civil penalty of $15,500 for
violation of 49 C.F.R. § 195.452(i)(1).
Item 3B: The Notice proposed a civil penalty of $10,500 for Respondent’s violation of 49
C.F.R. § 195.452(i)(3) for failing to evaluate the capability of its leak detection system or to
modify the system, as necessary, to protect high consequence areas. Respondent proffered that
its failure to comply was due to a misunderstanding of what such an evaluation would entail.
Norfolk stated that it has a leak detection system that monitors flow into and out of the pipeline
and that the system has an emergency shutdown valve, and that it receives monitoring data and
continuously evaluates that data. Respondent also stated that it had internal discussions
concerning its leak detection system, which included discussions about whether the system
provided enough information. Even though Respondent has a leak detection system and engaged
in discussions about the system, such measures are inconsistent with the regulation’s intent to
conduct a formal evaluation of the capabilities its leak detection system to protect high
consequence areas. Respondent is culpable for the violation. Accordingly, having reviewed the



7
record and considered the assessment criteria, I assess Respondent a civil penalty of $10,500 for
violation of 49 C.F.R. § 195.452(i)(3).
Item 3C: The Notice proposed a civil penalty of $20,500 for Respondent’s violation of 49
C.F.R. § 195.452(i)(4), for failing to perform an evaluation on the pipeline to determine the need
for Emergency Flow Restricting Devices (EFRD) to protect high consequence areas along the
company’s pipeline. In its Response, Norfolk advised that, prior to the inspection, it had
conducted informal EFRD evaluations, but the evaluations were focused on the understood price
of additional EFRDs. Norfolk also advised it was not in possession of the EFRD evaluation
records at the time of the inspection but it has since obtained these records from NuStar
Terminal, which delivers diesel fuel to Norfolk’s pipeline. I find that an informal evaluation of
the needs for EFRDs based on pricing is inconsistent with the regulation’s intent to provide
additional protection for HCAs. Norfolk has not provided relevant information to support a
reduction in the proposed civil penalty. Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $20,500 for violation of 49 C.F.R.
§ 195.452(i)(4).
Item 4: The Notice proposed a civil penalty of $15,500 for Respondent’s violation of 49 C.F.R.
§ 195.452(k), for failing to failing to perform integrity management program (IMP) reviews to
measure whether the IMP program was effective in assessing and evaluating the integrity of each
pipeline segment and in protecting the high consequence areas.5 Respondent explained that its
personnel do perform these reviews, but did not keep written accounts of the reviews. Without
documentation of IMP reviews it is often difficult, if not impossible, for PHMSA to determine
compliance with the integrity management regulations. Congress has recognized the importance
of maintaining proper documentation by explicitly requiring that every pipeline operator
maintain and make available to OPS records and information “[t]o enable the Secretary to decide
whether [the operator] is complying with this chapter and standards prescribed or orders issued
Accordingly, having reviewed the record and considered the assessment criteria, I assess
under this chapter.”6 Respondent is fully culpable for its failure to follow its IMP procedures.
Respondent a civil penalty of $15,500 for violation of 49 C.F.R. §195.452(k).
In summary, having reviewed the entire record and considered the assessment criteria, I assess
Respondent a total civil penalty of $77,500. There is nothing in the record indicating that
payment of this penalty would adversely affect Respondent’s ability to continue in business.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
5 49 U.S.C. § 60109.
6 49 U.S.C. § 60117(b).



8
Failure to pay the $77,500 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 3A, 3B, 3C, and4 in the Notice
for violations of 49 C.F.R. §§ 195.452(f), 195.452(i)(1), 195.452(i)(3), 195.452(i)(4), and
195.452(k), respectively. Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. Pursuant to the
authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
following actions to ensure compliance with the pipeline safety regulations applicable to its
operations:
1. With respect to the violation of § 195.452(g) (Item 1), Respondent must perform a
risk analysis of its pipeline in accordance with its revised integrity management
program procedures.
2. With respect to the violation of § 195.452(i)(1) (Item 3A), Respondent must
perform a risk analysis of its pipeline segments to identify additional preventative
and mitigative measures to enhance public safety and environmental protection.
3. With respect to the violation of § 195.452(i)(3) (Item 3B), Respondent must
perform an evaluation of its leak detection system, in accordance with the
requirements of § 195.452(i)(3).
4. With respect to the violation of § 195.452(i)(4) (Item 3C), Respondent must
perform an evaluation to determine the need for EFRDs to protect high
consequence areas along its pipeline, as required by §195.452(i)(4).
5. With respect to the violation of § 195.452(k) (Item 4), Respondent must perform a
review of its integrity management program to determine whether the program is
effectively assessing and evaluating the integrity of the pipeline.
6. Norfolk must provide written documentation to the Director, PHMSA Southern
Region, to demonstrate that all Items of this Compliance Order have been
completed within 45 days following receipt of this Final Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.



9
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
WARNING ITEM
With respect to Items 2, the Notice alleged a probable violation of Part 195 but did not propose a
civil penalty or compliance order for this item. Therefore, this is considered to be a warning
item. The warning is for:
49 C.F.R. § 195.452 (Item 2) – Respondent’s alleged failure to properly document the decisions,
analyses, and actions taken to implement and evaluate each element of its integrity management
program. Specifically, Respondent failed to demonstrate how it selected pressure testing as the
appropriate assessment method to be used on its pipeline to assess the pipeline for identified
risks.
Norfolk is hereby advised to correct the condition. If OPS finds a violation of this provision in a
subsequent inspection, Respondent may be subject to future enforcement action.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed. Unless the Associate Administrator, upon request, grants a stay, all
other terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety