# COLUMBIA GAS TRANSMISSION, LLC — Safety Order

- **operation:** document
- **citation:** CPF 220131005S
- **title:** COLUMBIA GAS TRANSMISSION, LLC — Safety Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-08-20
- **effective on:** Not available
- **summary:** CLOSED safety order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220131005s.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220131005s.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220131005s
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220131005S
**body:**

Safety Order involving COLUMBIA GAS TRANSMISSION, LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2013-08-20 and is reported as closed as of 2014-06-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220131005S_closure letter_06252014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_closure%20letter_06252014.pdf

220131005S_closure letter_06252014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_closure%20letter_06252014_text.pdf

220131005S_Consent Agreement_11212013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_Consent%20Agreement_11212013.pdf

220131005S_Consent Agreement_11212013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_Consent%20Agreement_11212013_text.pdf

220131005S_Consent Order_02052014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_Consent%20Order_02052014.pdf

220131005S_Consent Order_02052014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_Consent%20Order_02052014_text.pdf

220131005S_NOPSO_08202013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_NOPSO_08202013.pdf

220131005S_NOPSO_08202013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220131005S/220131005S_NOPSO_08202013_text.pdf

220131005S_Consent Agreement_11212013_text.pdf

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
Southern Region
Atlanta, GA 30303
____________________________________
In the Matter of )
)
)
Columbia Gas Transmission LLC )
Respondent )
____________________________________)
) CPF 2-2013-1005S
CONSENT AGREEMENT
On August 20, 2013, the Pipeline and Hazardous Materials Safety Administration (PHMSA),
U.S. Department of Transportation, issued to Columbia Gas Transmission LLC (CGT or
Respondent) a Notice of Proposed Safety Order (NOPSO). The Notice alleged that conditions
exist on CGT's pipeline facilities that pose a pipeline integrity risk to public safety, property, or
the environment. The Notice also proposed that Respondent take certain corrective measures to
correct the alleged conditions and ensure that the public, property, and the environment are
protected from the potential risk.
CGT responded to the Notice by letter dated September 17, 2013 (Response). Respondent
acknowledged receipt of the proposed safety order and requested an informal consultation,1
which was held October 8, 2013, in the Office of Pipeline Safety, Southern Region, Atlanta,
Georgia.
During the informal consultation, PHMSA and CGT agreed that settlement of this proceeding
will avoid further administrative proceedings or litigation and that entry into this Consent
Agreement is the most appropriate means of resolving the Notice; therefore, pursuant to 49
C.F.R. Part 190, without adjudication of any issue of fact or law, and upon consent and
agreement of Respondent and PHMSA ("the Parties"), the Parties agree as follows:
I. General Provisions
1. Respondent acknowledges that as operator of the pipeline, Respondent and its pipeline
system are subject to the jurisdiction of the Federal pipeline safety laws, 49 U.S.C. § 60101
et seq., and the regulations and administrative orders issued thereunder. For purposes of this
Consent Agreement, Respondent acknowledges that it received proper notice of PHMSA's action
1 CGT's Response is incorporated into this Consent Agreement in whole (see attached).



2
in this proceeding and that the Notice states claims upon which relief may be granted pursuant to
49 U.S.C. 60101 et seq. and the regulations and orders issued thereunder.
2. Respondent does not admit or deny any allegation or conclusion in the Notice but agrees,
for purposes of this Consent Agreement, that the condition identified in the Notice exists and
agrees to address it by completing the actions specified in Section II of this agreement
(“Corrective Measures”). These actions, including any work plans and schedules, shall
automatically be incorporated into this agreement. This Consent Agreement does not constitute
a finding of violation of any Federal law or regulation and therefore may not be used in any civil
proceeding of any kind as evidence or proof of any fact, fault or liability, or as evidence of the
violation of any law, rule, regulation or requirement, except in a proceeding to enforce the
provisions of this agreement or in future PHMSA enforcement actions.
3. After Respondent returns this signed agreement, PHMSA's representative will present it to
the Associate Administrator for Pipeline Safety recommending that the Associate Administrator
adopt the terms of this agreement by issuing an administrative order (Consent Order)
incorporating the terms of this Consent Agreement. The terms of this agreement constitute an
offer of settlement until accepted by the Associate Administrator.
4. Respondent consents to the issuance of the Consent Order, and hereby waives any further
procedural requirements with respect to its issuance. Respondent waives all rights to contest the
adequacy of notice, or the validity of the Consent Order or this Consent Agreement, including all
rights to administrative or judicial hearings or appeals.
5. This Consent Agreement shall apply to and be binding upon PHMSA, and upon
Respondent, its officers, directors, and employees, and its successors, assigns, or other entities or
persons otherwise bound by law. Respondent agrees to provide a copy of this agreement and any
incorporated work plans and schedules to all of Respondent's officers, employees, and agents
whose duties might reasonably include compliance with this agreement.
6. For all transfers of ownership or operating responsibility of Respondent’s pipeline,
Respondent must provide a copy of this Consent Agreement to the prospective transferee at least
30 days prior to such transfer and simultaneously provide written notice of the prospective
transfer to the PHMSA Regional Director who issued the Notice.
7. This Consent Agreement constitutes the final, complete and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this agreement, and
the Parties acknowledge that there are no representations, agreements or understandings relating
to the settlement other than those expressly contained in this agreement, except that the terms of
this agreement may be construed by reference to the Notice.
8. Nothing in this Consent Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101
et seq., and the regulations and orders issued thereunder. Nothing in this agreement alters
PHMSA's right of access, entry, inspection, and information gathering or PHMSA's authority to
bring enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.



3
9. This Consent Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent's pipeline systems. This agreement is not a permit,
or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
10. This Consent Agreement does not create rights in, or grant any cause of action to, any
third party not party to this agreement. The U.S. Department of Transportation is not liable for
any injuries or damages to persons or property arising from acts or omissions of Respondent or
its officers, employees, or agents carrying out the work required by this agreement. The U.S.
Department of Transportation, its officers, employees, agents, and representatives are not liable
for any cause of action arising from any acts or omissions of Respondent or its contractors in
carrying out any work required by this agreement.
II. Corrective Measures
11. Upon issuance of the Consent Order, Respondent agrees to perform the Proposed
Corrective Measures set forth in the Notice of Proposed Safety Order, which is hereby
incorporated into this Consent Agreement. This includes, but is not limited to, the replacement of
all temporary pipe in Line PM-3 within 180 days from the date of the Consent Order.
12. Respondent agrees to maintain documentation of the costs associated with the
implementation of the Proposed Safety Order. Respondent will include in the third monthly
report and every third monthly report it submits thereafter pursuant to this paragraph, the to-date
total costs associated with: (1) testing, evaluations and information analysis; (2) revisions of
procedures and additional monitoring and inspections; and (3) physical changes to pipeline
infrastructure, including repairs, replacements and other modifications.
14. The Regional Director may grant an extension of time for Respondent to complete any of
the work to be performed if Respondent submits a timely written request demonstrating good
cause for an extension.
III. Review and Approval Process
15. With respect to any submission under Section II of this Consent Agreement that requires
the approval of the Regional Director, the Director may: (a) approve, in whole or in part, the
submission, (b) approve the submission on specified conditions, (c) disapprove, in whole or in
part, the submission, or (d) any combination of the foregoing. If the Regional Director approves,
approves in part, or approves with conditions, Respondent will take all action as approved by the
Director, subject to Respondent's right to invoke the dispute resolution procedures in Section IV
with respect to any conditions the Director identifies. If the Director disapproves all or any
portion of the submission, the Director will provide Respondent with a written notice of the
deficiencies. Respondent will correct all deficiencies within the time specified by the Director
and resubmit it for approval.



4
IV. Dispute Resolution
16. The Regional Director and Respondent will informally attempt to resolve any disputes
arising under this Consent Agreement. If Respondent and the Regional Director are unable to
informally resolve the dispute within 15 days, Respondent may request in writing, within 10
days, a written determination resolving the dispute from the Associate Administrator for Pipeline
Safety providing all information that Respondent believes is relevant to the dispute. If the request
is submitted as provided herein, the Associate Administrator will issue a final determination in
writing. The existence of a dispute and PHMSA's consideration of matters placed in dispute will
not excuse, toll, or suspend any term or timeframe for completion of any work to be performed
under this agreement during the pendency of the dispute resolution process except as agreed by
the Regional Director or the Associate Administrator in writing.
V. Enforcement
17. This Consent Agreement, as adopted by the Consent Order, is subject to all enforcement
authorities available to PHMSA under 49 U.S.C. § 60101 et seq. and 49 C.F.R. Part 190,
including administrative civil penalties under § 60122 of up to $200,000 per violation for each
day the violation continues, if PHMSA determines that Respondent is not proceeding according
to the terms of the agreement, determinations made by the Regional Director, or if appealed,
decisions of the Associate Administrator. All work plans and associated schedules set forth or
referenced in Section II will be automatically incorporated into this Consent Agreement and are
enforceable in the same manner.
VI. Record Keeping and Information Disclosure
18. Respondent agrees to maintain records demonstrating compliance with all requirements
of this Consent Agreement for a period of at least five years following completion of all work to
be performed. For any reports, plans, or other deliverables required to be submitted to PHMSA
pursuant to this Consent Agreement, Respondent may assert a claim of business confidentiality
or other protections applicable to the release of information by PHMSA, covering part or all of
the information required to be submitted to PHMSA pursuant to this agreement in accordance
with 49 C.F.R. Part 7. Respondent must mark the claim of confidentiality in writing on each
page, and include a statement specifying the grounds for each claim of confidentially. PHMSA
determines release of any information submitted pursuant to this Consent Agreement in
accordance with 49 C.F.R. Part 7, the Freedom of Information Act, 5 U.S.C. § 552, DOT and/or
PHMSA policies, and other applicable regulations and Executive Orders.
VII. Effective Date
19. The "Effective Date" as used herein is the date on which this Consent Agreement has
been signed by both Respondent and PHMSA.
VIII. Modification
20. The terms of this Consent Agreement may be modified by mutual agreement of the
parties. Such modifications must be in writing and signed by both parties.



5
IX. Termination
21. This Consent Agreement terminates upon completion of all terms set forth in Section II
(Corrective Measures) as determined by the Director, Southern Region. Respondent may request
written confirmation from PHMSA when this agreement is terminated. To the extent ongoing
monitoring is required; PHMSA may terminate this agreement with respect to all other
requirements with the exception of such monitoring. Nothing in this agreement prevents
Respondent from completing any of the obligations earlier than the deadlines provided for in this
Agreement.
X. Ratification
22. The Parties undersigned representatives certify that they are fully authorized to enter into
the terms and conditions of this Consent Agreement and to execute and legally bind such party to
this document.
23. The Parties hereby agree to all conditions and terms of this Consent Agreement:
For PHMSA: For Respondent:
_______________________________ _________________________________
Wayne T. Lemoi Date Shawn L. Patterson Date
Director, Office of Pipeline Safety President,
PHMSA Southern Region Operations & Project Delivery
U.S. Department of Transportation Columbia Gas Transmission LLC

220131005S_closure letter_06252014_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 25, 2014
Mr. Shawn L. Patterson
President, Operations & Product Delivery
Columbia Gas Transmission LLC
1700 MacCorkle Avenue SE
Charleston, WV 25314
CPF 2-2013-1005S
Dear Mr. Patterson:
On February 5, 2014, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued a Consent Order (Order) to Columbia Gas Transmission LLC (CGT) incorporating the
terms of a Consent Agreement signed by PHMSA on November 4, 2013, and CGT on
November 21, 2013.
The Consent Agreement resulted from a Notice of Proposed Safety Order (Notice) issued to
CGT alleging that “CGT’s 20-inch natural gas ‘Line PM-3’ pipeline or a portion thereof has
an apparent condition that, without corrective measures, would pose a pipeline integrity risk
to public safety, property, or the environment.” Specifically, the Notice alleged that a mining
operation conducted on a hillside in Floyd County, Kentucky, caused an unstable landslide
condition that resulted in CGT temporarily replacing 1,221 feet of pipe in April 2012 and
leaving approximately 1,357 feet of Line PM-3 exposed and lying on or suspended on the
unstable hillside.
The PHMSA Southern Region has received and reviewed CGT’s letter of June 12, 2014, in
which CGT summarized the actions it has taken to comply with the Order. Our review
confirms that CGT has met the terms of the Order. Therefore, no further action is necessary
with regards to this Order and this case is now closed.
Please be advised that this letter refers only to the Consent Order (CPF 2-2013-1005S) and
not to other PHMSA pending cases, if any. Also be advised that nothing herein states or
implies that the above described Line PM-3 meets the requirements of the federal pipeline
safety regulations. The pipeline system remains subject to inspection by PHMSA.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline
PHMSA Southern Region

220131005S_Consent Order_02052014_text.pdf

FEBRUARY 5, 2014
Mr. Shawn L. Patterson
President
Columbia Gas Transmission
1700 MacCorkle Avenue SE
Charleston, WV 25314
Re: CPF No. 2-2013-1005S
Dear Mr. Patterson:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement that you
signed on November 21, 2013. Service of the Consent Order and Consent Agreement by
certified mail is deemed effective upon the date of mailing, or as otherwise provided under
49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Wayne T. Lemoi, Director, Southern Region, PHMSA
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Columbia Gas Transmission LLC ) CPF No. 2-2013-1005S
)
Respondent. )
____________________________________)
CONSENT ORDER
By letter dated August 20, 2013 the Pipeline and Hazardous Materials Safety Administration
(PHMSA) Office of Pipeline Safety issued a Notice of Proposed Safety Order (Notice) to
Columbia Gas Transmission LLC (Respondent) in this case.
In accordance with 49 C.F.R. § 190.239, the Notice alleged that Respondent’s Line PM-3
extending from Knott County, Kentucky and terminating at the Boldman Compressor Station in
Pike County, Kentucky has an apparent condition that, without corrective measures, would pose
a pipeline integrity risk to public safety, property, or the environment and proposed that
Respondent take certain actions to address the condition. Specifically, the Notice alleged that
approximately 1,357 feet of Line PM-3 is exposed and lying on (or suspended from) the hillside
from approximately station 1406+00 to station 1419+57.
In response to the Notice, Respondent requested an informal consultation and Respondent and
PHMSA engaged in good faith settlement discussions resulting in the Consent Agreement
attached to this Order that settles all of the allegations in the Notice.
Accordingly, the foregoing Consent Agreement is hereby approved and incorporated by
reference into this Order. The Respondent is hereby ordered to comply with terms of the
Consent Agreement, effective immediately.



Pursuant to 49 U.S.C. 60101 et seq., failure to comply with this Consent Order [2-2013-1005S]
may result in the assessment of civil penalties of up to $200,000 per violation per day, or in the
referral of the case for judicial enforcement. The terms and conditions of this Consent Order are
effective upon service in accordance with 49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 19259
