# PIPELINES OF PUERTO RICO INCD, THE — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 220116007
- **title:** PIPELINES OF PUERTO RICO INCD, THE — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-08-02
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.404(a)(3), 195.410(a)(2)(i), 195.452(f)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220116007
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220116007
**body:**

Notice of Probable Violation involving PIPELINES OF PUERTO RICO INCD, THE. PHMSA's enforcement data identifies the cited regulations as 195.404(a)(3),  195.410(a)(2)(i),  195.452(f)(2). The case was opened on 2011-08-02 and is reported as closed as of 2013-03-01. Proposed civil penalty: $20,000. Assessed civil penalty: $20,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220116007_closure letter_03012013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_closure%20letter_03012013.pdf

220116007_closure letter_03012013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_closure%20letter_03012013_text.pdf

220116007_Final Order_02082012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_Final%20Order_02082012.pdf

220116007_Final Order_02082012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_Final%20Order_02082012_text.pdf

220116007_NOPV_PCP_PCO_08022011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_NOPV_PCP_PCO_08022011.pdf

220116007_NOPV_PCP_PCO_08022011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220116007/220116007_NOPV_PCP_PCO_08022011_text.pdf

220116007_closure letter_03012013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 1, 2013
Mr. Robert L. Rose
President
Tampa Pipeline Corporation
The Pipelines of Puerto Rico, Inc.
P.O. Box 35236
Sarasota, FL 34242
CPF 2-2011-6007
Dear Mr. Rose:
On May 16 - 20, 2011, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected The Pipelines of Puerto Rico, Inc. (PLPR) jet fuel
pipeline system in Guaynabo, Puerto Rico. PLPR is a subsidiary of the Tampa Pipeline
Corporation (TPC).
As a result of the inspection, PHMSA issued a Final Order to PLPR on February 8, 2012.
The Final Order included a Civil Penalty (CP) and a Compliance Order (CO), which required
PLPR to take certain actions to protect the public and the environment.
PLPR paid the CP in May 2012 and provided records for PLPR’s hydrostatic pressure test of
the pipeline in January 2013. The PHMSA Southern Region has reviewed your pressure test
records and we find that you have met the requirements specified in the CO. No further
action is necessary with regards to the Final Order and this case is now closed.
Please be advised that nothing herein states or implies that PLPR's pipeline system is in
compliance with the federal pipeline safety regulations. The pipeline system remains subject
to inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220116007_Final Order_02082012_text.pdf

FEB 8 2012
Mr. Robert Rose
President
The Pipelines of Puerto Rico, Inc.
P.O. Box 35236
Sarasota, FL 34242
Re: CPF No. 2-2011-6007
Dear Mr. Rose:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation, assesses a civil penalty of $20,000, and specifies actions that need to be taken by The
Pipelines of Puerto Rico, Inc., to comply with the pipeline safety regulations. The penalty
payment terms are set forth in the Final Order. When the civil penalty has been paid and the
terms of the compliance order completed, as determined by the Director, Southern Region, this
enforcement action will be closed. Service of the Final Order by certified mail is deemed
effective upon the date of mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Wayne T. Lemoi, Director, Southern Region, OPS
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [71791000164203198355]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
The Pipelines of Puerto Rico, Inc., ) CPF No. 2-2011-6007
)
Respondent. )
____________________________________)
FINAL ORDER
On May16-20, 2011, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an on-site pipeline safety inspection of the facilities and records of The Pipelines of
Puerto Rico, Inc. (PLPR or Respondent), in Guaynabo, Puerto Rico.
jet fuel pipeline from the Cataño Pump Station in Guaynabo to the Luis Muñoz Marin
International Airport in Carolina, Puerto Rico.
1 PLPR operates a 9.5-mile
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated August 2, 2011, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice), which also included a warning pursuant to
49 C.F.R. § 190.205. In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that
PLPR had violated 49 C.F.R. § 195.452(f) (2) and proposed assessing a civil penalty of $20,000
for the alleged violation. The Notice also proposed ordering Respondent to take certain
measures to correct the alleged violation. The warning items required no further action, but
warned the operator to correct the probable violation or face possible enforcement action.
Respondent failed to respond within 30 days of receipt of service of the Notice. Under
49 C.F.R. § 190.209(c), such failure to respond constitutes a waiver of PLPR’s right to contest
the allegations in the Notice and authorizes the Associate Administrator, without further notice,
to find facts as alleged in the Notice and to issue this Final Order under § 190.213. In this case,
the Notice was mailed to Respondent by certified mail (USPS Article No. 7007 2680 1340 7334)
on August 2, 2011, and was received by Respondent on August 4, 2011, as shown by the return
1 According to Articles of Merger filed with the Secretary of State of the State of Florida, Tampa Pipeline Limited
Partnership merged with Tampa Pipeline Corporation on or around September 30, 2001. Tampa Pipeline
Corporation and its related companies operate pipelines providing jet fuel to various airports: St. Louis Pipeline
Corporation (St. Louis Pipeline); Illinois Petroleum Supply Corporation (Illinois Petroleum Supply); Illinois
Pipeline Corporation (Illinois Pipeline); Idaho Pipeline Corporation (Idaho Pipeline); Tampa Airport Corporation
(Tampa Airport Pipeline); San Antonio Pipeline Corporation (San Antonio Pipeline); and Pipelines of Puerto Rico,
Inc. (San Juan Pipeline). http://www.sunbiz.org/corioff.html (last accessed 1/26/2012)



2
receipt on file with PHMSA. To date, Respondent has never acknowledged or responded to the
Notice. Under such circumstances, I find it reasonable and appropriate to enter this Final Order
without further proceedings.2
FINDING OF VIOLATION
The company did not respond to the allegation in the Notice that it violated 49 C.F.R. Part 195,
as follows:
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f) (2), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) …
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program:
(1) …
(2) A baseline assessment plan meeting the requirements of paragraph
(c) of this section; . . . .
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f) (2) by failing to include a
baseline assessment plan (BAP) in its integrity management program (IMP) that met the
requirements of paragraph (c) of § 195.452. Specifically, the Notice alleged that Respondent
failed to conduct a valid BAP on its 9.5-mile jet fuel pipeline by the deadline specified in
§ 195.452(d).
According to the Notice, Respondent presented the OPS inspection team with the company’s
annual pressure test records, test procedures, time lines, and other data for October 2004,
October 2005, November 2006, September 2007, and September 2008, to demonstrate that it had
taken various actions to assess the integrity of its pipeline in accordance with § 195.452(c)(i).
Under § 195.452(c), an operator must assess its pipeline by one of several methods specified in
the regulation, including pressure tests conducted in accordance with Subpart E of Part 195. The
Notice alleged, however, that the pressure tests performed by Respondent failed to satisfy the
requirements of Subpart E for several reasons. First, Respondent conducted the pressure tests
using jet fuel instead of water, as required by 49 C.F.R. § 195.306. Second, PLPR had no
2 The Pipelines of Puerto Rico, Inc., is a sister company of several other pipelines owned or controlled by Mr.
Robert Rose. E.g., In the Matter of Tampa Pipeline Corporation, Final Order (CPF No. 2-2008-6002] (April 26,
2010), 2010 WL 6531627, (D.O.T.), August 27, 2010; See also, In the Matter of Tampa Bay Pipeline Corporation,
Final Order (CPF No. 2-2005-6012 (Dec. 1, 2006), 2008 WL 902910 (D.O.T.), March 31, 2008. PHMSA final
orders are generally accessible on the agency’s website, available at
http://primis.phmsa.dot.gov/comm/reports/enforce/Actions.



3
evidence to show that the pressure tests did not result in any leaks.3
Third, Subpart E requires
that pressure tests equal or exceed 125% of the maximum operating pressure (MOP) of the
pipeline, not 125% of the regular operating pressure. Respondent’s minimum test pressure was
at least 125% above the “regular operating pressure of the pipeline,
” which was well below the
MOP. Therefore, PLPR failed to complete a valid IMP baseline assessment of its pipeline in
accordance with 49 C.F.R. Part 195. Accordingly, based upon a review of the evidence in the
record, I find that Respondent violated 49 C.F.R. § 195.452(f)(2) by failing to include a
compliant BAP in its IMP.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under
49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $20,000 for the violation cited above.
Item 3: The Notice proposed a civil penalty of $20,000 for Respondent’s violation of
49 C.F.R. § 195.452(f)(2), for failing to include a BAP in its IMP that met the requirements of
paragraph (c) of § 195.452. As noted above, PLPR failed to respond to the Notice. The
proposed penalty is based, in part, on the higher risks posed by a potential failure of this line to
HCAs. Failure to identify when a pipeline is subject to the integrity management regulations
presents a risk to the safety of the public and environment in the most critical geographical areas
because the operator may not adhere to more stringent standards imposed on pipelines that could
affect HCAs.
Furthermore, operators were required under § 195.452(a)(2) to complete BAPs for Category 2
pipelines not later than February 17, 2009. More than two years after this date when OPS
conducted its inspection, PLPR still had not completed this basic task. In terms of culpability,
Respondent’s senior management knew or should have known of its responsibility to meet the
various requirements of its own IMP.
4
Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $20,000 for violation of
49 C.F.R. § 195.452(f)(2).
3 The test records show a significant pressure decline in several of the tests. The contractor attributed all of these
pressure declines to changes in temperature, but without any engineering analysis or other proof to show that none
of the pressure declines were due to leaks.
4 In the Matter of Idaho Pipeline Corporation, CPF No. 5-2008-5036 (April 27, 2009), the company was found to
have violated 49 C.F.R. § 195.452(f) by failing to have a written IMP that addressed the minimum requirements in
49 C.F.R. § 195.452(f). 2009 WL 1211367, (D.O.T.), April 27, 2009. Idaho Pipeline Corporation is another sister
company of The Pipelines of Puerto Rico, Inc.



4
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P. O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
Failure to pay the $20,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 3 in the Notice for violation of
49 C.F.R. § 195.452(f)(2). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. Pursuant to the
authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
following actions to ensure compliance with the pipeline safety regulations applicable to its
operations. Respondent must take the following actions:
1. With respect to the violation of § 195.452(f)(2) (Item 3), Respondent must,
within 60 days of receipt of this Order, develop a plan to complete a valid IMP
baseline assessment of its jet fuel pipeline from the Cataño Pumping Station to the
Luis Muñoz Marin International Airport in Carolina, Puerto Rico, and submit the
plan to the Director for approval.
2. Respondent must complete the IMP baseline assessment in accordance with the
approved plan within 120 days of receipt of this Order, as required by
49 C.F.R. § 195.452.
3. It is requested that PLPR maintain documentation of the safety-improvement
costs associated with fulfilling the terms of this Compliance Order and submit the
total to the Director. It is requested that costs be reported in two categories: (1)
total cost associated with preparation/revision of plans, procedures, studies, and
analyses; and (2) total cost associated with replacements, additions, and other
changes to pipeline infrastructure.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.



5
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
WARNING ITEMS
With respect to Items 1 and 2, the Notice alleged probable violations of Part 195 but did not
propose a civil penalty or compliance order for these items. Therefore, these are considered to
be warning items. The warnings were for:
49 C.F.R. § 195.404 (a)(3) (Item 1) ─ Respondent’s alleged failure to maintain
current and accurate records of the MOP of its pipeline. PLPR showed the MOP
as being 904 psig in one record, 1,104 psig in another, and 627 psig in a letter to
OPS, Southern Region, dated September 8, 2010; and
49 C.F.R. § 195.410 (a)(2)(i) (Item 2) ─ Respondent’s alleged failure to properly
identify the product being transported in its pipeline as “Petroleum,” on the
company’s line markers. Specifically, the pipeline transported jet fuel but the
word “gasoline” was printed on the pipeline markers.
If OPS finds a violation of any of these items in a subsequent inspection, Respondent may be
subject to future enforcement action.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed. Unless the Associate Administrator, upon request, grants a stay, all
other terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety