# RAINBOW VILLAGE — Warning Letter

- **operation:** document
- **citation:** CPF 220130019W
- **title:** RAINBOW VILLAGE — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-05-02
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.465(a), 192.625(f), 192.721, 192.747.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220130019w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220130019w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220130019w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220130019W
**body:**

Warning Letter involving RAINBOW VILLAGE. PHMSA's enforcement data identifies the cited regulations as 192.465(a),  192.625(f),  192.721,  192.747. The case was opened on 2013-05-02 and is reported as closed as of 2013-05-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220130019W_warning letter_05022013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220130019W/220130019W_warning%20letter_05022013.pdf

220130019W_warning letter_05022013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220130019W/220130019W_warning%20letter_05022013_text.pdf

220130019W_warning letter_05022013_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 2, 2013
Ms. Debbie Martin
Assistant Director
Pinellas County Housing Authority
11479 Palmerton Road
Largo, FL 33774
CPF 2-2013-0019W
Dear Ms. Martin:
On March 19, 2013, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Southern Region, Office of Pipeline Safety, pursuant to Chapter
601 of 49 United States Code, inspected the Rainbow Village master meter and downstream
piping and facilities at 12301 134th Avenue N, Largo, Florida.
As a result of the inspection, it appears that Rainbow Village has committed probable
violations of the Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The
items inspected and the probable violations are as follows:
1. §192.465 External corrosion control: Monitoring.
(a) Each pipeline that is under cathodic protection must be tested at least once each
calendar year, but with intervals not exceeding 15 months, to determine whether the
cathodic protection meets the requirements of §192.463. However, if tests at those
intervals are impractical for separately protected short sections of mains or
transmission line, not in excess of 100 feet (30 meters), or separately protected
service line, these pipelines may be surveyed on a sampling basis. At least 10 percent
of these protected structures, distributed over the entire system must be surveyed
each calendar year, with a different 10 percent checked each subsequent year, so
that the entire system is tested in each 10-year period.
Rainbow Village did not present to the PHMSA inspector any records to demonstrate that
it had monitored its approximately 2.5 miles of cathodically protected BIW coated pipe in
calendar year 2012.



2. §192.625 Odorization of gas.
... (f) To assure the proper concentration of odorant in accordance with this section,
each operator must conduct periodic sampling of combustible gases using an
instrument capable of determining the percentage of gas in air at which the odor
becomes readily detectable. Operators of master meter systems may comply with
this requirement by-
(1) Receiving written verification from their gas source that the gas has the proper
concentration of odorant; and
(2) Conducting periodic "sniff" tests at the extremities of the system to confirm that
the gas contains odorant.
Rainbow Village did not present to the PHMSA inspector any records to demonstrate that
it had assured the proper concentration of odorant in its pipeline system by receiving
written verification from its gas source that the gas has the proper concentration of
odorant or by conducting periodic "sniff" tests at the extremities of the system to confirm
that the gas contains odorant.
3. §192.721 Distribution systems: Patrolling.
(a) The frequency of patrolling mains must be determined by the severity of the
conditions which could cause failure or leakage, and the consequent hazards to
public safety.
(b) Mains in places or on structures where anticipated physical movement or
external loading could cause failure or leakage must be patrolled -
(1) In business districts, at intervals not exceeding 4 1/2 months, but at least four
times each calendar year; and
(2) Outside business districts, at intervals not exceeding 7 1/2 months, but at least
twice each calendar year.
Rainbow Village did not present to the PHMSA inspector any records to show it patrolled
its distribution system in the residential area at intervals not exceeding 7½ months, but at
least twice each calendar year in 2001 and 2012.
4. §192.747 Valve maintenance: Distribution systems.
(a) Each valve, the use of which may be necessary for the safe operation of a
distribution system, must be checked and serviced at intervals not exceeding 15
months, but at least once each calendar year.
(b) Each operator must take prompt remedial action to correct any valve found
inoperable, unless the operator designates an alternative valve.
Rainbow Village did not present to the PHMSA inspector any records to demonstrate that
it had checked and serviced its shut off (or key valve) which may be necessary for the safe
operation of its distribution system at intervals not exceeding 15 months, but at least once
each calendar year.
Under 49 United States Code, §60122, Rainbow Village is subject to a civil penalty not to
exceed $200,000 per violation per day the violation persists up to a maximum of $2,000,000
2



for a related series of violations. For violations occurring prior to January 4, 2012, the
maximum penalty may not exceed $100,000 per violation per day, with a maximum penalty
not to exceed $1,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the items identified in this letter. Failure to do so will result in the
Rainbow Village being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 2-2013-0019W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
3
- **truncated:** false