# TAMPA AIRPORT PIPELINE CORPORATION — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 220126021
- **title:** TAMPA AIRPORT PIPELINE CORPORATION — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-10-23
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(b)(5), 195.452(d)(1), 195.452(g)(2), 195.452(h)(1), 195.452(h)(2), 195.452(l)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126021.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126021.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220126021
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220126021
**body:**

Notice of Probable Violation involving TAMPA AIRPORT PIPELINE CORPORATION. PHMSA's enforcement data identifies the cited regulations as 195.452(b)(5),  195.452(d)(1),  195.452(g)(2),  195.452(h)(1),  195.452(h)(2),  195.452(l)(1). The case was opened on 2012-10-23 and is reported as closed as of 2015-02-12. Proposed civil penalty: $77,400. Assessed civil penalty: $77,400. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220126021_closure letter_02122015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_closure%20letter_02122015.pdf

220126021_closure Letter_02122015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_closure%20Letter_02122015_text.pdf

220126021_Final Order_04042013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_Final%20Order_04042013.pdf

220126021_Final Order_04042013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_Final%20Order_04042013_text.pdf

220126021_NOPV_PCP_PCO_10232012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_NOPV_PCP_PCO_10232012.pdf

220126021_NOPV_PCP_PCO_10232012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220126021/220126021_NOPV_PCP_PCO_10232012_text.pdf

220126021_closure Letter_02122015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 12, 2015
Mr. Robert L. Rose
President
Tampa Airport Pipeline Corporation
P.O. Box 35236
Sarasota, FL 34242
CPF 2-2012-6021
Dear Mr. Rose:
On April 4, 2013, the Pipeline and Hazardous Materials Safety Administration (PHMSA),
Office of Pipeline Safety (OPS) issued Tampa Airport Pipeline Corporation (TAPC) a Final
Order with an attached Compliance Order in the above-referenced case. The Compliance
Order required TAPC to undertake certain actions to ensure compliance with the federal
pipeline safety regulations.
Subsequent to the Final Order, TAPC took certain actions to comply with the requirements in
the Compliance Order and provided the OPS Southern Region with documentation of those
actions. Based on our review of the actions taken by TAPC and the supporting
documentation, we have determined that TAPC has completed its actions with regards to the
Compliance Order and the Final Order. This case is now closed and no further action is
necessary with respect to the matters involved in this case.
Please be advised that this letter refers only to the above referenced order (CPF 2-2012-6021)
and not to any other PHMSA cases, if any.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220126021_Final Order_04042013_text.pdf

APRIL 4, 2013
Mr. Robert L. Rose
President
Tampa Airport Pipeline Corporation
P.O. Box 35236
Sarasota, FL 34242
Re: CPF No. 2-2012-6021
Dear Mr. Rose:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, assesses a civil penalty of $77,400, and specifies actions that need to be taken by
Tampa Airport Pipeline Corporation to comply with the pipeline safety regulations. The penalty
payment terms are set forth in the Final Order. When the civil penalty has been paid and the
terms of the Compliance Order completed, as determined by the Director, Southern Region, this
enforcement action will be closed. Service of the Final Order by certified mail is deemed
effective upon the date of mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Wayne T. Lemoi, Director Office of Pipeline Safety, PHMSA Southern Region
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Tampa Airport Pipeline Corporation, ) CPF No. 2-2012-6021
)
Respondent. )
)
FINAL ORDER
On November 8-10, 2011, and on March 22, 2012, pursuant to 49 U.S.C. § 60117, a
representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office
of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection of the facilities and
Pipeline Integrity Management Plan (IMP) of the Tampa Airport Pipeline Corporation (TAPC or
Respondent) in Tampa, Florida. TAPC operates the Tampa Airport Pipeline, a 6-inch diameter
pipeline approximately 10.5 miles in length transporting jet fuel from Old Port Tampa to Tampa
International Airport.
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated October 23, 2012, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that TAPC had violated 49 C.F.R. §§ 195.452(b)(5), 195.452(d)(1),
195.452(g)(2), 195.452(h)(1), 195.452(h)(2), and 195.452(l)(1) and proposed assessing a civil
penalty of $77,400 for the alleged violations. The Notice also proposed ordering Respondent to
take certain measures to correct several of the alleged violations.
Respondent failed to respond within 30 days of receipt of service of the Notice. Under 49 C.F.R.
§ 190.209(c), such failure to respond constitutes a waiver of TAPC’s right to contest the
allegations in the Notice and authorizes the Associate Administrator, without further notice, to
find facts as alleged in the Notice and to issue this Final Order under § 190.213. In this case, the
Notice was mailed to Respondent by certified mail (USPS Article No. 7010 2780 0001 0713
8674) on October 23, 2012 and was received by Respondent on October 31, 2012, as shown by
the return receipt on file with PHMSA. To date, Respondent has never acknowledged or
responded to the Notice. Under such circumstances, I find it reasonable and appropriate to enter
this Final Order without further proceedings.



2
FINDINGS OF VIOLATION
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(b)(5), which states in
relevant part as follows:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must:
… (5) Implement and follow the program.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(b)(5) by failing to implement
and follow its IMP as written. Specifically, the Notice alleged that TAPC’s IMP only listed in-
line inspection (ILI) as an approved assessment method, but on March 17, 2010 TAPC used
pressure testing as an assessment method for its pipeline. Respondent did not contest this
allegation of violation. Accordingly, based upon a review of all of the evidence, I find that
Respondent violated 49 C.F.R. § 195.452(b)(5) by not implementing and following its Integrity
Management Plan as written.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(b)(5), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must
… (5) Implement and follow the program.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(b)(5) by failing to perform
annual risk assessments of its pipeline in accordance with its written IMP procedures.
Specifically, the Notice alleged that TAPC’s IMP required risk assessments to be conducted and
that those risk assessment methods be “reviewed and updated annually.” TAPC did not conduct
risk assessments of its pipeline or related facilities per its written procedures. TAPC personnel
stated that their risk assessment is an on-going process and is reviewed on a continuing basis.
Upon request, TAPC personnel failed to provide documentation of this on-going review process.
Respondent did not contest this allegation of violation. I would note that once the baseline
assessment of a pipeline segment is completed, the regulations do not require periodic re-
assessments of that pipeline segment to be conducted annually. Respondent’s written procedures
did, however, require an annual evaluation of the risk assessment method used by Respondent in
conducting risk assessments on its pipeline. The evidence showed that Respondent was unable
to produce any records demonstrating completion of this annual evaluation of the risk assessment
method. Accordingly, based upon a review of all of the evidence, I find that Respondent
violated 49 C.F.R. § 195.452(b)(5) by failing to follow its written risk assessment procedures.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(d)(1), which states in
relevant part:



3
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (d) When must operators complete baseline assessments? Operators must complete
baseline assessment as follows:
(1) Time periods. Complete assessments before the following deadlines:
If the Pipeline is:
Then complete baseline assessments
not later than the following dates
according to a schedule that
prioritizes assessments
And assess at least 50 percent
of the line pipe on an
expedited basis. Beginning
with the highest risk pipe, not
later than:
Category 1 March 31, 2008 September 30, 2004
Category 2 February 17, 2009 August 16, 2005
Category 3 Date the pipeline begins operation Not applicable
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(d)(1) by failing to assess at
least 50 percent of its Category 2 line pipe in high consequence areas before August 16, 2005.
Specifically, the Notice alleged that while TAPC performed a pressure test in December 2004,
this pressure test did not meet the pressure test requirements of Part 195, Subpart E and therefore
was not a valid IMP assessment.
1 Respondent did not contest this allegation of violation.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated
49 C.F.R. § 199.452(d)(1) by operating a Category 2 pipeline but failing to assess the required
amount of line pipe in high consequence areas by the required deadline, August 16, 2005.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(d)(1), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (d) When must operators complete baseline assessments? Operators must complete
baseline assessment as follows:
(1) Time periods. Complete assessments before the following deadlines:
If the Pipeline is:
Then complete baseline assessments
not later than the following dates
according to a schedule that
prioritizes assessments
And assess at least 50 percent
of the line pipe on an
expedited basis. Beginning
with the highest risk pipe, not
later than:
Category 1 March 31, 2008 September 30, 2004
Category 2 February 17, 2009 August 16, 2005
Category 3 Date the pipeline begins operation Not applicable
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(d)(1) by failing to complete
the required baseline assessment of all of its category 2 line pipe in high consequence areas by
February 17, 2009. Specifically, the Notice alleged that while TAPC performed a pressure test
in December 2004, this pressure test did not meet the pressure test requirements of Part 195,
Subpart E and therefore was not a valid IMP assessment.2 In a letter to PHMSA dated January
26, 2009, TAPC notified PHMSA that it attempted to assess the pipeline with ILI tools but was
1 As noted in Item 1, pressure testing was not allowed as an assessment method under Respondent’s written IMP as
it existed at the time of the inspection.
2 As noted in Item 1, pressure testing was not allowed as an assessment method under Respondent’s written IMP as
it existed at the time of the inspection.



4
unable to complete the assessment. The combination of the 2004 pressure test which was not a
valid IMP assessment and an incomplete ILI does not meet the regulatory requirement to
complete a full assessment of a pipeline segment subject to IMP. Respondent did not contest this
allegation of violation. Accordingly, based upon a review of all of the evidence, I find that
Respondent violated 49 C.F.R. § 195.452(d)(1) by failing to complete the required baseline
assessment of all of its category 2 pipeline by the February 17, 2009 deadline.
Item 5: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(g)(2), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (g) What is an information analysis? In periodically evaluating the integrity of each
pipeline segment (paragraph (j) of this section), an operator must analyze all available
information about the integrity of the entire pipeline and the consequences of a failure.
This information includes:
… (2) Data gathered through the integrity assessment required under this section.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(g)(2) by failing to analyze all
available information about the integrity of its pipeline. Specifically, the Notice alleged that
TAPC failed to integrate all the report data from the 2008 and 2009 caliper and magnetic flux
leakage (MFL) ILI tool runs in its data integration and analysis. While not all of these tool runs
were complete as noted in Item 4 above, they did produce some information about the integrity
of the pipeline. Respondent did not contest this allegation of violation. Accordingly, based upon
a review of all of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(g)(2) by
failing to analyze all available information about the integrity of its entire pipeline.
Item 6: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(2), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (h) What actions must an operator take to address integrity issues?
… (2) Discovery of condition. Discovery of a condition occurs when an operator has
adequate information about the condition to determine that the condition presents a
potential threat to the integrity of the pipeline. An operator must promptly but no later
than 180 days after an integrity assessment, obtain sufficient information about a
condition to make that determination, unless the operator can demonstrate that the 180-
day period is impracticable.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(2), by failing to promptly,
but no later than 180 days after an integrity assessment, obtain sufficient information about the
identified conditions to make a determination that the conditions present a potential threat to the
integrity of the pipeline or, in the alternative, to demonstrate that the 180-day period was
impracticable. Specifically, the Notice alleged that TAPC, at the time of PHMSA’s inspection in
November 2011, had not taken any actions to make a determination of discovery after receiving
an integrity assessment report from its tool vendor on January 14, 2009 of the December 7, 2008
Enduro caliper tool run which identified eight indications of integrity management conditions.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all



5
of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(h)(2), by failing to obtain
sufficient information about conditions to make a determination of discovery within 180 days of
an integrity assessment and failing to demonstrate that the 180-day period was impracticable.
Item 7: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(1), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (h) What actions must an operator take to address integrity issues?
(1) General Requirements. An operator must take prompt action to address all
anomalous conditions the operator discovers through integrity assessment or information
analysis. In addressing all conditions, an operator must evaluate all anomalous conditions
and remediate those that could reduce a pipeline’s integrity. An operator must be able to
demonstrate that the remediation of the condition will ensure the condition is unlikely to
pose a threat to the long-term integrity of the pipeline. An operator must comply with
§ 195.422 when making a repair.
… (4) Special requirements for scheduling remediation.
(i) Immediate repair conditions. An operator's evaluation and remediation schedule
must provide for immediate repair conditions. To maintain safety, an operator must
temporarily reduce operating pressure or shut down the pipeline until the operator
completes the repair of these conditions. An operator must calculate the temporary
reduction in operating pressure using the formula in Section 451.6.2.2 (b) of
ANSI/ASME B31.4 (incorporated by reference, see § 195.3). An operator must treat the
following conditions as immediate repair conditions:
… (D) A dent located on the top of the pipeline (above the 4 and 8 o'clock positions)
with a depth greater than 6% of the nominal pipe diameter.
… (ii) 60-day conditions. Except for conditions listed in paragraph (h)(4)(i) of this
section, an operator must schedule evaluation and remediation of the following
conditions within 60 days of discovery of condition.
(A) A dent located on the top of the pipeline (above the 4 and 8 o'clock positions) with a
depth greater than 3% of the pipeline diameter (greater than 0.250 inches in depth for a
pipeline diameter less than Nominal Pipe Size (NPS) 12).
(B) A dent located on the bottom of the pipeline that has any indication of metal loss,
cracking or a stress riser.
… (iii) 180-day conditions. Except for conditions listed in paragraph (h)(4)(i) or (ii) of
this section, an operator must schedule evaluation and remediation of the following
within 180 days of discovery of the condition:
(A) A dent with a depth greater than 2% of the pipeline's diameter (0.250 inches in depth
for a pipeline diameter less than NPS 12) that affects pipe curvature at a girth weld or a
longitudinal seam weld.
(B) A dent located on the top of the pipeline (above 4 and 8 o'clock position) with a depth
greater than 2% of the pipeline's diameter (0.250 inches in depth for a pipeline diameter
less than NPS 12).
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(1), by failing to take action
to address eight anomalous conditions on its pipeline after the completion of an integrity
assessment that identified those conditions in January 2009. Specifically, the Notice alleged that



6
even after a PHMSA inspector called attention to the conditions in the 2009 tool vendor’s report
in discussions with TAPC personnel in November 2011, when the inspector returned in March
2012, TAPC still had not taken any actions to address these conditions or to schedule any of the
conditions for remediation if the conditions could reduce the pipeline’s integrity. Respondent
did not contest this allegation of violation. Accordingly, based upon a review of all of the
evidence, I find that Respondent violated 49 C.F.R. § 195.452(h)(1), by failing to take prompt
action to address eight anomalous conditions on its pipeline after the completion of an ILI tool
run.
Item 8: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(l)(1), which states in
relevant part:
§ 195.452 -- Pipeline integrity management in high consequence areas.
… (h) What records must be kept?
(1) An operator must maintain for review during an inspection:
… (ii) Documents to support the decisions and analyses, including any modifications,
justifications, variances, deviations and determinations made, and actions taken, to
implement and evaluate each element of the integrity management program listed in
paragraph (f) of this section.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(l)(1) by failing to properly
document certain decisions, analyses, justifications, and actions taken to implement and evaluate
each element of its IMP. Specifically, the Notice alleged that TAPC failed to document the
qualification of its Project Manager and Project Engineer for its assessments, as well as failing to
document the analyses and decisions in the evaluations of TAPC’s leak detection capability, the
need for emergency flow restricting devices on its pipeline segment to protect a high
consequence area, and measures to prevent and mitigate the consequences of a failure that could
affect a high consequence area. Respondent did not contest this allegation of violation.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated
49 C.F.R. § 195.452(l)(1) by failing to properly document the decisions, analyses, justifications,
and actions taken to implement and evaluate each element of its IMP.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without



7
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $77,400 for the violations cited above.
Item 1: The Notice proposed a civil penalty of $6,200 for Respondent’s violation of 49 C.F.R.
§ 195.452(b)(5), for failing to implement and follow its IMP as written. With respect to the
nature, circumstances, and gravity of this violation, any failure to follow a written IMP and use
the approved assessment method has the potential to impact safety. Respondent is culpable for
the violation as pipeline operators are obligated to accurately implement the IMP for the systems
they operate. Nothing in the record constitutes a good faith effort to comply prior to the OPS
inspection. TAPC neither contested the allegation nor presented any evidence or argument
justifying a reduction in or elimination of the proposed penalty. Accordingly, having reviewed
the record and considered the assessment criteria, I assess Respondent a civil penalty of $6,200
for violation of 49 C.F.R. § 195.452(b)(5).
Item 2: The Notice proposed a civil penalty of $11,200 for Respondent’s violation of 49 C.F.R.
§ 195.452(b)(5), for failing to perform annual risk assessments of its pipeline in accordance with
its written IMP procedures. With respect to the nature, circumstances, and gravity of this
violation, failure to perform documented evaluations of its risk assessment methods has the
potential to impact safety. Respondent is culpable for the violation as pipeline operators are
obligated to accurately implement the IMP for the systems they operate. Nothing in the record
constitutes a good faith effort to comply prior to the OPS inspection. TAPC neither contested
the allegation nor presented any evidence or argument justifying a reduction in or elimination of
the proposed penalty. Accordingly, having reviewed the record and considered the assessment
criteria, I assess Respondent a civil penalty of $11,200 for violation of 49 C.F.R. §
195.452(b)(5).
Item 3: The Notice proposed a civil penalty of $5,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(d)(1), for failing to assess at least 50 percent of its Category 2 line pipe in high
consequence areas before August 16, 2005. With respect to the nature, circumstances, and
gravity of this violation, failure to perform risk assessments of the highest priority pipe segments
subject to IMP requirements by the regulatory deadline has the potential to impact safety.
Respondent is culpable for the violation as pipeline operators are obligated to meet applicable
deadlines. Nothing in the record constitutes a good faith effort to comply prior to the OPS
inspection. TAPC neither contested the allegation nor presented any evidence or argument
justifying a reduction in or elimination of the proposed penalty. Accordingly, having reviewed
the record and considered the assessment criteria, I assess Respondent a civil penalty of $5,000
for violation of 49 C.F.R. § 195.452(d)(1).
Item 4: The Notice proposed a civil penalty of $5,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(d)(1), for failing to complete the required baseline assessment of all of its category 2
line pipe in high consequence areas by February 17, 2009. With respect to the nature,
circumstances, and gravity of this violation, failure to perform risk assessments of all pipe
segments subject to IMP requirements by the regulatory deadline has the potential to impact
safety. Respondent is culpable for the violation as pipeline operators are obligated to meet
applicable deadlines. Nothing in the record constitutes a good faith effort to comply prior to the
OPS inspection. TAPC neither contested the allegation nor presented any evidence or argument
justifying a reduction in or elimination of the proposed penalty. Accordingly, having reviewed



8
the record and considered the assessment criteria, I assess Respondent a civil penalty of $5,000
for violation of 49 C.F.R. § 195.452(d)(1).
Item 5: The Notice proposed a civil penalty of $10,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(g)(2), for failing to analyze all available information about the integrity of its pipeline.
With respect to the nature, circumstances, and gravity of this violation, failure to integrate and
analyze all available information about pipeline integrity has the potential to impact safety.
Respondent is culpable for the violation as pipeline operators are obligated to consider all
available information in maintaining the integrity of the systems they operate. Nothing in the
record constitutes a good faith effort to comply prior to the OPS inspection. TAPC neither
contested the allegation nor presented any evidence or argument justifying a reduction in or
elimination of the proposed penalty. Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $10,000 for violation of 49 C.F.R.
§ 195.452(g)(2).
Item 6: The Notice proposed a civil penalty of $15,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(h)(2), for failing to obtain sufficient information about conditions to make a
determination of discovery within 180 days of an integrity assessment or, in the alternative,
failing to demonstrate that the 180-day period was impracticable. With respect to the nature,
circumstances, and gravity of this violation, failure to promptly document discovery of
anomalous conditions following an ILI tool run has the potential to impact safety. Respondent is
culpable for the violation as no circumstance would have prevented Respondent from obtaining
this information promptly from the tool vendor. Nothing in the record constitutes a good faith
effort to comply prior to the OPS inspection. TAPC neither contested the allegation nor
presented any evidence or argument justifying a reduction in or elimination of the proposed
penalty. Accordingly, having reviewed the record and considered the assessment criteria, I
assess Respondent a civil penalty of $15,000 for violation of 49 C.F.R. § 195.452(h)(2).
Item 7: The Notice proposed a civil penalty of $15,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(h)(1), for failing to address eight anomalous conditions (and one possible anomalous
condition) on its pipeline after the completion of an integrity assessment. With respect to the
nature, circumstances, and gravity of this violation, failure to take action to address anomalous
conditions following an ILI tool run has the potential to impact safety. Respondent is culpable
for the violation as no circumstance would have prevented Respondent from taking action on
information that was available from the tool vendor. Nothing in the record constitutes a good
faith effort to comply prior to the OPS inspection. TAPC neither contested the allegation nor
presented any evidence or argument justifying a reduction in or elimination of the proposed
penalty. Accordingly, having reviewed the record and considered the assessment criteria, I
assess Respondent a civil penalty of $15,000 for violation of 49 C.F.R. § 195.452(h)(1).
Item 8: The Notice proposed a civil penalty of $10,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(l)(1), for failing to properly document the decisions, analyses, justifications, and
actions taken to implement and evaluate each element of its IMP. With respect to the nature,
circumstances, and gravity of this violation, failure to document decisions and actions taken to
implement its IMP has the potential to impact safety. Respondent is culpable for the violation as
pipeline operators are obligated to document such decisions to ensure affected personnel can
avail themselves of prior analyses and lessons learned in implementing the IMP. Nothing in the



9
record constitutes a good faith effort to comply prior to the OPS inspection. TAPC neither
contested the allegation nor presented any evidence or argument justifying a reduction in or
elimination of the proposed penalty. Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $10,000 for violation of 49 C.F.R.
§ 195.452(l)(1).
In summary, having reviewed the record and considered the assessment criteria for each of the
Items cited above, I assess Respondent a total civil penalty of $77,400.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
Failure to pay the $77,400 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 2, 5, 6, 7, and 8 in the Notice for
violations of 49 C.F.R. §§ 195.452(b)(5), 195.452(g)(2), 195.452(h)(2), 195.452(h)(1), and
195.452(l)(1), respectively. Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. Pursuant to the
authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
following actions to ensure compliance with the pipeline safety regulations applicable to its
operations:
1. With respect to the violation of § 195.452(b)(5) (Item 2), Respondent must
perform and fully document the risk assessment for its pipeline system per its
IMP procedures. Respondent must complete these activities within 30 days of
receipt of this Final Order, and provide written documentation confirming its
completion to the Director, Office of Pipeline Safety, PHMSA Southern Region,
within 45 days of receipt of this Final Order.
2. With respect to the violation of § 195.452(g)(2) (Item 5) and §195.452(h)(2)
(Item 6), Respondent must:
a. Review data from the 2008 and 2009 ILI tool run and identify anomalies



3. 10
which are IM conditions. This review must include analyzing, integrating,
and evaluating the data from the ILI tool runs to identify anomalies so as to
make a determination of discovery for anomalous conditions on the pipeline.
b. Complete Item 2a above by personnel who are qualified in these tasks by
knowledge, training, and experience. The qualifications of these personnel
must be fully documented.
c. Complete the requirements listed in Items 2a and 2b above within 45 days of
receipt of this Final Order and provide written documentation confirming their
completion to the Director, Office of Pipeline Safety, PHMSA Southern
Region, within 60 days of receipt of this Final Order.
With respect to the violation of § 195.452(h)(1) (Item 7), Respondent must:
a. b. c. d. e. f. Take prompt action as required by its IMP procedures and by § 195.452(h) to
address all anomalous conditions discovered on its pipeline.
Remediate those anomalous conditions that could reduce the pipeline’s
integrity, to include those determined based on Respondent’s integration and
evaluation of the data from the 2008 and 2009 ILI tool runs.
Compare the results of actual in-field evaluations of anomalies on the pipeline
to the ILI tool data and then re-evaluate the ILI tool data if the in-field results
do not correspond with the ILI tool data. If the ILI tool data is re-evaluated,
Respondent must perform the actions required by Items 2, 3a, and 3b above as
needed on the data provided by the re-evaluation.
Complete Item 3c above by personnel who are qualified in these tasks by
knowledge, training, and experience. The qualifications of these personnel
must be fully documented.
Comply with the time requirements of § 195.452(h) in addressing and
remediating anomalous conditions identified on the pipeline.
Provide the Director, Office of Pipeline Safety, PHMSA Southern Region
monthly reports on the status in completing the requirements of Items 3a, 3b,
and 3c above.
1) 2) The reports are due on the last day of the month with the first report
required on the last day of the second month following receipt of the final
order.
The reports must include at least the following information: a brief
description of the TAPC’s status in addressing and remediating all
anomalous conditions, identification of all anomalous conditions –
locations, IM condition, discovery date, status, and comments, as needed;
and the results of the respondent’s comparison of actual in-field



11
evaluations of anomalies on the pipeline to the ILI data.
3) The Director, Southern Region may allow these reports to be discontinued
once all identified anomalous conditions have been addressed, remediated,
and reported by the respondent to the Director.
4. With respect to the violation of § 195.452(l)(1) (Item 8), Respondent must
prepare and maintain adequate documentation as required by § 195.452(k) and by
its IMP within 120 days of receipt of this Final Order.
5. It is requested (not mandated) that the Respondent document safety improvement
costs associated with fulfilling this Order and submit the total to the Director,
Southern Region. These costs should be reported in two categories: total cost
associated with preparation of plans, procedures, and analyses; and total cost
associated with replacements, and other changes to pipeline infrastructure.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed. Unless the Associate Administrator, upon request, grants a stay, all
other terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety