# GENESIS PIPELINE USA, L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 22023002NOPV
- **title:** GENESIS PIPELINE USA, L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-07-28
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.440(b), 195.52(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023002nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023002nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023002nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22023002NOPV
**body:**

Notice of Probable Violation involving GENESIS PIPELINE USA, L.P.. PHMSA's enforcement data identifies the cited regulations as 195.440(b),  195.52(d). The case was opened on 2023-07-28 and is reported as closed as of 2024-06-04. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22023002NOPV_Closure Letter_06042024_(21-202409).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_Closure%20Letter_06042024_(21-202409).pdf

22023002NOPV_Closure Letter_06042024_(21-202409)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_Closure%20Letter_06042024_(21-202409)_text.pdf

22023002NOPV_Final Order_10172023_(21-202409).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_Final%20Order_10172023_(21-202409).pdf

22023002NOPV_Final Order_10172023_(21-202409)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_Final%20Order_10172023_(21-202409)_text.pdf

22023002NOPV_Operator Response to Notice_08222023_(21-202409).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_Operator%20Response%20to%20Notice_08222023_(21-202409).pdf

22023002NOPV_PCO_07282023_(21-202409).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_PCO_07282023_(21-202409).pdf

22023002NOPV_PCO_07282023_(21-202409)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023002NOPV/22023002NOPV_PCO_07282023_(21-202409)_text.pdf

22023002NOPV_Final Order_10172023_(21-202409)_text.pdf

October 17, 2023
VIA ELECTRONIC MAIL TO: jeff.gifford@genlp.com
Jeffrey W. Gifford
Vice President, HSSE
Genesis Energy, L.P.
811 Louisiana Street, Suite 1200
Houston, Texas 77002
Re: CPF No. 2-2023-002-NOPV
Dear Mr. Gifford:
Enclosed please find the Final Order issued in the above-referenced case to Genesis Pipeline
USA, L.P., a subsidiary of Genesis Energy, L.P. It makes a finding of violation and specifies
actions that need to be taken to comply with the pipeline safety regulations. When the terms of
the compliance order are completed, as determined by the Director, Southern Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. James A. Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Mr. John R. Jewett, Director, DOT Compliance, Genesis Energy, L.P.,
john.jewett@genlp.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Genesis Pipeline USA, L.P., ) CPF No. 2-2023-002-NOPV
a subsidiary of Genesis Energy, L.P., )
)
Respondent. )
____________________________________)
FINAL ORDER
On July 28, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Southern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Genesis Pipeline USA,
L.P. (Respondent). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct
the violation. Respondent did not contest the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.440 (Item 1) ─ Respondent failed to meet the regulation because
it did not assess the unique attributes and characteristics of its pipeline facilities in
its Public Awareness Program baseline message brochures provided to the
affected public.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



Warning Items
With respect to Item 2, the Notice alleged probable violations of 49 C.F.R. § 195.52 but did not
propose a civil penalty or compliance order for this item. Therefore, this is considered to be a
warning item. If OPS finds a violation of this provision in a subsequent inspection, Respondent
may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
October 17, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

22023002NOPV_Closure Letter_06042024_(21-202409)_text.pdf

VIA ELECTRONIC MAIL TO: garland.gaspard@genlp.com; John.jewett@genlp.com;
Jorge.morice@genlp.com.
June 4, 2024
Garland Gaspard
SVP, Operations & Engineering
Genesis Energy, L.P.
383 Highlandia Dr.
Baton Rouge, Louisiana 70810
CPF 2-2023-002-NOPV
Dear Mr. Gaspard:
On October 17, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Genesis Pipeline USA, L.P., a subsidiary of Genesis Energy, L.P., a Final Order in the
above-referenced case. This Order included a Compliance Order. Based on our review of the
documentation you provided, it has been determined that you have complied with the terms of
this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
James A. Urisko
Director, Southern Region
Pipeline and Hazardous Materials Safety Administration