# TENNESSEE GAS PIPELINE COMPANY — Warning Letter

- **operation:** document
- **citation:** CPF 220171006W
- **title:** TENNESSEE GAS PIPELINE COMPANY — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-10-05
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.605(a), 192.709(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220171006w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220171006w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220171006w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220171006W
**body:**

Warning Letter involving TENNESSEE GAS PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.605(a),  192.709(c). The case was opened on 2017-10-05 and is reported as closed as of 2017-10-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220171006W_Warning Letter_10052017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220171006W/220171006W_Warning%20Letter_10052017.pdf

220171006W_Warning Letter_10052017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220171006W/220171006W_Warning%20Letter_10052017_text.pdf

220171006W_Warning Letter_10052017_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 5, 2017
Mr. Kenneth W. Grubb
Chief Operating Officer
Kinder Morgan Natural Gas Pipelines
Tennessee Gas Pipeline Company
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
CPF 2-2017-1006W
Dear Mr. Grubb:
From June 19 to June 23, 2017, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety, inspected Tennessee Gas Pipeline
Company (TGP) facilities in Mississippi, pursuant to Chapter 601 of 49 United States Code
(U.S.C.).
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least once each
calendar year. This manual must be prepared before operations of a pipeline system
commence. Appropriate parts of the manual must be kept at locations where
operations and maintenance activities are conducted.



TGP failed to meet the regulation because it did not follow its procedure to document
inspection and partial operation of each transmission line valve that might be required
during any emergency, as required by §192.745(a).
TGP Procedure O&M 301, titled “Inspecting and Servicing Emergency Valves,” dated
April 1, 2016, prescribes actions required to ensure compliance with §192.745(a). This
procedure requires completion of TGP Form OM300-03, titled “Valve Inspection Service
Report,” revision date April 1, 2016, to demonstrate conformance with the procedure.
Form OM300-03 includes a field (field named “Operation”) to document either a
“partial” or “full” valve operation. This “Operation” field was left blank on records
documenting valve inspections in 2015 and 2016 for Valves 54-2ABD1 D/S BO and
54-2ABD U/S BO at TGP’s Station 54. Furthermore, 2016 inspections for the above-
referenced valves were not documented using TGP Form OM300-03, as required by
TGP’s procedure – the inspections were documented using an outdated form with a
different format and content fields. The inspections were conducted in October 2016,
after the revision dates of both the referenced TGP procedure and Form OM300-03.
TGP personnel produced work orders indicating that the inspection had been completed,
but the operation of these valves was not documented in any of the work orders made
available for review. TGP personnel stated that both valves were partially operated each
year as a part of the valve inspection, but did not produce any supporting evidence.
2. §192.709 Transmission lines: Recordkeeping.
Each operator shall maintain the following records for transmission lines for the
periods specified:
…(c) A record of each patrol, survey, inspection, and test required by subparts L
and M of this part must be retained for at least 5 years or until the next patrol,
survey, inspection, or test is completed, whichever is longer.
TGP documented annual valve inspections for valves that do not exist. During records
review, the PHMSA Inspector noted documentation of the the following valve
inspections for valves on its Line 100-1 at Station 54 in Greenville, MS:
• Valve 54-1A – Inspection Documented in 2013, 2015, and 2016
• Valve 54-1AL – Inspected Documented in 2013 and 2016
These valves do not appear on station schematics and were not observed during the field
inspection of Station 54. Section 11, Step A of TGP’s Greenville Procedure, titled
“Annual Valve Inspection and Maintenance,” requires Operator personnel to “Verify the
District valve identification numbers and re-tag if necessary.” This procedure was last
revised on August 2, 2016, approximately 3 months prior to the 2016 valve inspection.
2



Additionally, TGP did not consistently document the pipeline’s odorization status on the
leakage survey report. Records reviewed during the inspection indicated that Line 100-1
Patrol Segment 53-1+11.36 to 53-1+11.45 was odorized in 2014, as documented on TGP
Form OM200-10. Records documenting the 2015 leakage survey for the same patrol
segment did not indicate whether the line was odorized or unodorized. TGP stated that
the line was not odorized during this period. It should be noted that this line is not
required to be odorized per §192.625.
As of April 27, 2017, under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil
penalty not to exceed $209,002 per violation per day the violation persists up to a maximum of
$2,090,022 for a related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
items identified in this letter. Failure to do so will result in TGP being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 2-2017-1006W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region
3
- **truncated:** false
- **body characters:** 6715