# ENMARK ENERGY, INC — Notice of Amendment

- **operation:** document
- **citation:** CPF 22023012NOA
- **title:** ENMARK ENERGY, INC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-07-28
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3), 195.452(f)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023012noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023012noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22023012noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22023012NOA
**body:**

Notice of Amendment involving ENMARK ENERGY, INC. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(3),  195.452(f)(4). The case was opened on 2023-07-28 and is reported as closed as of 2023-12-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22023012NOA_Closure Letter_12182023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023012NOA/22023012NOA_Closure%20Letter_12182023_(21-202560).pdf

22023012NOA_Closure Letter_12182023_(21-202560)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023012NOA/22023012NOA_Closure%20Letter_12182023_(21-202560)_text.pdf

22023012NOA_Notice of Amendment_07282023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023012NOA/22023012NOA_Notice%20of%20Amendment_07282023_(21-202560).pdf

22023012NOA_Notice of Amendment_07282023_(21-202560)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023012NOA/22023012NOA_Notice%20of%20Amendment_07282023_(21-202560)_text.pdf

22023012NOA_Operator Response to Notice_08302023_(21-202560).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22023012NOA/22023012NOA_Operator%20Response%20to%20Notice_08302023_(21-202560).pdf

22023012NOA_Closure Letter_12182023_(21-202560)_text.pdf

VIA ELECTRONIC MAIL TO: crader@enmarkenergy.com;
jtharpe@enmarkenergy.com
December 18, 2023
Connell Rader
President, Enmark Energy, Inc.
104 First Choice Drive
Madison, MS 39110
CPF 2-2023-012-NOA
Dear Mr Rader:
On November 1 to November 4, 2021, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Enmark Energy procedures in Madison, MS.
As a result of the inspection, Enmark Energy was issued a Notice of Amendment on July 28,
2023, which proposed amendment of your procedures.
Enmark Energy submitted its amended procedures on September 29, 2023. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Please be
advised that this letter refers only to the referenced NOA (CPF #2-2023-012-NOA) and not to
any other PHMSA cases, if any. Thank you for your cooperation.
Sincerely,
James A. Urisko
Director, Southern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration

22023012NOA_Notice of Amendment_07282023_(21-202560)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: crader@enmarkenergy.com;
jtharpe@enmarkenergy.com
July 28, 2023
Connell Rader
President, Enmark Energy, Inc.
104 First Choice Drive
Madison, MS 39110
CPF 2-2023-012-NOA
Dear Mr. Rader:
From November 1 to November 4, 2021, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Enmark Energy (Enmark) procedures for Maintenance, Operations, and Integrity
Management in Madison, MS.
On the basis of the inspection PHMSA has identified the apparent inadequacies found within
Enmark’s plans or procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) . . .
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(1) . . .



(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
Enmark failed to meet the regulation because it did not have in its manual of written
procedures that supervisors maintain a thorough knowledge of the corrosion control
procedures, as required by §195.555 (Subpart H).
During the inspection, Enmark did not have in its procedural manual for operations,
maintenance, and emergencies, or its Operator Qualification Program, a means to require
and verify that supervisors maintain a thorough knowledge of that portion of the
corrosion control procedures established under §195.402(c)(3) for which they are
responsible for insuring compliance.
2. § 195.452(f) What are the elements of an integrity management program?
(a) . . .
(f) An integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating experience,
conclusions drawn from results of the integrity assessments, and other maintenance
and surveillance data, and evaluation of consequences of a failure on the high
consequence area. An operator must include, at minimum, each of the following
elements in its written integrity management program:
(1) . . .
(4) Criteria for remedial actions to address integrity issues raised by the assessment
methods and information analysis (see paragraph (h) of this section);
Enmark failed to meet the regulation because its written integrity management program
did not include all criteria for remedial actions to address integrity issues raised by the
assessment methods and information analysis as described in 195.452(h). Specifically,
Enmark did not include in its written integrity management program a process to notify
PHMSA if they cannot meet the schedule for evaluation and remediation required and
cannot provide safety through a temporary reduction in operating pressure, or when a
pressure reduction exceeds 365 days.
Enmark’s Integrity Management Program (IMP), dated December 2021, prescribed
actions required to carry out its integrity management program. Section 7, titled “Pipeline
Repair Strategy,” stated “If indicated repair schedule requirements cannot be met,
Enmark will provide documentation that schedule delays are justified and will not
jeopardize the safety of the public or protection of the environment. Actual repair
measures are described in detail Enmark’s O&M Manual." Enmark did not specify a
notification to PHMSA if it cannot meet the remediation schedule.
Section 9 of Enmark’s IMP manual, titled “Procedures for identification of preventative and
mitigation measures,” stated “This pressure reduction would increase safety and operational
reliability but would reduce pipeline throughput volumes. Pressure reduction determinations
would be based upon calculations specified in ASME B31.4, or other appropriate and defensible



basis for determining safe operating pressure. Any pressure reduction would be limited to less
than 365 days, in which time Enmark would accomplish any repairs or solve any operational
problems associated with the pipeline." This statement limits any pressure reduction duration,
but does not require a notification to PHMSA if this were to exceed 365 days.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
60 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.



It is requested that Enmark Energy, Inc. maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures)
and submit the total to James A. Urisko, Director, Southern Region, Pipeline and Hazardous
Materials Safety Administration. In correspondence concerning this matter, please refer to
CPF 2-2023-012-NOA and, for each document you submit, please provide a copy in electronic
format whenever possible.
Sincerely,
James A. Urisko
Director, Southern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
Enclosures: Response Options for Pipeline Operators in Enforcement Proceedings
cc: Jeff Tharpe, Operations Manager - jtharpe@enmarkenergy.com
- **truncated:** false
- **body characters:** 9410