# ENMARK ENERGY, INC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 22023011NOPV
- **title:** ENMARK ENERGY, INC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-07-28
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(a), 195.440(b), 195.452(b)(5), 195.452(i)(3), 195.452(l)(1)(ii), 195.588(b)(1), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023011nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023011nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023011nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22023011NOPV
**body:**

Notice of Probable Violation involving ENMARK ENERGY, INC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.440(b),  195.452(b)(5),  195.452(i)(3),  195.452(l)(1)(ii),  195.588(b)(1),  195.589(c). The case was opened on 2023-07-28 and is reported as closed as of 2024-06-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22023011NOPV_Closure Letter_06182024_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_Closure%20Letter_06182024_(21-202560).pdf

22023011NOPV_Closure Letter_06182024_(21-202560)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_Closure%20Letter_06182024_(21-202560)_text.pdf

22023011NOPV_Final Order_09192023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_Final%20Order_09192023_(21-202560).pdf

22023011NOPV_Final Order_09192023_(21-202560)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_Final%20Order_09192023_(21-202560)_text.pdf

22023011NOPV_Operator Response to Notice_08282023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_Operator%20Response%20to%20Notice_08282023_(21-202560).pdf

22023011NOPV_PCO_07282023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_PCO_07282023_(21-202560).pdf

22023011NOPV_PCO_07282023_(21-202560)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023011NOPV/22023011NOPV_PCO_07282023_(21-202560)_text.pdf

22023011NOPV_Closure Letter_06182024_(21-202560)_text.pdf

VIA ELECTRONIC MAIL TO: crader@enmarkenergy.com;
jtharpe@enmarkenergy.com
June 18, 2024
Connell Rader
President
Enmark Energy, Inc.
104 First Choice Drive
Madison, Mississippi 39110
CPF 2-2023-011-NOPV
Dear Mr. Rader:
On September 19, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Enmark Energy, Inc., a Final Order in the above-referenced case. This Order included
a Compliance Order. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
James A. Urisko
Director, Southern Region
Pipeline and Hazardous Materials Safety Administration

22023011NOPV_Final Order_09192023_(21-202560)_text.pdf

September 19, 2023
VIA ELECTRONIC MAIL TO: crader@enmarkenergy.com
Connell Rader
President
Enmark Energy, Inc.
104 First Choice Drive
Madison, Mississippi 39110
Re: CPF No. 2-2023-011-NOPV
Dear Mr. Rader:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southern Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. James Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Mr. Jeff Tharpe, Operations Manager, Enmark Energy, Inc., jtharpe@enmarkenergy.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Enmark Energy, Inc., ) CPF No. 2-2023-011-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On July 28, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Southern Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order
(Notice) to Enmark Energy, Inc. (Respondent). The Notice proposed finding that Respondent
had violated the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed
certain measures to correct the violations. Respondent did not contest the allegations of violation
or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.440(b) (Item 1) ─ Respondent failed to assess the unique attributes and
characteristics of its pipeline and facilities in its Public Awareness Program;
49 C.F.R. § 195.452(i)(3) (Item 2) ─ Respondent failed to evaluate the capability
of its leak detection means;
49 C.F.R. § 195.452(l)(1)(ii) (Item 3) ─ Respondent failed to maintain documents
to support the decisions and analyses to implement and evaluate each element of
its integrity management program with respect to performing risk assessments;
49 C.F.R. § 195.452(l)(1)(ii) (Item 4) ─ Respondent failed to maintain documents
to support the decisions and analyses to implement and evaluate each element of
its integrity management program with respect to assessing and evaluating the
integrity of its pipeline; and



49 C.F.R. § 195.588(b)(1) (Item 5) ─ Respondent failed to follow the
requirements of NACE SP0502-2010 when it performed an external corrosion
direct assessment in 2018.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
Warning Items
With respect to Items 6, 7, 8 and 9, the Notice alleged probable violations of 49 C.F.R. §§
195.402(a), 195.402(a), 195.452(b)(5), and 195.589(c), respectively, but did not propose a civil
penalty or compliance order for these items. Therefore, these are considered to be warning
items. If OPS finds a violation of any of these items in a subsequent inspection, Respondent may
be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
September 19, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false