# STARRETT BUILDING CO (17263) — Warning Letter

- **operation:** document
- **citation:** CPF 220140014W
- **title:** STARRETT BUILDING CO (17263) — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-08-11
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.1015(a), 192.11(b), 192.465(d), 192.605(a), 192.614(a), 192.615(a), 192.625(f)(1), 192.625(f)(2), 192.721(b)(2), 192.809(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220140014w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220140014w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220140014w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220140014W
**body:**

Warning Letter involving STARRETT BUILDING CO (17263). PHMSA's enforcement data identifies the cited regulations as 192.1015(a),  192.11(b),  192.465(d),  192.605(a),  192.614(a),  192.615(a),  192.625(f)(1),  192.625(f)(2),  192.721(b)(2),  192.809(a). The case was opened on 2014-08-11 and is reported as closed as of 2014-08-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220140014W_warning letter_08112014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220140014W/220140014W_warning%20letter_08112014.pdf

220140014W_warning letter_08112014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220140014W/220140014W_warning%20letter_08112014_text.pdf

220140014W_warning letter_08112014_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 11, 2014
Mr. Jeff Biegelsen
Owner & President
Starrett Building Company
740 South Andrews Avenue
Fort Lauderdale, FL 33316
CPF 2-2014-0014W
Dear Mr. Biegelsen:
On June 23-27, 2014, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Southern Region, Office of Pipeline Safety, pursuant to Chapter
601 of 49 United States Code, inspected the Starrett Building Company (Starrett) liquefied
petroleum gas (LPG) facilities and records in Ft. Lauderdale and Hollywood, Florida.
As a result of the inspection, it appears that Starrett has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are as follows:
1. §192.11 Petroleum gas systems.
… (b) Each pipeline system subject to this part that transports only petroleum gas or
petroleum gas/air mixtures must meet the requirements of this part and of
ANSI/NFPA 58 and 59.1
Starrett did not operate its LPG pipeline system to meet the requirements of Part 192 and
ANSI/NFPA 58. Section 6.14 in NFPA 58 (2004 Edition) requires all metallic equipment
and components to be coated or protected to minimize corrosion.
1 Part 192 currently incorporates by reference NFPA 58 (2004) “Liquefied Petroleum Gas (LP – Gas Code)” and
NFPA 59 (2004) “Utility LP-Gas Plant Code.”



A review of Starrett’s records showed that it took cathodic protection tank-to-soil readings
on several of its buried metallic storage tanks in September 2012 and in December 2013.
These readings ranged from - 439 mV to - 823 mV. None of the readings met the criteria
for minimum cathodic protection contained in 49 CFR Part 192, Appendix D.2
2. § 192.465 External corrosion control: Monitoring.
... (d) Each operator shall take prompt remedial action to correct any deficiencies
indicated by the monitoring.
Starrett did not take prompt remedial action to correct external corrosion control
deficiencies identified by its monitoring. Starrett identified many low3 pipe-to-soil
readings during its cathodic protection surveys conducted in 2012 and 2013 as shown in
Table 1. All readings shown in the table fail to meet the criteria for cathodic protection
contained in the federal pipeline safety regulations. Yet, at the time of the PHMSA
inspection, Starrett had not taken any remedial actions to correct these deficiencies.
City Building Address Unit Date & Reading
Hollywood 2335 McClellan Street Collins 9/12/12 -337 mV
12/10/13 -333 mV
Hollywood 2327 McClellan Street Collins 9/12/12 -339 mV
12/10/13 -336 mV
Hollywood 2319 McClellan Street Collins 9/12/12 -227 mV
12/10/13 -296 mV
Hollywood 2310 McClellan Street Barton 9/11/12 -369 mV
12/9-10/13 -320 mV
Hollywood 2318 McClellan Street Barton 9/11/12 -383 mV
12/9-10/13 -300 mV
Hollywood 2334 McClellan Street Barton 9/11/12 -377 mV
12/9-10/13 -344 mV
Hollywood 2335 Charleston Street Barton 9/11/12 -627 mV
12/9-10/13 -733 mV
Ft. Lauderdale 1444 NW 3rd Street Alden
Hotel
9/6/12 -353 mV
12/3/13 -271 mV
Ft. Lauderdale 1440 NW 3rd Street Alden
Hotel
9/6/12 -671 mV
12/3/13 -635 mV
Ft. Lauderdale 1521 NW 3rd Street Alden
Manor
9/5/12 -627 mV
12/2-3/13 -318 mV
Ft. Lauderdale 1510 NW 3rd Street Alden
Manor
9/5/12 -763 mV
12/2-3/13 -322 mV
Ft. Lauderdale 1370 NW 3rd Street Alden
Manor
9/5/12 -459 mV
12/2-3/13 -411 mV
Ft. Lauderdale 2204 NW 9th Street Lenox
Hotel
9/6/12 -699 mV
11/27/13 -453 mV
2 The criteria for cathodic protection are contained in 49 CFR Part 192, Appendix D. The criteria being
referenced in this letter is negative (cathodic) voltage of at least 850mV with reference to a saturated copper-
copper sulfate half-cell. Accordingly, a “low” p/s reading is a reading less negative than 850mV.
3 IBID
2



3. §192.605 Procedural manual for operations, maintenance and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least one each
calendar year. This manual must be prepared before operations of a pipeline system
commence. Appropriate parts of the manual must be kept at locations where
operations and maintenance activities are conducted.
Starrett did not review and update its manual of written procedures for conducting
operations and maintenance activities and for emergency response at intervals not
exceeding 15 months, but at least one each calendar year. The written procedures manual
presented to the PHMSA inspectors at the operator’s field office was dated 1997 and had
not been updated for many years. Moreover, it did not contain operations, maintenance,
and emergency response procedures specific to Starrett’s LPG system.
4. §192.614 Damage Prevention Program.
(a) Except as provided in paragraphs (d) and (e) of this section, each operator of a
buried pipeline must carry out, in accordance with this section, a written program to
prevent damage to that pipeline from excavation activities. For the purposes of this
section, the term “excavation activities” includes excavation, blasting, boring,
tunneling, backfilling, the removal of aboveground structures by either explosive or
mechanical means, and other earthmoving operations.
Starrett did not present records to demonstrate that it had a written program to prevent
damage its LPG pipeline system from excavation activities.
5. §192.615 Emergency Procedures.
(a) Each operator shall establish written procedures to minimize the hazard
resulting from a gas pipeline emergency.
Starrett did not present records to demonstrate that it had emergency procedures for its
LPG pipeline system.
6. §192.625 Odorization of gas.
... (f) To assure the proper concentration of odorant in accordance with this section,
each operator must conduct periodic sampling of combustible gases using an
instrument capable of determining the percentage of gas in air at which the odor
becomes readily detectable. Operators of master meter systems may comply with
this requirement by-
(1) Receiving written verification from their gas source that the gas has the proper
concentration of odorant; and
(2) Conducting periodic "sniff" tests at the extremities of the system to confirm that
the gas contains odorant.
3



Starrett did not assure the proper concentration of odorant by conducting periodic
sampling of combustible gases using an instrument4 capable of determining the
percentage of gas in air at which the odor becomes readily detectable.
7. §192.721 Distribution systems: Patrolling.
… (b) Mains in places or on structures where anticipated physical movement or
external loading could cause failure or leakage must be patrolled -
… (2) Outside business districts, at intervals not exceeding 7 1/2 months, but at least
twice each calendar year.
Starrett did not present records to show it had patrolled its distribution system outside
business districts at intervals not exceeding 7½ months, but at least twice each calendar
year.
8. §192.809 General
(a) Operators must have a written qualification program by April 27, 2001. The
program must be available for review by the Administrator or by a state agency
participating under 49 U.S.C. Chapter 601 if the program is under the authority of
that state agency.
Starrett did not present records to show it had a written qualification program.
9. §192.1015 What must a master meter or small liquefied petroleum gas (LPG)
operator do to implement this subpart?
(a) General. No later than August 2, 2011 the operator of a master meter system or
a small LPG operator must develop and implement an IM program that includes a
written IM plan as specified in paragraph (b) of this section. The IM program for
these pipelines should reflect the relative simplicity of these types of pipelines.
Starrett did not present records to show it had a written IM Program.
Under 49 United States Code, § 60122, Starrett Building Company is subject to a civil
penalty not to exceed $ 200,000 per violation per day the violation persists up to a maximum
of $2,000,000 for a related series of violations. For violations occurring prior to
January 4, 2012, the maximum penalty may not exceed $100,000 per violation per day, with a
maximum penalty not to exceed $1,000,000 for a related series of violations. We have
reviewed the circumstances and supporting documents involved in this case and have decided
not to conduct additional enforcement action or penalty assessment proceedings at this time.
We advise you to correct the items identified in this letter. Failure to do so will result in the
Starrett Building Company being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 2-2014-0014W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
4 Since Starrett was not operating a master meter system, the only acceptable method of complying was to use an
instrument capable of determining the percentage of gas in air at which the odor becomes readily detectable.4



along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
CC: Georges Drainville
Operations Manager
318 NW 17th Avenue
Fort Lauderdale, FL 33311
5
- **truncated:** false