# SOUTHERN LNG, INC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 220193001
- **title:** SOUTHERN LNG, INC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-12-11
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 191.25(a), 191.5(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-220193001.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-220193001.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-220193001
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/220193001
**body:**

Notice of Probable Violation involving SOUTHERN LNG, INC. PHMSA's enforcement data identifies the cited regulations as 191.25(a),  191.5(a). The case was opened on 2019-12-11 and is reported as closed as of 2020-06-29. Proposed civil penalty: $55,200. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220193001_NOPV PCP_12112019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_NOPV%20PCP_12112019.pdf

220193001_NOPV PCP_12112019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_NOPV%20PCP_12112019_text.pdf

220193001_Op Resp and Req for Sttlmnt Mtg and Req for Hrng and Req for Writ Resp and Stmnt of Issues- Title Pg_02212020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_Op%20Resp%20and%20Req%20for%20Sttlmnt%20Mtg%20and%20Req%20for%20Hrng%20and%20Req%20for%20Writ%20Resp%20and%20Stmnt%20of%20Issues-%20Title%20Pg_02212020.pdf

220193001_Op Resp to Notice and Req for Sttlmnt Mtg and Req for Hrng and Req for Writ Resp and Stmnt of Issues_02212020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_Op%20Resp%20to%20Notice%20and%20Req%20for%20Sttlmnt%20Mtg%20and%20Req%20for%20Hrng%20and%20Req%20for%20Writ%20Resp%20and%20Stmnt%20of%20Issues_02212020.pdf

220193001_PHC Hearing Scheduled (Amended)_06122020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_PHC%20Hearing%20Scheduled%20(Amended)_06122020.pdf

220193001_PHC Hearing Scheduled (Amended)_06122020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_PHC%20Hearing%20Scheduled%20(Amended)_06122020_text.pdf

220193001_PHC Hearing Scheduled_03112020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_PHC%20Hearing%20Scheduled_03112020.pdf

220193001_PHC Hearing Scheduled_03112020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_PHC%20Hearing%20Scheduled_03112020_text.pdf

220193001_Region Withdrawal of Notice Letter_06292020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_Region%20Withdrawal%20of%20Notice%20Letter_06292020.pdf

220193001_Region Withdrawal of Notice Letter_06292020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220193001/220193001_Region%20Withdrawal%20of%20Notice%20Letter_06292020_text.pdf

220193001_PHC Hearing Scheduled (Amended)_06122020_text.pdf

June 12, 2020
VIA ELECTRONIC MAIL TO: Catherine.Little@troutman.com and James.Urisko@dot.gov
Ms. Catherine Little
Counsel for Colonial Pipeline Company
Troutman Sanders, LLP
600 Peachtree Street NE, Suite 3000
Atlanta, Georgia 30308
Mr. James Urisko
Director, Southern Region, PHMSA
230 Peachtree Street NW, Suite 2100
Atlanta, Georgia 30303
Re: Notice of Hearing, Southern LNG Company, LLC
CPF No. 2-2019-3001
Dear Ms. Little and Mr. Urisko:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Civil Penalty issued by the Office of Pipeline Safety in the above-
referenced case. The hearing has been rescheduled to take place via videoconference on July 16, 2020,
beginning at 9:00 a.m. Eastern Time.
Both parties must submit and exchange any additional written materials they intend to present at least
10 calendar days prior to the hearing (July 6, 2020), along with a list of attendees, and the names of
any witnesses who may testify. You may provide this information electronically. If you have any
questions, please contact me at (202) 366-6139 or at kristin.baldwin@dot.gov.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kristin Baldwin
Presiding Official
cc (email): Ms. Melanie Stevens, Counsel, Office of Pipeline Safety, PHMSA
Ms. Ahuva Battams, Counsel, Office of Pipeline Safety, PHMSA

220193001_Region Withdrawal of Notice Letter_06292020_text.pdf

NOTICE OF WITHDRAWAL
VIA ELECTRONIC MAIL TO: Jessica_Toll@kindermorgan.com and
Catherine.Little@troutman.com
June 29, 2020
Ms. Kimberly Allen Dang
President
Kinder Morgan, Inc.
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
CPF 2-2019-3001
Dear Ms. Dang:
On December 11, 2019, the Pipeline and Hazardous Materials Safety Administration, Office of
Pipeline Safety (OPS), Southern Region issued a Notice of Probable Violation and Proposed
Civil Penalty (Notice) for the case number referenced above to your subsidiary, Southern LNG
Company (SLNG). The Notice cited SLNG for two alleged violations of 49 CFR Part 191
regarding failure to file an incident report and a safety-related condition report following an
incident that occurred at SLNG’s Elba Island liquefied natural gas facility in Savannah, Georgia
on May 15, 2018 (Incident). The Notice proposed a civil penalty of $55,200 for both items.
Upon further deliberation, OPS Southern Region has decided to withdraw the Notice until such
time that it has completed its investigation of the Incident. This letter, thereby, informs you that
PHMSA is withdrawing the Notice for CPF 2-2019-3001, without prejudice, and that the case is
now closed. PHMSA retains its authority to continue its investigation of the Incident, and reserves
its right to seek enforcement if necessary.
Sincerely,
James Urisko
Director, Southern Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Ms. Jessica Toll, Esq., Kinder Morgan, Inc., 370 Van Gordon St, Lakewood, CO 80228
(Jessica_Toll@kindermorgan.com)
Ms. Catherine D. Little, Esq., Troutman Sanders LLP, 600 Peachtree Street NE, Suite
5200, Atlanta, GA 30308 (Catherine.Little@troutman.com)

220193001_PHC Hearing Scheduled_03112020_text.pdf

March 11, 2020
VIA CERTIFIED MAIL AND EMAIL TO: Catherine.Little@troutman.com and
James.Urisko@dot.gov
Ms. Catherine Little
Counsel for Colonial Pipeline Company
Troutman Sanders, LLP
600 Peachtree Street NE, Suite 3000
Atlanta, Georgia 30308
Mr. James Urisko
Director, Southern Region, PHMSA
Pipeline and Hazardous Materials Safety Administration
230 Peachtree Street NW, Suite 2100
Atlanta, Georgia 30303
Re: Notice of Hearing, Southern LNG Company, LLC
CPF No. 2-2019-3001
Dear Ms. Little and Mr. Urisko:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Civil Penalty issued by the Office of Pipeline Safety in the above-
referenced case. The hearing has been scheduled to take place via videoconference on June 16, 2020,
beginning at 9:00 a.m. Eastern Time.
Both parties must submit and exchange any additional written materials they intend to present at least
10 calendar days prior to the hearing (June 6, 2020), along with a list of attendees, and the names of
any witnesses who may testify. You may provide this information electronically. If you have any
questions, please contact me at (202) 366-6139 or at kristin.baldwin@dot.gov.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kristin Baldwin
Presiding Official
cc (email): Ms. Melanie Stevens, Counsel, Office of Pipeline Safety
Ms. Ahuva Battams, Counsel, Office of Pipeline Safety

220193001_Op Resp to Notice and Req for Sttlmnt Mtg and Req for Hrng and Req for Writ Resp and Stmnt of Issues_02212020.pdf

Before the
U.S. Department of Transportation
Pipeline and Hazardous Materials Safety Administration
Office of Pipeline Safety
Washington, D.C.
____________________________________
In the Matter of )
) CPF No. 2-2019-3001
Southern LNG Company, L.L.C. ) Notice of Probable Violation
)
)
Respondent. )
____________________________________)
REQUEST FOR HEARING, WRITTEN RESPONSE,
AND STATEMENT OF ISSUES
I. Request for Hearing
Southern LNG Company, L.L.C. (Southern LNG or the Company) respectfully requests an in-
person hearing on the above referenced Notice of Probable Violation (NOPV) and Proposed
Civil Penalty issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA),
pursuant to 49 C.F.R. §§ 190.208(a)(4) and 190.211(b). The NOPV alleges two violations of 49
C.F.R. Part 191 regarding incident reporting and safety-related condition reporting at the
Company’s Elba Island liquefied natural gas (LNG) terminal (Terminal) and proposes a total
civil penalty of $55,200 for both items. The NOPV was received by Southern LNG on
December 20, 2019. PHMSA granted Southern LNG’s January 7, 2020 request for an extension
of time to respond to the NOPV on January 13, 2020, extending the response deadline to
February 24, 2020. As such, this request is timely pursuant to 49 C.F.R. § 190.208.
Prior to issuance of the NOPV, the Company had been in discussions with PHMSA with regard
to the extent of its jurisdiction at the Terminal. In order to continue those discussions with
PHMSA, Southern LNG respectfully requests an in person settlement meeting with the Southern
Region. While the Company fully believes that this matter can be resolved without resort to a
hearing, Southern LNG is filing this Request for Hearing, Written Response, and Statement of
Issues as set forth under 49 C.F.R. § 190.211(b) in order to preserve its rights. In the event that a
hearing is scheduled in this matter, please be advised that Southern LNG in-house counsel and/or
Troutman Sanders law firm will represent the Company at any hearing.
As set forth below, Southern LNG believes, consistent with applicable law and prior historical
practice, that the particular portion of the Terminal at issue is exclusively regulated by the U.S.
Coast Guard (USCG) and is expressly exempt from PHMSA jurisdiction. For that reason, the



Company respectfully requests that the entire NOPV and the Proposed Civil Penalty be
withdrawn.
Please note that with this submission, Southern LNG makes reference to the various aspects of
the facility as well as PHMSA’s Pipeline Safety Violation Report (PSVR) which include
controlled unclassified information (CUI), critical energy infrastructure information (CEII),
sensitive security information, and/or confidential business information that is protected from
disclosure under exemptions to the Freedom of Information Act (FOIA), 5 U.S.C. § 552, as well
as regulations issued by the Federal Energy Regulatory Commission (FERC) at 18 C.F.R. §
388.113 and PHMSA at 49 C.F.R. Part 7 and 49 C.F.R. § 190.343.
II. Background
A. Terminal Background
Southern LNG operates the Terminal located in Chatham County, Georgia. The Terminal was
originally installed in the 1970s to import LNG from marine cargo for domestic use. In the
1980s, the Terminal was decommissioned and in 2000 it was recommissioned and subsequently
expanded to receive marine cargos at two docks and vaporize imported natural gas to
interconnections and the interstate pipeline grid. In 2016, the Terminal was again expanded to
allow LNG to be liquefied and loaded for export at the existing marine cargo facility. The first
liquefaction train was placed in service in 2019.
Southern LNG has historically operated and maintained the Terminal subject to the jurisdiction
of various federal regulatory agencies, including the USCG, PHMSA, and FERC. Specifically,
Southern LNG operates its Terminal consistent with established jurisdictional boundaries based
on relevant federal statutes, federal regulations, and various memoranda of understanding
(MOU) clarifying potentially overlapping jurisdiction of federal agencies.
Clearly delineated jurisdictional boundaries are essential to operation of any LNG marine
terminal, including this Terminal. Based on PHMSA and USCG regulations and as informed by
MOUs between the agencies, Southern LNG has designated the beginning of PHMSA pipeline
safety jurisdiction at the Terminal as the last valve immediately before the receiving tanks. This
jurisdictional demarcation is also consistent with historical inspections of the Terminal by
PHMSA and the USCG. Figure 1 below depicts the jurisdictional demarcation as it relates to the
portion of the Terminal at issue in the NOPV allegations.
2



Figure 1, Delineation of PHMSA and USCG Jurisdiction
at Relevant Portion of LNG Terminal
B. Event at Issue and Subsequent Discussions with PHMSA
Southern LNG experienced an event on May 15, 2018, when the main fill valve (HV-21061) for
LNG Tank D-4 and an out of service lateral 32-inch piping on the tank side of the valve – areas
of the Terminal that are exclusively regulated by the USCG – were subjected to increased
pressure. Southern LNG letter to Mr. Urisko, PHMSA (Sep. 26, 2019). The section of the pipe
where the event occurred was out of service for tie-ins as part of the construction of the
liquefaction project at the facility (i.e., the pipe was isolated and LNG was evacuated from the
pipe). Id. at p. 2. Southern LNG verbally reported the event to FERC that day. Following
subsequent investigations into the cause of the event, the Company determined that combustion
occurred on the out of service line, causing a detonation at the closed Tank D-4 main fill valve
HV-21061. Id. The detonation within the pipe caused the pipe to expand, damaged the fill
valve, and stretched the flange bolts, allowing LNG to pass through and drip into the insulation.
Id.
Updates regarding Southern LNG’s investigation of the event were provided verbally and in
writing to FERC pursuant to FERC’s June 1, 2016 Order Granting Section 3 and Section 7
Authorizations to Southern LNG. PHMSA received notice of the event during an October 3,
2018, phone call with Terminal personnel and Southern LNG provided PHMSA with a copy of
the incident report following that call and separately provided facility diagrams on October 4,
2018. Southern LNG and PHMSA further discussed jurisdictional delineations at the Terminal
by telephone on October 17, 2018 and Southern LNG provided additional information, including
relevant piping and instrumentation diagrams and a third party inspection report.
During a subsequent in-person meeting at the Terminal on October 30, 2018, PHMSA and
Southern LNG engaged in additional discussion regarding jurisdiction as it relates to the event.
At that meeting, PHMSA indicated that it would meet with the USCG to discuss the issue further
and would follow-up with Southern LNG after those meetings. In November 2018, Southern
3



LNG provided PHMSA with additional valve information and a copy of the Company’s final
investigation report. The parties engaged in additional brief discussions regarding the event and
PHMSA jurisdiction during a June 2019 PHMSA inspection of the Elba Island liquefaction
project.
In response to an August 2019 request from PHMSA to file a safety related condition (SRC)
report, Southern LNG submitted a letter to PHMSA on September 26, 2019, to file a SRC report
while expressly stating that the Company did not consider the event to qualify for reporting
under Part 191. Southern LNG letter to Mr. Urisko, PHMSA (Sep. 26, 2019). For the reasons
stated in the letter, Southern LNG specifically requested a waiver of the five day reporting
requirement in the event that PHMSA did not agree with Southern LNG’s position. Id.
Subsequently, Southern LNG responded to an October 2019 email from PHMSA requesting
information regarding the cost of the repair. Id. The Company expected to continue to work
with both PHMSA and the USCG to clarify the jurisdictional boundaries at the Terminal and, if
necessary, file a formal request for jurisdictional determination. After fully cooperating with
PHMSA and providing the information requested by the Agency, the only follow-up Southern
LNG received from PHMSA since October 2019, however, is the NOPV at issue.
III. Southern LNG’s Response to PHMSA NOPV Allegations
As explained above, Southern LNG believes that the event in question occurred in an area of the
Terminal that is exclusively regulated by the USCG, consistent with federal regulations and
exemptions, historical agreements between PHMSA and the USCG, and prior regulatory
inspections of the Terminal. For that reason, the PHMSA incident and SRC reporting
regulations do not apply to this portion of the LNG facility. Further, there is no prior regulatory
enforcement or guidance that indicates otherwise. To the extent that PHMSA intends to expand
its jurisdiction beyond what is established in its regulations, the Agency must comply with fair
notice and due process requirements under the Administrative Procedure Act and the U.S.
Constitution.
Southern LNG does not believe that PHMSA has jurisdiction over the valve and piping at issue
in the NOPV allegations, but even if PHMSA did have jurisdiction, the Company believes that
the event could not have been both a reportable incident and a reportable safety-related condition
under Part 191.
A. NOPV Item 1 Should be Withdrawn
1. PHMSA Allegation
§ 191.5 Immediate notice of certain incidents.
(a) At the earliest practicable moment following discovery, but no later than one hour after
confirmed discovery, each operator must give notice in accordance with paragraph (b) of
this section of each incident as defined in § 191.3
KM failed to notify PHMSA at the earliest practicable moment following discovery, but no later
than one hour after confirmed discovery, of a reportable incident, in violation of 49 C.F.R. §
4



191.5. As of the date of this letter, KM has not notified PHMSA of the incident described above,
which was discovered on August 2, 2018.
Reportable incident is defined in 49 C.F.R. § 191.3 to include the following:
(1) An event that involved a release of . . . liquefied natural gas, liquefied
petroleum gas, refrigerant gas, or gas from an LNG facility, and that results in one or
more of the following consequences:
(ii) Estimated property damage of $50,000 or more, including loss to the operator and
others, or both, but excluding cost of gas lost;
(3) An event that is significant in the judgement of the operator, even though it did not
meet the criteria of paragraph (1) or (2) of this definition.
KM is required to notify PHMSA of an incident involving a release of LNG or natural gas from
an LNG facility and causing more than $50,000 in property damage. Note that KM followed the
recommendations of the "Kinder Morgan, Savannah, GA, Inspection 32-inch Line to Tank D4"
report prepared by TEAM Industrial Services, Inc. dated August 27, 2018 (TEAM Report), and
removed and replaced the damaged components. The estimated cost associated with the defects
and physical damages to the listed components above was reported by KM as $497,880, which
exceeds $50,000.
KM is also required to report an event that is significant in the judgement of the operator. KM
determined the event significant when it reported the event to FERC in its January to April 2018
and June 2018 Semi-Annual Operating report.
2. Southern LNG Response to NOPV Item 1
The portion of the Terminal at issue in the May 15, 2018 event meets the plain language of
PHMSA’s “marine cargo transfer system” exemption. That exemption provides that transfer
piping from a vessel loading dock to a receiving tank is exempt in relevant part under PHMSA
Part 193 and Part 191 regulations. As confirmed in applicable federal regulations, MOUs, and
PHMSA guidance, PHMSA jurisdiction begins at the last manifold or, in the absence of a
manifold, the last valve immediately before the receiving tanks. Because there is no manifold
immediately before the receiving tanks, PHMSA jurisdiction begins at the last valve (i.e., HV-
21066 and HV-21064, which are respectively the top fill and bottom fill valves) immediately
before and including tank D-4 and equipment and piping leading to and including the LNG
facility (as reflected in Figure 1).1 In turn, the USCG solely regulates transfer piping from that
valve to the vessel loading docks, including the valve and piping involved in the May 15, 2018
event (HV-21061).2 This jurisdictional demarcation is consistent with historical inspections of
the Terminal by PHMSA and the USCG.
1 This interpretation is consistent with PHMSA’s own guidance, which states that “other than the siting requirements
in Subpart B of 49 CFR Part 193,” marine cargo transfer system “facilities between the vessel and the last valve on
the storage tank are not regulated under 49 CFR Part 193.” FAQ 49 CFR Part 193, available at
https://search.usa.gov/search?query=Marine+Cargo+Transfer+System&op=GO&affiliate=dot-phmsa-2.
2 A marine transfer area for LNG, as regulated by the USCG under the Ports and Waterways Safety Act, 46 U.S.C. §
5



The federal Pipeline Safety Act defines an LNG facility as a gas pipeline facility used in
transporting or storing LNG or for LNG conversion, in interstate or foreign commerce, which
expressly “does not include” any part of a structure or equipment located in navigable waters (as
defined in the Federal Power Act). 49 U.S.C. § 60101(14). Along those lines, “marine cargo
transfer systems” and associated piping are expressly exempt in relevant part from PHMSA
regulation under 49 C.F.R. Part 193, as “marine cargo transfer systems and associated facilities. .
. between the marine vessel and the last manifold (or in the absence of a manifold, the last
valve), located immediately before a storage tank.” 49 C.F.R. § 193.2001(b)(3).
PHMSA defines “cargo transfer systems” to include “a component, or system of components
functioning as a unit, used exclusively for transferring hazardous fluids in bulk between a tank
car, tank truck, or marine vessel and a storage tank.” 49 C.F.R. § 193.2007.3 Further, PHMSA
defines a “waterfront LNG plant” as “an LNG plant with docks, wharves, piers, or other
structures in, on, or immediately adjacent to the navigable waters of the United States or Puerto
Rico and any shore area immediately adjacent to those waters to which vessels may be secured
and at which LNG cargo operations may be conducted.” Id. While PHMSA does not define
“manifold” in its Part 193 regulations, associated guidance or relevant enforcement precedent,
common dictionaries, technical dictionaries, and industry standards define “manifold,” which
derives its meaning from the word “many,” to generally mean a chamber or pipe with many or
several outlets or branches.4
In 1986, the USCG and a predecessor agency to PHMSA executed a MOU “to avoid duplication
of regulatory efforts regarding waterfront LNG facilities and to maximize the exchange of
relevant information.” MOU Between the USCG and the Research and Special Programs
Administration for Regulation of Waterfront Liquified Natural Gas Facilities (May 1986).
5 The
70034 et seq., includes “that part of a waterfront facility handling LNG between the vessel, or where the vessel
moors, and the last manifold or valve immediately before the receiving tank.” 33 C.F.R. § 127.005 (emphasis
added).
3 Although the term “marine cargo transfer system” is not defined in Part 193 regulations, PHMSA uses the
definition of a “cargo transfer system.” PHMSA Interpretation, Letter from J. Wiese to J. Wright (July 31, 2009)
(stating that “a marine cargo transfer system is defined in Subpart A as ‘a component, or system of components
functioning as a unit, used exclusively for transferring hazardous fluids in bulk between a . . . marine vessel and a
storage tank’”).
4 See e.g., Merriam Webster https://www merriam-webster.com/dictionary/manifold (defining “manifold” in this
context as “a pipe fitting with several lateral outlets for connecting one pipe with others.”); Oxford English
Dictionary (2d ed. 1989) (defining “manifold” in the context of mechanics as “a pipe that has a number of branches,
or a number of inlets or outlets); Dictionary of Mechanical Engineering (4th ed. 1996) (defining “manifold” as “a
chamber or pipe with many openings.”); Schlumberger Oilfield Glossary (defining “manifold” in the context of
production as “[a] common pipe or chamber having several lateral outlets.”); National Fire Protection Association
(NFPA) Glossary of Terms (2019 ed.) (defining “manifold” in the context of design and installation of oxygen-fuel
gas systems (NFPA 51) as “an assembly of pipe and fittings for connecting two or more cylinders for the purposes
of supplying gas to a piping system or directly to a consuming device.”).
5The 1986 MOU superseded an earlier 1978 MOU which included identical in substance language regarding
PHMSA jurisdiction. In 2004, PHMSA’s predecessor, USCG, and FERC executed an Interagency Agreement (IA)
to clarify and avoid duplicative regulation of waterfront LNG facilities. That IA similarly provided that USCG is
responsible for “all matters pertaining to the safety of facilities and equipment located in or adjacent to navigable
6



MOU designates USCG as responsible for regulatory requirements for “all matters pertaining to
structure or equipment (or portions thereof) located in the navigable waters and facilities located
between the vessel and the last manifold (or valve) immediately before the receiving tank(s)”
other than site selection responsibilities of PHMSA’s predecessor agency. Id. (emphasis added).
PHMSA’s predecessor agency was in turn responsible for establishing regulations with respect to
“all other matters pertaining to the facility beyond and (including) the last manifold (or valve)
immediately before receiving tank(s),” except those structures or equipment located in navigable
waters. Id. (emphasis added).
As applied to the Terminal, and consistent with federal statutes, regulations, MOUs, and
PHMSA guidance regarding the same, PHMSA jurisdiction does not begin until the last valve
located immediately before the receiving storage tank, D-4, which are located at the top and
bottom fill valves, HV-21066 and HV-20164 respectively. There is no “manifold” in this area as
that term is defined by Southern LNG in its procedures and as understood by industry.
Specifically, Southern LNG procedures define “manifolds” as “[c]omplex array of pipes and
valves that allows station operators to direct incoming fluids from any receiving point to pieces
of equipment or exit points.” Southern LNG Procedure LNG-P0005 Master Glossary. As
depicted in Figure 1, PHMSA jurisdiction begins downstream from the valve (HV-21601) and
piping involved in the May 15, 2018 event. That valve and piping are considered marine transfer
piping subject to USCG regulation under 33 C.F.R. Part 127 and explicitly excluded from
regulation by PHMSA under the plain language of 49 C.F.R. § 193.2001(b)(3).
There is no prior PHMSA enforcement precedent or regulatory guidance which indicates an
alternate jurisdictional demarcation and there is no support for PHMSA’s position that regulatory
jurisdiction between PHMSA and USCG stops and starts at the main fill valve for receiving
tanks. The NOPV’s expansive application of the Agency’s jurisdiction has not previously been
articulated to the regulated community and is contrary to fair notice requirements under the
Administrative Procedure Act (5 U.S.C. § 554), due process requirements under the U.S.
Constitution (U.S. Const. amend. V.), and newly promulgated Department of Transportation
regulations incorporating recent policy memorandums regarding transparency, due process, and
fairness in enforcement (49 C.F.R. Part 5).
B. PHMSA NOPV Item 2 Should be Withdrawn
1. PHMSA Allegation
§ 191.25 Filing safety-related condition reports.
(a) Each report of a safety-related condition under § 191.23(a) must be filed (received
by OPS within five working days, not including Saturday, Sunday, or Federal Holidays)
after the day a representative of the operator first determines that the condition exists,
waters up to the last valve immediately before the receiving tanks.” Interagency Agreement Among the FERC,
USCG, and the Research and Special Programs Administration for the Safety and Security Review of Waterfront
Import/Export Liquified Natural Gas Facilities (February 2004).
7



but not later than 10 working days after the day a representative of the operator
discovers the condition. Separate conditions may be described in a single report if they
are closely related. Reports may be transmitted by electronic mail to
InformationResourcesManager@dot.gov or by facsimile at (202) 366-7128.
KM failed to file a safety-related condition report as soon as the condition was discovered, but
not later than 10 working days after discovery, in violation of 49 C.F.R. § 195.25 [sic]. KM
filed the safety-related condition report on September 26, 2019, which is 288 working days
after discovery.
49 C.F.R. § 191.23(a)(6) states, in relevant part, that each operator shall report a safety-
related condition involving facilities in service with "[a]ny malfunction or operating error
that causes the pressure of a . . . LNG facility that contains or processes LNG to rise above
its . . . working pressure . . . plus the margin (build-up) allowed for operation of pressure
limiting or control devices." For plastic deformation to occur, the pipe must experience an
internal pressure that exceeds the yield stress of the pipe material. The fact that plastic
deformation occurred indicates that the LNG facility experienced an internal pressure above
its designed working pressure plus the allowable build-up for operation of pressure limiting
or control devices.
Despite concluding that a 3/4-inch vent valve was inadvertently left open, creating a
combustible mixture that resulted in a detonation and over pressure event in the pipe between
D-4 and HV-21061, KM did not file a safety related condition report until September 26,
2019, in violation of 49 C.F.R. § 195.25 [sic].
2. Southern LNG Response to NOPV Item 2
For the same reasons articulated in Section III.A.2, Southern LNG believes that the event in
question occurred in an area of the Terminal that is exclusively regulated by the USCG given
that it is a marine cargo transfer system exempt from PHMSA regulation. As such, PHMSA
SRC reporting regulations do not apply.
While Southern LNG believes that PHMSA does not have regulatory jurisdiction over the valve
and piping at issue in the NOPV, even if PHMSA does have jurisdiction, both NOPV Item 1 and
NOPV Item 2 cannot stand as a legal matter. By definition, a SRC report is not an “incident.”
49 C.F.R. § 191.3 (defining incident); 49 C.F.R. § 191.23(b)(2) (outlining circumstances where a
SRC report is not required, including a SRC that “is an incident or results in an incident before
the deadline for filing the safety-related condition report”). The reverse is also true. By
definition, a pipeline “incident” is not a SRC. PHMSA may not allege both under the relevant
Part 193 and Part 191 regulations for the same conditions.
On August 2, 2018, when the alleged SRC took place under the NOPV, the portion of the
Terminal at issue remained out of service. Southern LNG returned the line back to service on
November 11, 2018,6 after it completed repairs of the valve and fill line. As described above, in
6 Southern LNG letter to Mr. Urisko, PHMSA (Sep. 26, 2019).
8



order to be responsive to PHMSA’s request for a SRC report, Southern LNG filed a written SRC
report for the May 15, 2018 event on September 26, 2019, while expressly noting that it did not
consider the event to qualify as a SRC that required reporting under Part 191. Southern LNG
further requested that PHMSA waive the five day reporting requirement if it found that a report
was required; a request to which PHMSA did not respond.
IV. Proposed Civil Penalty Should be Withdrawn
Because a violation of PHMSA reporting regulations did not occur, the entirety of PHMSA’s
Proposed Civil Penalty should be withdrawn along with the NOPV allegations. Further,
PHMSA’s Proposed Civil Penalty as set forth in the Agency’s Proposed Civil Penalty Worksheet
does not accurately reflect the relevant statutory and regulatory penalty factors, including but not
limited to, good faith and other matters as justice may require.
V. Preliminary Statement of Issues
Southern LNG respectfully contests both alleged violations in the NOPV and the Proposed Civil
Penalty in their entirety and the Company intends to raise the following issues at the Hearing:
1. Whether NOPV Item 1, alleging a violation of 49 C.F.R. § 191.5(a), should be
withdrawn because it is incorrect as a matter of law;
2. Whether NOPV Item 2, alleging a violation of 49 C.F.R. § 191.25(a), should be
withdrawn because it is incorrect as a matter of law;
3. Whether PHMSA’s exercise of its jurisdiction violates due process and fair notice;
and
Whether the Proposed Civil Penalty should be withdrawn because the pipeline facility
at issue is not jurisdictional to PHMSA.
VI. Summary
For all of the reasons identified above, and in consideration of other matters as justice may
require, the Company respectfully requests that PHMSA withdraw the NOPV and the Proposed
Civil Penalty.
In the event that the parties are unable to resolve these issues in advance of a hearing, Southern
LNG intends to present evidence and engage in discussion with PHMSA on these issues at the
hearing in this case. Southern LNG reserves the right to revise and supplement this Written
Response and Statement of Issues at or before the hearing. Southern LNG also reserves the right
to respond to any new factual assertions or arguments introduced by PHMSA during the
proceeding of the case.
4. 9



Respectfully submitted,
Troutman Sanders, LLP
Catherine Little, Esq.
Annie Cook, Esq.
600 Peachtree Street NE, Suite 3000
Atlanta, GA 30308
(404) 885-3056
Southern LNG, L.L.C.
Patricia S. Frances, Esq.
Kinder Morgan, Assistant General Counsel
Jessica Toll, Esq.
Kinder Morgan, Assistant General Counsel
(303) 914-7630
Jessica_toll@kindermorgan.com
Date: February 21, 2020