# GENESIS PIPELINE ALABAMA, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 220126007M
- **title:** GENESIS PIPELINE ALABAMA, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-03-20
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.422(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126007m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126007m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126007m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220126007M
**body:**

Notice of Amendment involving GENESIS PIPELINE ALABAMA, LLC. PHMSA's enforcement data identifies the cited regulation as 195.422(b). The case was opened on 2012-03-20 and is reported as closed as of 2012-04-17. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220126007M_closure letter_04172012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126007M/220126007M_closure%20letter_04172012.pdf

220126007M_closure letter_04172012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126007M/220126007M_closure%20letter_04172012_text.pdf

220126007M_notice of amendment_03202012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126007M/220126007M_notice%20of%20amendment_03202012.pdf

220126007M_notice of amendment_03202012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126007M/220126007M_notice%20of%20amendment_03202012_text.pdf

220126007M_Operator response_04052012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126007M/220126007M_Operator%20response_04052012.pdf

220126007M_closure letter_04172012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 17, 2012
Mr. Jeffrey W. Gifford
Vice President, HSSE
Genesis Energy
919 Milam, Suite 2100
Houston, Texas 77002
CPF 2-2012-6007M
Dear Mr. Gifford:
On February 13-16, 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected the Genesis Pipeline Alabama, LLC (Genesis-AL)
Castleberry Pipeline’s written operations and maintenance procedures contained in the
Genesis Energy Liquid & CO2 Operations, Maintenance and Emergency Procedures Manual
(LOM&E). The LOM&E is used by all Genesis Energy, L.P companies operating hazardous
liquid pipelines regulated by 49 CFR Part 195. The inspection took place in Brewton,
Alabama, pursuant to Chapter 601 of 49 United States Code. As a result of the inspection,
PHMSA issued a Notice of Amendment (NOA) on March 20, 2012.
The PHMSA Southern Region received your response to the NOA on April 9, 2012. We have
reviewed your response, and find Genesis-AL’s response adequate. This letter is to inform
you that Genesis-AL has complied with the terms of the NOA and that no further action is
necessary with regards to the NOA. This case is now closed.
Please be advised that this letter refers only to the NOA (CPF 2-2012-6007M) and not to any
other PHMSA pending cases. Also be advised that nothing herein states or implies that the
LOM&E meets the requirements of the federal pipeline safety regulations or that the LOM&E
is approved. The pipeline system and LOM&E remain subject to inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220126007M_notice of amendment_03202012_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 20, 2012
Mr. Mike Moore
Vice President, Pipelines and Trucking Operations
Genesis Pipeline Alabama, LLC
919 Milam, Suite 2100
Houston, Texas 77002-5417
CPF 2-2012-6007M
Dear Mr. Moore:
From February 13-16, 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) inspected the Genesis Pipeline Alabama, LLC (Genesis-AL)
Castleberry Pipeline’s written operations and maintenance (O&M) procedures in Alabama
pursuant to Chapter 601 of 49 United States Code.
On the basis of the inspection, PHMSA has identified apparent inadequacies within
Genesis-AL’s written procedures, as described below:
1. §195.422 Pipeline repairs.
. . . (b) No operator may use any pipe, valve, or fitting, for replacement in repairing
pipeline facilities, unless it is designed and constructed as required by this part.
Genesis-AL’s written procedures were inadequate because they did not require certain
components to be designed and constructed in accordance with Part 195.
The Genesis Energy Liquid & CO2 Operations, Maintenance and Emergency Procedures
Manual (LOM&E) is used by all Genesis Energy, L.P. companies operating hazardous
liquid pipelines regulated under 49 CFR Part 195. LOM&E Section 2.14 Pipeline Repair
and Maintenance did not require that any pipe, valve, or fitting, used for replacement in
repairing pipeline facilities, be designed and constructed in accordance with Part 195. The
referenced procedure stated “All repairs made must comply with 195.422…”; however, it
did not address how Genesis-AL would meet the requirements.



Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 30 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that Genesis Pipeline Alabama, LLC maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Wayne T. Lemoi, Director,
Southern Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 2-2012-6007M and, for each document you
submit, please provide a copy in electronic format whenever possible.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
2