# SANTEE COOPER - RAINEY GENERATING STATION — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 22022006NOPV
- **title:** SANTEE COOPER - RAINEY GENERATING STATION — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-02-10
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.605(b)(5), 192.615(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22022006nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22022006nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22022006nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22022006NOPV
**body:**

Notice of Probable Violation involving SANTEE COOPER - RAINEY GENERATING STATION. PHMSA's enforcement data identifies the cited regulations as 192.605(b)(5),  192.615(b)(2). The case was opened on 2022-02-10 and is reported as closed as of 2022-07-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22022006NOPV_Final Order_07072022_(21-203211).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22022006NOPV/22022006NOPV_Final%20Order_07072022_(21-203211).pdf

22022006NOPV_Final Order_07072022_(21-203211)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22022006NOPV/22022006NOPV_Final%20Order_07072022_(21-203211)_text.pdf

22022006NOPV_NOPV PCO_02102022_(21-203211).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22022006NOPV/22022006NOPV_NOPV%20PCO_02102022_(21-203211).pdf

22022006NOPV_NOPV_PCO_02102022_(21-203211)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22022006NOPV/22022006NOPV_NOPV_PCO_02102022_(21-203211)_text.pdf

22022006NOPV_Operator Response to Notice_04202022_(21-203211).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22022006NOPV/22022006NOPV_Operator%20Response%20to%20Notice_04202022_(21-203211).pdf

22022006NOPV_Final Order_07072022_(21-203211)_text.pdf

July 7, 2022
VIA ELECTRONIC MAIL TO: jimmy.staton@santeecooper.com
Mr. Jimmy Staton
President and Chief Executive Officer
Santee Cooper
One Riverwood Drive
Moncks Corner, South Carolina 29461
Re: CPF No. 2-2022-006-NOPV
Dear Mr. Staton:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and finds that the proposed actions to comply with the pipeline safety regulations have
been completed. This case is now closed. Service of the Final Order by e-mail is effective upon
the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. James Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Mr. Keith Smith, Station Manager, Rainey Generating Station, Santee Cooper,
keith.smith@santeecooper.com
Mr. Emory Connelly, Principal Engineer, Santee Cooper, ejconnel@santeecooper.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
___________________________________________
In the Matter of )
Santee Cooper, ) CPF No. 2-2022-006-NOPV
a/k/a South Carolina Public Service Authority, )
)
)
)
Respondent. )
___________________________________________ )
FINAL ORDER
On February 10, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Southern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Santee Cooper
(Respondent), also known as the South Carolina Public Service Authority.
1 The Notice proposed
finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 192 and
proposed certain measures to correct the violation. Respondent did not contest the allegation of
violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.615(b)(2) (Item 2) ─ Respondent failed to train the appropriate
personnel to assure that they are knowledgeable of the emergency procedures and
verify that the training is effective.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
The Director has indicated that Respondent completed the actions proposed in the Notice to
correct the violations. Therefore, it is not necessary to include the proposed compliance terms in
this Final Order.
1 The State of South Carolina website, available at https://ors.sc.gov/regulated-utilities/electric-natural-
gas/electric/sc-public-service-authority-santee-cooper (last accessed June 17, 2022).



Warning Item
With respect to Item 1, the Notice alleged probable violations of 49 C.F.R. § 192.605(b)(5), but
did not propose a civil penalty or compliance order for this item. Therefore, this is considered to
be a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
July 7, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 4831