# CONTINUUM MIDSTREAM LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 220136007M
- **title:** CONTINUUM MIDSTREAM LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-09-09
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(12), 195.402(c)(13), 195.402(c)(14), 195.402(d)(1), 195.402(e)(2), 195.402(e)(8), 195.403(a)(1), 195.403(b)(1), 195.403(c), 195.420(a), 195.428(a), 195.505(g), 195.505(i), 195.509(e).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220136007m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220136007m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220136007m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220136007M
**body:**

Notice of Amendment involving CONTINUUM MIDSTREAM LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(12),  195.402(c)(13),  195.402(c)(14),  195.402(d)(1),  195.402(e)(2),  195.402(e)(8),  195.403(a)(1),  195.403(b)(1),  195.403(c),  195.420(a),  195.428(a),  195.505(g),  195.505(i),  195.509(e). The case was opened on 2013-09-09 and is reported as closed as of 2014-04-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220136007M_Closure Letter_04022014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220136007M/220136007M_Closure%20Letter_04022014.pdf

220136007M_notice of amendment_09092013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220136007M/220136007M_notice%20of%20amendment_09092013.pdf

220136007M_notice of amendment_09092013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220136007M/220136007M_notice%20of%20amendment_09092013_text.pdf

220136007M_Operator Response Notice_10282013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220136007M/220136007M_Operator%20Response%20Notice_10282013.pdf

220136007M_Closure Letter_04022014.pdf

U.S. Department
233 Peachtree Street Ste. 600
of Transportation
Atlanta, GA 30303
Pipeline and
Administration
Hazardous Materials Safety
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 2, 2014
Mr. Jason Few
Chief Executive Officer
Seminole Gas Company
1323 E 71 Street, Suite 300
Tulsa, OK 74136
CPF 2-2013-6007M
Dear Mr. Few:
On March 3, 2014, I received your written response to my February 6, 2014, letter to you
regarding Seminole's inadequate response to the above referenced Notice of Amendment
(NOA); specifically items 6, 10, and 11. In your letter you asked for clarification regarding
my February 6, 2014, letter. You state,
"Seminole and your office agreed to and received
acknowledgement of... " certain proposed changes regarding NOA items 6, 10, and 11.
To clarify, my office did not previously agree to, acknowledge, or approve the proposed
procedural changes described in your February 21, 2014, letter to me. The federal pipeline
safety regulations grant the Associate Administrator for Pipeline Safety the authority to
determine if your procedures are adequate. That authority has been delegated to me by the
Associate Administrator - it was not granted to an inspector in my region.
Moving forward, we have reviewed all your submittals in response to the NOA and have
determined that your responses have complied with the terms of the NOA. No further action
is necessary with regards to the NOA. This case is now closed.
While not required by the NOA, in almost all cases operators send us their amended written
procedures so that we can fully evaluate the procedures themselves to determine if they
appear to be adequate. Since Seminole did not provide us with the actual written procedures,
we will be closely evaluating these procedures during our next inspection.
If you have any questions on this or any other pipeline safety issue, please contact my office
at (404) 832-1147.
Sincerely,
Van ome
Director, Office of Pipeline Safety
PHMSA Southern Region

220136007M_notice of amendment_09092013_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 9, 2013
Mr. Jason Few
Chief Executive Officer
Seminole Gas Company
1323 E 71st Street, Suite 300
Tulsa, OK 74136
CPF 2-2013-6007M
Dear Mr. Few:
From April 1-3, 2013, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Southern Region, Office of Pipeline Safety inspected the Seminole
Gas Company (Seminole) Seminole Murphy Liquids Terminal (SMLT) pipeline’s written
Hazardous Liquids Operations, Maintenance and Emergency Manual (HLOMEM) and
Emergency Response Plan (ERP) in Bulls Gap, Tennessee, pursuant to Chapter 601 of
49 United States Code.
On the basis of the inspection, PHMSA has identified apparent inadequacies within
Seminole’s written HLOMEM and ERP procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (c) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following to provide safety during
maintenance and normal operations:
… (12) Establishing and maintaining liaison with fire, police, and other appropriate
public officials to learn the responsibility and resources of each government
organization that may respond to a hazardous liquid or carbon dioxide pipeline
emergency and acquaint the officials with the operator's ability in responding to a
hazardous liquid or carbon dioxide pipeline emergency and means of
communication.
Seminole’s procedures did not address liaison with fire, police, and other public officials
to learn the responsibilities and resources of these organizations nor to acquaint the
officials in these organizations with Seminole's ability to respond to a pipeline emergency
and to acquaint them with Seminole’s communications.



That is, while Seminole's HLOMEM Section VII J, PUBLIC EDUCATION (195.440)
addressed using the Tennessee One-Call’s Partners in Protecting Everyone program to
meet with officials and acquaint them with the SMLT facilities, the procedures did not
address how Seminole personnel would learn the responsibilities and resources of the
government organizations or how Seminole would acquaint the officials with Seminole's
ability to respond to a pipeline emergency or acquaint them with Seminole’s
communications.
2. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (c) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following to provide safety during
maintenance and normal operations:
… (13) Periodically reviewing the work done by operator to determine the
effectiveness of the procedures used in normal operation and maintenance and
taking corrective action where deficiencies are found.
Seminole’s procedures did not include procedures covering the periodic review of work
done by Seminole or contractor personnel to determine the effectiveness of procedures
used in maintenance and operations, and for taking corrective action when deficiencies are
found.
That is, while Seminole's HLOMEM Section VII D, (TRAINING (195.402 AND 403)
required the implementation of a continuing training program that would include
periodically reviewing the work done by personnel to determine the effectiveness of
procedures and taking corrective action when deficiencies are found, neither the training
program or the HLOMEM had procedures explaining how Seminole would actually
accomplish these tasks.
3. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (c) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following to provide safety during
maintenance and normal operations:
… (14) Taking adequate precautions in excavated trenches to protect personnel
from the hazards of unsafe accumulations of vapor or gas, and making available
when needed at the excavation, emergency rescue equipment, including a breathing
apparatus and, a rescue harness and line.
Seminole’s HLOMEM procedures for excavation activities did not address the protection
of personnel in excavated trenches from unsafe accumulations of vapor or gas and making
rescue equipment available when needed.
4. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (d) Abnormal operation. The manual required by paragraph (a) of this section
must include procedures for the following to provide safety when operating design
limits have been exceeded:
(1) Responding to, investigating, and correcting the cause of:
(i) Unintended closure of valves or shutdowns;
(ii) Increase or decrease in pressure or flow rate outside normal operating limits;
(iii) Loss of communications;
2



(iv) Operation of any safety device;
(v) Any other malfunction of a component, deviation from normal operation, or
personnel error which could cause a hazard to persons or property.
Seminole's procedures for responding to, investigating and correcting the cause of an
abnormal operating condition did not provide clear and consistent guidelines on actions
that Seminole personnel would take to respond to, investigate, and correct the cause of an
abnormal operating condition.
Seminole’s procedure for abnormal operations provides general and conflicting guidance.
Section VII, M. Abnormal Operation, of the HLOMEM stated, "When there is doubt about
possible injury to personnel or damage to facilities, the Pipeline shall be shut down and
an inspection performed.” However, in its suggested actions for possible abnormal
operations, Seminole procedures required contacting the Pipeline Supervisor, monitoring
the situation, and other actions; but, the suggested actions did not include the requirements
to shut down the pipeline and inspect the pipeline to determine the cause of the abnormal
operating condition.
5. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (e) Emergencies. The manual required by paragraph (a) of this section must
include procedures for the following to provide safety when an emergency condition
occurs:
... (2) Prompt and effective response to a notice of each type emergency, including
fire or explosion occurring near or directly involving a pipeline facility, accidental
release of hazardous liquid or carbon dioxide from a pipeline facility, operational
failure causing a hazardous condition, and natural disaster affecting pipeline
facilities.
… (5) Control of released hazardous liquid or carbon dioxide at an accident scene to
minimize the hazards, including possible intentional ignition in the cases of
flammable highly volatile liquid.
Seminole’s procedures did not provide clear and consistent guidance for personnel to
respond to an emergency such as fire or explosion, accidental release of a hazardous
liquid, operational failure, natural disaster, and controlling the release of a highly volatile
liquid (HVL).
Seminole’s emergency response procedures in Section V Emergency Plan of the
HLOMEM did not provide clear and consistent guidance to personnel on actions to take to
control a release, and on who has authority to take the actions necessary to control a
release. Section V, A.2 required “... the first employee to become aware of the emergency
shall take such action as is necessary in their best judgment.” In extreme emergencies, B.2
required “...the employee should contact the Pipeline Supervisor or their designate,
advising them of the situation, and they stand-by for further instructions” after obtaining
information on the emergency, and C.1.e required “To minimize the emergency situation,
consideration shall be given to closing block valves, initiating emergency shutdown,
pressure reduction and/or preventing/minimizing the release of HVL or other hazardous
vapors.” The procedures were not clear on what actions an employee is authorized and
required to take in an emergency to control a release.
3



6. §195.402 Procedural manual for operations, maintenance, and emergencies.
… (e) Emergencies. The manual required by paragraph (a) of this section must
include procedures for the following to provide safety when an emergency condition
occurs:
… (8) In the case of failure of a pipeline system transporting a highly volatile liquid,
use of appropriate instruments to assess the extent and coverage of the vapor cloud
and determine the hazardous areas.
Seminole’s transports an HVL in its SMLT pipeline but its procedures for verifying the
extent and coverage of a vapor cloud and hazardous areas did not provide sufficient detail
for Seminole personnel to safely make the determinations, if required.
Seminole's HLOMEM Section V (Emergency Plan), C.2.a stated that Seminole would
determine the extent and coverage of a vapor cloud and hazardous areas using a
Combustible Gas Indicator (CGI). The procedure did not, however, provide guidance on
how Seminole would determine the initial possible extent of the vapor cloud so that
Seminole personnel could begin to monitor the actual vapor cloud with a CGI safely from
outside the limits of the vapor cloud. Nor did the procedure explain exactly how Seminole
would use a CGI to determine the actual extent and coverage of a vapor cloud and
hazardous areas.
7. §195.403 Emergency response training.
(a) Each operator shall establish and conduct a continuing training program to
instruct emergency response personnel to:
(1) Carry out the emergency procedures established under 195.402 that relate to
their assignments;
Seminole’s Emergency Response Training Plan did not incorporate a continuing training
program to instruct emergency response personnel to carry out the emergency procedures
established under §195.402 that relate to their assignments.
Seminole’s Emergency Response Training Plan also did not include performance training
on emergency procedures and it did not clearly designate employees responsible for
carrying out emergency response activities. Moreover, while Section I. (E) Employee
Training of the Emergency Response Plan makes reference to requirements and periodic
drills, it did not list established requirements and training intervals.
8. §195.403 Emergency response training.
... (b) At intervals not exceeding 15 months, but at least once each calendar year,
each operator shall:
(1) Review with personnel their performance in meeting the objectives of the
emergency response training program set forth in paragraph (a) of this section; and
Seminole’s procedures did not require a review of their personnel’s performance in
meeting the objectives of their emergency response training program at intervals not
exceeding 15 months, but at least once each calendar year.
Seminole's HLOMEM Section VII D TRAINING (195.402 AND 403).1.i stated, “At
intervals not exceeding three (3) years the training program’s effectiveness will be
reviewed by a review of employee performance.” This procedure states that the
4



effectiveness of the training program itself, not the performance of employees, would be
evaluated by reviewing employee performance. While there is nothing incorrect about
this additional requirement to evaluate the effectiveness of the training though employee
performance, the regulations specifically require each employee’s performance to be
evaluated at intervals not exceeding 15 months, but at least once each calendar year, to
determine if the employee’s performance met the objectives of the emergency response
training program.
9. §195.403 Emergency response training.
... (c) Each operator shall require and verify that its supervisors maintain a thorough
knowledge of that portion of the emergency response procedures established under
§195.402 for which they are responsible to ensure compliance.
Seminole's procedures did not require that supervisors maintain a thorough knowledge of
the emergency response procedures they are responsible for and that this is verified.
10. §195.420 Valve maintenance.
(a) Each operator shall maintain each valve that is necessary for the safe operation of
its pipeline systems in good working order at all times.
(b) Each operator shall, at intervals not exceeding 71⁄2 months, but at least twice each
calendar year, inspect each mainline valve to determine that it is functioning
properly.
Seminole's procedures for maintaining and inspecting valves did not require that all valves
necessary for the safe operation of the pipeline be maintained, and that mainline valves be
inspected at least twice each calendar year, at intervals not exceeding 7½ months.
Seminole's HLOMEM Section VIII B. VALVE MAINTENANCE (195.420) stated, “The
objective is to insure safe and proper operation of critical/emergency valves on the
Pipeline.” But, Seminole's procedures did not require that all valves necessary for the
safe operation of its pipeline be maintained and, while it required the inspection of
critical/emergency valves, it did not identify these valves. That is, Seminole did not
provide information on which valves along its pipeline are critical/emergency valves.
11. §195.428 Overpressure safety devices and overfill protection systems.
(a) Except as provided in paragraph (b) of this section, each operator shall, at
intervals not exceeding 15 months, but at least once each calendar year, or in the
case of pipelines used to carry highly volatile liquids, at intervals not to exceed 71⁄2
months, but at least twice each calendar year, inspect and test each pressure limiting
device, relief valve, pressure regulator, or other item of pressure control equipment
to determine that it is functioning properly, is in good mechanical condition, and is
adequate from the standpoint of capacity and reliability of operation for the service
in which it is used.
Seminole transports an HVL in its SMLT pipeline but its procedures did not require that
each relief device be checked for adequate capacity at intervals not to exceed 71⁄2 months,
but at least twice each calendar year.
That is, Seminole's HLOMEM Section VII G. OVERPRESSURE PROTECTION (195.428)
incorrectly stated, “Unless a field test to determine relief capacity is shown to be feasible
5



and can be performed at one year intervals, [emphasis added] a review and calculation of
the required capacity of each relief valve will be made.”
12. §195.505 Qualifications program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
… (g) Identify those covered tasks and the intervals at which evaluation of the
individual's qualifications is needed;
Seminole's Operator Qualification Plan (OQP) did not address the intervals at which
evaluation of the individual's qualifications is needed.
Seminole's (OQP) did not adequately address and identify the interval at which
individuals would be re-evaluated to perform covered tasks. The Evaluation Methods and
Ongoing Evaluation section of the OQP addressed a risk based method for determining
re-evaluation intervals for covered tasks, but there were no intervals in this section or in
the List of Covered Tasks section of the OQP.
13. §195.505 Qualifications program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
... (i) After December 16, 2004, notify the Administrator or a state agency
participating under 49 U.S.C. Chapter 601 if the operator significantly modifies the
program after the Administrator or state agency has verified that it complies with
this section.
Seminole's OQP did not include a procedure to notify the Administrator or state agency if
the program is significantly modified.
14. §195.509 General.
... (e) After December 16, 2004, observation of on-the-job performance may not be
used as the sole method of evaluation.
Seminole's OQP did not adequately explain that observation of on-the-job performance
may not be used as the sole method of evaluation.
Seminole's OQP addresses evaluation methods in the Premises and Definitions and the
Evaluation Methods and Ongoing Evaluation sections and included on-the-job
performance as a method of evaluation. However neither section of the OQP explained
that observation of on-the-job performance may not be used as the sole method of
evaluation.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. §60108(a) and 49 C.F.R. §190.237.
Enclosed as part of this Notice is a document entitled Response Options for Pipeline
Operators in Compliance Proceedings. Please refer to this document and note the
response options. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with
6



the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why
you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b). If you do not respond within 30 days of receipt of this Notice, this constitutes a
waiver of your right to contest the allegations in this Notice and authorizes the Associate
Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 30 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that Seminole Gas Company maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Wayne T. Lemoi, Director,
Southern Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 2-2013-6007M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
7