# DESTIN PIPELINE COMPANY, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 220191003
- **title:** DESTIN PIPELINE COMPANY, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-12-18
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 191.22(c)(2)(i), 192.491(c), 192.616(a), 192.616(b), 192.805(b), 192.805(c), 192.805(g), 192.905(a), 192.947(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220191003.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220191003.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220191003
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220191003
**body:**

Notice of Probable Violation involving DESTIN PIPELINE COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 191.22(c)(2)(i),  192.491(c),  192.616(a),  192.616(b),  192.805(b),  192.805(c),  192.805(g),  192.905(a),  192.947(d). The case was opened on 2019-12-18 and is reported as closed as of 2022-03-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220191003_Closure Letter_03092022_(17-157329S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_Closure%20Letter_03092022_(17-157329S).pdf

220191003_Closure Letter_03092022_(17-157329S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_Closure%20Letter_03092022_(17-157329S)_text.pdf

220191003_Final Order_04102020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_Final%20Order_04102020.pdf

220191003_Final Order_04102020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_Final%20Order_04102020_text.pdf

220191003_NOPV PCO (Revised)_02052020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_NOPV%20PCO%20(Revised)_02052020.pdf

220191003_NOPV PCO (Revised)_02052020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_NOPV%20PCO%20(Revised)_02052020_text.pdf

220191003_NOPV PCO_12182019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_NOPV%20PCO_12182019.pdf

220191003_NOPV PCO_12182019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_NOPV%20PCO_12182019_text.pdf

220191003_Operator Response to Notice_03052020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220191003/220191003_Operator%20Response%20to%20Notice_03052020.pdf

220191003_NOPV PCO (Revised)_02052020_text.pdf

NOTICE OF PROBABLE VIOLATION
and
PROPOSED COMPLIANCE ORDER
FEDERAL EXPRESS – SIGNATURE CONFIRMATION REQUESTED
February 5, 2020
Mr. Matt Rowland
President and Chief Executive Officer
Third Coast Midstream, LLC
1501 McKinney St.
Suite 800
Houston, TX 77010
CPF 2-2019-1003
Dear Mr. Rowland:
Between February 26, 2018 and May 3, 2018, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.) inspected Destin Pipeline Company, LLC’s (Destin)
records and procedures in Houston, Texas, and Destin’s records and pipeline facilities in
Mississippi. Third Coast Midstream, LLC (TCM) is the parent company and majority owner of
American Midstream, LLC (AMID) and Destin.
As a result of the inspection, it is alleged that Destin has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. §191.22 National Registry of Pipeline and LNG Operators.
(a) …
(c) Changes. Each operator of a gas pipeline, gas pipeline facility, underground natural
gas storage facility, LNG plant, or LNG facility must notify PHMSA electronically



through the National Registry of Pipeline, Underground Natural Gas Storage Facility,
and LNG Operators at http://opsweb.phmsa.dot.gov of certain events.
(1) …
(2) An operator must notify PHMSA of any of the following events not later than 60
days after the event occurs:
(i) A change in the primary entity responsible (i.e., with an assigned OPID) for
managing or administering a safety program required by this part covering pipeline
facilities operated under multiple OPIDs.
Destin failed to notify PHMSA not later than 60 days after a change in the primary entity
responsible for managing or administering a safety program required by this part covering
pipeline facilities operated under multiple OPIDs.
AMID became the primary entity responsible for managing or administering the safety
programs for Destin Pipeline as of November 1, 2016, as reported on the divestiture
notification information submitted by the previous operator of Destin, BP Pipelines (North
America) Inc. (BP). Destin was required to notify PHMSA by December 31, 2016, 60 days
after the effective date of the change in the primary responsible entity.
Destin submitted the Type C – Shared Safety Program Change notification on April 30,
2018, exceeding the required notification date of December 31, 2016 by four hundred eighty-
five (485) days.
2. §192.491 Corrosion control records.
(a) …
(c) Each operator shall maintain a record of each test, survey, or inspection required by
this subpart in sufficient detail to demonstrate the adequacy of corrosion control
measures or that a corrosive condition does not exist. These records must be retained
for at least 5 years, except that records related to §§192.465(a) and (e) and 192.475(b)
must be retained for as long as the pipeline remains in service.
Destin failed to maintain records of each test, survey, or inspection required by Part 192,
subpart I, in sufficient detail to demonstrate the adequacy of corrosion control measures or
that a corrosive condition does not exist.
During the inspection, the PHMSA inspector reviewed records documenting Destin’s annual
cathodic protection (CP) surveys. Review of records documenting the 2016 annual CP
survey revealed remarks of "Cannot find” at 15 pipe-to-soil (p/s) potential test stations.
Further review of records documenting the subsequent 2017 annual CP survey include p/s
potential readings at each of the referenced 15 test points, and do not include a remark of
“Cannot find,” indicating the existence of these 15 stations.
3. §192.616 Public awareness.
(a) Except for an operator of a master meter or petroleum gas system covered under
paragraph (j) of this section, each pipeline operator must develop and implement a
written continuing public education program that follows the guidance provided in the
American Petroleum Institute’s (API) Recommended Practice (RP) 1162 (incorporated
by reference, see § 192.7).
2



(b) The operator's program must follow the general program recommendations of API
RP 1162 and assess the unique attributes and characteristics of the operator's pipeline
and facilities.
Destin failed to assess the unique attributes and characteristics of its pipeline and facilities in
its Public Awareness (PA) Program baseline message brochures. Destin transports natural
gas and it uses the AMID PA Program.
In 2015 and in 2016, AMID on behalf of Destin sent (or otherwise delivered) generic
baseline message brochures to the affected public, excavators, emergency responders, and
public officials that did not identify the product transported by Destin as natural gas, and did
not describe the unique attributes and characteristics of natural gas or a pipeline transporting
natural gas.
4. §192.805 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) …
(g) Identify those covered tasks and the intervals at which evaluation of the individual’s
qualifications is needed; and
Destin failed to follow the provisions of its written qualification program to determine the
intervals at which evaluation of certain covered tasks was needed. Destin uses the AMID
Operator Qualification (OQ) Program as its written qualification program.
Section 2.4 of the AMID OQ Plan contains requirements to establish re-evaluation intervals
using a DIF analysis, based on each task’s difficulty, importance, and frequency of
performance. The AMID OQ Plan requires a rating of 1-5 be assigned to difficulty,
importance, and frequency for each covered task. These values are then used to determine a
re-evaluation interval based on a decision tree included in the above-referenced Section
(Figure 2.4.2-1). The values of difficulty, importance, frequency and the established re-
evaluation intervals are listed in Appendix 2.1 of the AMID OQ Plan, titled “Covered Task
List with Re-Evaluation Interval and Span of Control.”
PHMSA’s inspection revealed multiple examples of re-evaluation intervals that were not
established in accordance with the DIF analysis procedure described in Section 2.4 of the
AMID OQ Plan.
5. §192.805 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) …
(b) Ensure through evaluation that individuals performing covered tasks are qualified;
Destin failed to comply with § 192.805(b) because the company’s written qualification
program did not include adequate provisions to ensure through evaluation that individuals
performing covered tasks are qualified. As noted above, Destin uses the AMID OQ Program
as its written qualification program.
3



At the time of PHMSA’s inspection, the AMID OQ Program relied on evaluation material
from three OQ service providers. PHMSA’s review of the AMID OQ Program identified
several instances where the evaluation material from each of the three service providers was
inadequate to evaluate an individual’s knowledge, skill and ability to perform a given
covered task. Specifically, accepted evaluations for multiple covered tasks were identified
that referenced material not applicable to the given covered task, or contained an insufficient
number of questions pertinent to the covered task. Moreover, PHMSA’s review revealed
several instances of accepted performance evaluations which were irrelevant to the task for
which they were intended to demonstrate an individual’s ability to perform the covered
task(s).
6. § 192.805 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) …
(c) Allow individuals that are not qualified pursuant to this subpart to perform a
covered task if directed and observed by an individual that is qualified;
Destin failed to comply with § 192.805(c) because the company’s OQ program did not
include adequate provisions to allow individuals that are not qualified to perform an OQ
covered task under the direction and observation of a qualified individual. As noted above,
Destin uses the AMID OQ Program as its written qualification program.
At the time of the inspection, the PHMSA inspector noted several covered tasks in the AMID
OQ Program with spans-of-control for multiple non-qualified individuals to be observed by a
single qualified individual not suited to the specific task. It should be noted that during an
August 2014 PHMSA inspection of the AMID OQ Plan, the issue of excessive
span-of-control values was raised by the PHMSA inspector. At that time, the AMID OQ
Plan Administrator agreed to change all spans-of-control to 1:1, except for maintenance
welding which was changed to 1:0. A revised AMID OQ Program was submitted at the end
of the 2014 inspection to demonstrate the changes.
§192.905 How does an operator identify a high consequence area?
(a) General. To determine which segments of an operator's transmission pipeline
system are covered by this subpart, an operator must identify the high consequence
areas. An operator must use method (1) or (2) from the definition in §192.9031 to
identify a high consequence area. An operator may apply one method to its entire
pipeline system, or an operator may apply one method to individual portions of the
pipeline system. An operator must describe in its integrity management program which
method it is applying to each portion of the operator's pipeline system. The description
must include the potential impact radius when utilized to establish a high consequence
area. (See appendix E.I. for guidance on identifying high consequence areas.)
1 Excerpt of the definition of High consequence area in §192.903: [w]here a potential impact circle is calculated
under either method (1) or (2) to establish a high consequence area, the length of the high consequence area
extends axially along the length of the pipeline from the outermost edge of the first potential impact circle that
contains either an identified site or 20 or more buildings intended for human occupancy to the outermost edge of the
last contiguous potential impact circle that contains either an identified site or 20 or more buildings intended for
human occupancy. (See Figure E.I.A. in Appendix E.)
4
7.



8. Destin failed to include information required per the definition of a High Consequence Area
(HCA), as defined in §192.903.
Destin used method 2 to establish the HCAs along its pipeline. Under 49 C.F.R. §192.903,
method 2 is defined as:
(2) The area within a potential impact circle containing—
(i) 20 or more buildings intended for human occupancy, unless the exception in
paragraph (4) applies; or
(ii) An identified site.
Destin did not include the length of HCAs which extends axially along the length of the
pipeline from the outermost edge of the first potential impact circle that contains either an
identified site or 20 or more buildings intended for human occupancy to the outermost edge
of the last contiguous potential impact circle that contains either an identified site or 20 or
more buildings intended for human occupancy, as required per §192.903.
In response to the probable violations discovered during the PHMSA inspection, on
April 4, 2018, Destin submitted to PHMSA a revised supplemental 2017 Annual Report and
revised 2017 Pipeline System Summary HCAs which reflected corrected HCA mileages after
properly applying the above-referenced requirements of §192.903.
§192.947 What records must an operator keep?
An operator must maintain, for the useful life of the pipeline, records that demonstrate
compliance with the requirements of this subpart. At minimum, an operator must
maintain the following records for review during an inspection.
… (d) Documents to support any decision, analysis and process developed and used to
implement and evaluate each element of the baseline assessment plan and integrity
management program. Documents include those developed and used in support of any
identification, calculation, amendment, modification, justification, deviation and
determination made, and any action taken to implement and evaluate any of the
program elements;
Destin failed to comply with the regulation because it did not maintain, for the useful life of
the pipeline, records to support their decisions, analysis and processes developed and used to
implement and evaluate each element of the integrity management program. Specifically,
Destin personnel were not able to produce the following records to support BP’s and AMID’s
decisions, analyses, and processes used to implement and evaluate each element of the
integrity management program:
 In-line inspection (ILI) tool validation records for reassessments conducted in October
2013 and November 2014 (36" Sandhill Compressor Station to Pascagoula Gas Plant
Line and 16" Pascagoula Gas Plant to Chevron Refinery Line, respectively). Section
192.947(c)(1) requires operators to follow Section 6.2 of ASME/ANSI B31.8S when
selecting the appropriate ILI tool. Section 6.2.5 of ASME/ANSI B31.8S requires
operators to assess the general reliability of the ILI method by considering the confidence
level of the ILI method (e.g., probability of detecting, classifying, and sizing the
anomalies). During PHMSA’s inspection, Destin personnel were unable to produce
5



records of such validations of the above-referenced October 2013 and November 2014
reassessments.
 Records documenting Destin’s decision to reduce HCA mileage. During PHMSA’s
records review, it was noted that Destin reported 10.5 miles of HCAs in its 2016 Annual
Report versus 1.89 miles in its 2017 Original Annual Report and 2.28 in its 2017
Supplemental Annual Report. This decision followed a review of HCAs after transfer of
ownership of the pipeline from BP to AMID in 2016. The PHMSA inspectors noted this
change in HCA mileage during their records review during the week of April 30, 2018.
AMID’s Management of Change Report, Form 11.1, documenting the decision and
reason for the HCA mileage change, was not submitted to PHMSA until May 1, 2018.
Proposed Compliance Order
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a
related series of violations. For violation occurring on or after November 27, 2018 and before
July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day, with a
maximum penalty not to exceed $2,132,679. For violation occurring on or after November 2,
2015 and before November 27, 2018, the maximum penalty may not exceed $209,002 per
violation per day, with a maximum penalty not to exceed $2,090,022. For violations occurring
prior to November 2, 2015, the maximum penalty may not exceed $200,000 per violation per
day, with a maximum penalty not to exceed $2,000,000 for a related series of violations.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to propose a civil penalty assessment at this time.
With respect to Items 5 and 6, pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous
Materials Safety Administration proposes to issue a Compliance Order to Destin Pipeline
Company, LLC. Please refer to the Proposed Compliance Order, which is enclosed and made a
part of this Notice.
Warning Items
With respect to Items 1, 2, 3, 4, 7, and 8, we have reviewed the circumstances and supporting
documents involved in this case and have decided not to conduct additional enforcement action
or penalty assessment proceedings at this time. We advise you to promptly correct these items.
Failure to do so may result in additional enforcement action.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators
in Compliance Proceedings. Please refer to this document and note the response options. All
material submit in response to this enforcement action may be made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
6



Following the receipt of this Notice, you have 30 days to submit written comments, or request a
hearing under 49 CFR § 190.211. If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order. If you are responding to this Notice, we propose that
you submit your correspondence to my office within 30 days from the receipt of this Notice.
This period may be extended by written request for good cause.
In your correspondence on this matter, please refer to CPF 2-2019-1003 and, for each document
you submit, please provide a copy in electronic format whenever possible.
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
7



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Destin Pipeline Company, LLC (Destin Pipeline)
a Compliance Order incorporating the following remedial requirements to ensure the compliance
of Destin Pipeline with the pipeline safety regulations:
1. 2. 3. 4. In regard to Item Number 5 of the Notice pertaining to evaluation of individuals performing
covered tasks, Destin Pipeline must:
a. Review all written, electronic and oral examinations to assure they contain a sufficient
number of questions with sufficient detail and complexity to establish an individual’s
knowledge of the given covered task.
b. Review all performance verification materials to assure they provide for actual
performance of the covered task.
c. Replace, modify or supplement all evaluation material to assure the material will
adequately establish an individual’s knowledge, skill and ability to perform a covered
task properly.
In regard to Item Number 6 of the Notice pertaining to Destin Pipeline’s failure to include
adequate provisions to allow individuals that are not qualified to perform an OQ covered task
under the direction and observation of a qualified individual, Destin Pipeline must review
and update the span of control limits for all covered tasks included in its OQ Program to
ensure each’s appropriateness and effectiveness.
Destin Pipeline must complete the above items within the following time requirements:
a. Within 90 days of issuance of the Final Order, Destin Pipeline must complete the
requirements of Numbers 1a, 1b, and 1c of proposed compliance order above. Destin
pipeline must submit to the Director, Office of Pipeline Safety, PHMSA Southern
Region, a list of all covered tasks with evaluation material that was replaced, modified, or
supplemented.
b. Within 90 days of issuance of the Final Order, Destin Pipeline must complete the
requirements of Number 2 of proposed compliance order above. Destin pipeline must
submit to the Director, Office of Pipeline Safety, PHMSA Southern Region, a list of
covered tasks reviewed and span-of-control limits that were changed.
It is requested (not mandated) that Destin Pipeline maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total to
the Director, Office of Pipeline Safety, PHMSA Southern Region. It is requested that these
costs be reported in two categories: 1) total cost associated with preparation/revision of plans,
procedures, studies and analyses, and 2) total cost associated with replacements, additions
and other changes to pipeline infrastructure.
8

220191003_Final Order_04102020_text.pdf

VIA EMAIL TO: mrowland@3cmidstream.com and rlouderman@3cmidstream.com
Mr. Matt Rowland
President and Chief Executive Officer
Third Coast Midstream, LLC
1501 McKinney Street, Suite 800
Houston, Texas 77010
Re: CPF No. 2-2019-1003
Dear Rowland:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary,
Destin Pipeline Company, LLC. It makes findings of violation and specifies actions that need to
be taken to comply with the pipeline safety regulations. When the terms of the compliance order
are completed, as determined by the Director, Southern Region, this enforcement action will be
closed. Service of the Final Order by e-mail is effective upon the date of mailing as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. James Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Ms. Ronda Louderman, Senior Manager, Pipeline Transportation Compliance, Third
Coast Midstream, LLC
VIA EMAIL – CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
Destin Pipeline Company, LLC, ) CPF No. 2-2019-1003
a subsidiary of Third Coast Midstream, LLC, )
)
)
)
Respondent. )
__________________________________________)
FINAL ORDER
On February 5, 2020, pursuant to 49 C.F.R. § 190.207, the Director, Southern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Destin Pipeline
Company, LLC (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 C.F.R. Parts 191 and 192. The Notice also proposed certain
measures to correct the violations. Respondent did not contest the allegations of violation or
corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.805(b) (Item 5) ─ Respondent failed to have and follow a written
qualification program that ensured through evaluation that individuals performing
covered tasks are qualified.
49 C.F.R. § 192.805(c) (Item 6) ─ Respondent failed to have and follow a written
qualification program that allowed individuals that are not qualified pursuant to
subpart N to perform a covered task if directed and observed by an individual that
is qualified.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ACTIONS
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an



CPF No. 2-2019-1003
Page 2
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.
WARNING ITEMS
With respect to Items 1, 2, 3, 4, 7, and 8, the Notice alleged probable violations of 49 C.F.R. §§
191.22(c)(2)(i), 192.491(c), 192.616(a) & (b), 192.805(g), 192.905(a), and 192.947(d),
respectively, but did not propose a civil penalty or compliance order for these items. Therefore,
these are considered to be warning items. If OPS finds a violation of any of these items in a
subsequent inspection, Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
April 10, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

220191003_Closure Letter_03092022_(17-157329S)_text.pdf

DELIVERY METHOD – VIA FEDERAL EXPRESS
March 9, 2022
Mr. Matt Rowland
President & Chief Executive Officer
Third Coast, LLC
1501 McKinney St., Suite 800
Houston, TX 77010
CPF 2-2019-1003
Dear Mr. Rowland:
Between February 26, 2018 and May 3, 2018, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) inspected Destin Pipeline Company, LLC’s (Destin)
records and procedures in Houston, Texas and Destin’s records and pipeline facilities in
Mississippi, pursuant to Chapter 601 of 49 United States Code. Third Coast, LLC (TC) is the
parent company and majority owner of American Midstream, LLC (AMID) and Destin. As a
result of the inspection PHMSA issued a Notice of Probable Violation and Proposed Compliance
Order on February 5, 2020 and a Final Order on April 8, 2020.
TC submitted its responses from May 5, 2020 through February 9, 2022. PHMSA has reviewed
TC’s responses and determined that TC has complied with the terms of the Final Order.
This letter is to inform you no further action is necessary, and this case is now closed.
Please be advised that this letter refers only to the referenced case (CPF 2-2019-1003) and not to
any other PHMSA cases, if any.
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region