# DESTIN PIPELINE COMPANY, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 220121001W
- **title:** DESTIN PIPELINE COMPANY, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-01-11
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.463(a), 192.605(a), 192.707(a), 192.731(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220121001w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220121001w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220121001w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220121001W
**body:**

Warning Letter involving DESTIN PIPELINE COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.463(a),  192.605(a),  192.707(a),  192.731(c). The case was opened on 2012-01-11 and is reported as closed as of 2012-01-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220121001W_warning letter_01112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220121001W/220121001W_warning%20letter_01112012.pdf

220121001W_warning letter_01112012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220121001W/220121001W_warning%20letter_01112012_text.pdf

220121001W_warning letter_01112012_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 11, 2012
Mr. Steve Pankhurst
Business Unit Leader
Destin Pipeline Company, LLC
150 West Warrenville Road
Naperville, IL 60563
CPF 2-2012-1001W
Dear Mr. Pankhurst:
On September 12-16, 2011, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected the Destin Pipeline Company, LLC (Destin) pipelines
and facilities at various locations in Mississippi and on platforms in the Main Pass Area in the
Gulf of Mexico pursuant to Chapter 601 of 49 United States Code.
As a result of the inspection, it appears that Destin has committed probable violations of the
Pipeline Safety Regulations codified in Title 49 of the Code of Federal Regulations. The
items inspected and the probable violations are as follows:
1. §192.463 External corrosion control: Cathodic protection.
(a) Each cathodic protection system required by this subpart must provide a level of
cathodic protection that complies with one or more of the applicable criteria
contained in Appendix D of this part. If none of these criteria is applicable, the
cathodic protection system must provide a level of cathodic protection at least equal
to that provided by compliance with one or more of these criteria.
Destin’s Operations, Maintenance and Emergency Manual (OMER) written procedure
P-192.453 Corrosion Control failed to meet the regulation because it referenced the
wrong external corrosion control cathodic protection criteria. The procedure stated,
“Cathodic protection required by this subpart must comply with one or more of the
applicable criteria and other considerations for cathodic protection contained in
paragraphs 6.2 and 6.3 of NACE Standard Practice SP0169-2007 and Standard Test
TM0497-2002 (incorporated by reference).”



Although NACE SP0169-2007 criteria are similar to those listed in Part 192 Appendix D,
they are not identical. Appendix D is the correct referenced document for the cathodic
protection of pipelines regulated under Part 192. NACE SP0169-2007 is not referenced in
Part 192 and cannot be used to determine cathodic protection criteria for natural gas
pipelines.
Additionally, Destin’s OMER written procedure P-192.453 also stated, “The Use of
Sound Engineering Judgment: Although the potential criteria is normally used to
establish the level of protection in most cases, the use of sound engineering judgment may
also be used to determine that corrosion does not exist at the potentials being maintained.
An example would be where an in-line inspection revealed that no corrosion had taken
place for a given section of pipe. That would provide sufficient evidence that the potential
maintained on that section of pipe was adequate to control soil side corrosion. The
Corrosion Technical Authority shall approve any application of Sound Engineering
Judgment prior to its application.”
The above verbiage states that for certain pipelines that do not meet cathodic protection
criteria, Destin can use an alternative criterion that is determined based on sound
engineering judgment. Neither §192.463(a) nor Appendix D allow for the use of sound
engineering judgment to determine cathodic protection criteria. The only criteria allowed
are those in Appendix D.
2. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. . . .
– Destin did not follow its OMER P-192.605(c) Abnormal Operations written procedure
when responding to a pipeline event that occurred on August 30, 2011, because it did
not document the event by creating a work order for the field maintenance personnel
to record their response to, and closure of, the event as required by the procedure.
On August 30, 2011, Destin’s liquids removal facility located immediately upstream
of the Pascagoula Gas Processing Plant experienced an abnormally high level of
liquids. As a result, the on-site Hi-Hi liquid level control system was tripped, resulting
in the closure of valves and a cessation of all offshore gas being delivered to the
processing plant. Destin’s SCADA logs indicated that at 08:10:52 on August 30, 2011,
valves 9021 and 9041 at the processing plant were closed and the flow rate to the
processing plant went to zero.
While Destin’s procedure required the pipeline controller to document this type of
event by “creating a work order for the field maintenance personnel to record their
response and closure to the event,” the controller did not recognize this event as an
abnormal condition and did not create a work order for the field maintenance
personnel to record their response to, and closure of, the event.
2



– Destin did not follow its written work order procedures as further explained below.
Destin used these work orders for conducting certain operations and maintenance
activities required by §192.605(a).
– Work order no. 1817142: Pascmpr Press Xmitr Discharge Side- performed on
09/02/2011 at the Pascagoula Compressor Station: Destin did not properly
document the station Hi Discharge PLC set point, as required by the work order.
The station Hi Hi Discharge PLC setpoint was documented as 1290 psig but the
required set point per the Station RTU Cause and Effect Chart was 1260 psig.
– Work order no. 809616: Pascmpr Press Xmitr Discharge Side- performed on
09/07/2010 at the Pascagoula Compressor Station: Destin did not properly
document the station Hi Discharge PLC set point, as required by the work order.
The station Hi-Hi Discharge PLC set point was documented as 1250 psig but the
required set point per the Station RTU Cause and Effect Chart was 1260 psig.
– Work order no. 717228 Pascmpr Press Xmitr Discharge Side- performed on
09/06/2009 at the Pascagoula Compressor Station: Destin did not properly
document the station Hi and Hi-Hi Discharge PLC set points, as required by the
work order.
– Work order no. 809625 PT-9001 Sand Hill Discharge- performed on 08/31/2010
at the Sand Hill Compressor Station: The station Hi Discharge PLC set point was
improperly documented as 1261 psig. The required set point per the Station RTU
Cause and Effect Chart was 1252 psig. The station Hi-Hi Discharge PLC set point
was improperly documented as 1312 psig. The required set point per the Station
RTU Cause and Effect Chart was 1260 psig.
– Work order no. 717237 PT-9001 Sand Hill Discharge - performed on 09/07/2009
at the Sand Hill Compressor Station: Destin did not properly document the station
Hi and Hi-Hi Discharge PLC set points, as required by the work order.
– Work order no. 830596 Sand Hill Compressor Station ESD Test - performed on
11/09-11/2010 at the Sand Hill Compressor Station: Destin did not document the
ESD Test Location, as required by the work order.
– Work order no. 1792331 Pascagoula Compressor Station ESD Test - performed
on 08/04/2011 at the Pascagoula Compressor Station: Destin did not document
specific observations of the station ESD test, as required by the work order.
– Work order no. 792429 Pascagoula Compressor Station ESD Test - performed on
07/23/2010 at the Pascagoula Compressor Station: Destin did not document
specific observations of the station ESD test, as required by the work order.
– Destin did not follow its OMER P-192.739 Overpressure Safety Devices written
procedure when attempting to comply with §192.743(b), which requires an annual
review of relief device capacity calculations or annual documentation that the
parameters of the relief devices had not changed since the original capacity
calculations. Destin did not perform the above described reviews for calendar years
2009 and 2010 for its compressor station fuel gas relief devices located at Pascagoula3



(PSV 1400 and PSV 1401) and Sand Hill (PSV 1451 and PSV 1400). It was noted
during the inspection that the applicable parameters of these relief valves had not
changed since the original construction.
3. §192.707 Line markers for mains and transmission lines.
(a) Buried pipelines. Except as provided in paragraph (b) of this section, a line
marker must be placed and maintained as close as practical over each buried main
and transmission line . . . .
Destin’s OMER procedure P-192.614 Section XII Pipeline Permanent Marker Program
was incorrect and did not meet the regulation. This procedure stated, “Marking and
identification of BP [includes Destin pipeline] rights of way will be marked and identified
in accordance with BP procedures: Specification for Auxiliary Installations (Site
Technical Practices STP-43-119) and/or Affiliate Equivalent.” Moreover, the procedure
provided to the PHMSA inspector, SP-119 BP Pipelines, N.A. Specification for Auxiliary
Installations (SP-119) incorrectly referenced Title 49 CFR Part 195 and ASME B31.4 as
applicable codes, and listed the line marker placement requirements of §195.410(a). Part
195 and ASME B31.4 regulate hazardous liquid pipelines, not natural gas pipelines.
Though the requirements in §195.410(a) are similar to those in §192.707(a), they are not
identical and are not interchangeable.
4. §192.731 Compressor stations: Inspection and testing of relief devices.
. . . (c) Each remote control shutdown device must be inspected and tested at
intervals not exceeding 15 months, but at least once each calendar year, to determine
that it functions properly.
Destin did not adequately record the inspection and testing of remote control shutdown
devices. That is, Destin did not document the inspection and testing of remote control
shutdown devices (compressor station emergency shutdown devices (ESDs)) in the detail
required to show the devices functioned properly. Moreover, location-specific lists of
these devices were not referenced or included in the following work orders:
– Sand Hill Compressor Station Work order 830596 Sand Hill Compressor Station ESD
Test conducted on 11/09-11/2010.
– Pascagoula Compressor Station Work orders 1792331 Pascagoula Compressor
Station ESD Test conducted on 08/04/2011, and 792429 Pascagoula Compressor
Station ESD Test conducted on 07/23/2010.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of
$1,000,000 for any related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct
the items identified in this letter. Failure to do so will result in Destin Pipeline Company,
LLC being subject to additional enforcement action.
4



No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF2-2012-1001W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
5
- **truncated:** false
- **body characters:** 12286