# COLONIAL PIPELINE CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 22024010NOA
- **title:** COLONIAL PIPELINE CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-07-15
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.452(f)(5), 195.505(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22024010noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22024010noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22024010noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22024010NOA
**body:**

Notice of Amendment involving COLONIAL PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 195.452(f)(5),  195.505(b). The case was opened on 2024-07-15 and is reported as closed as of 2025-06-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22024010NOA_Closure Letter_06022025_(22-235530).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22024010NOA/22024010NOA_Closure%20Letter_06022025_(22-235530).pdf

22024010NOA_Closure Letter_06022025_(22-235530)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22024010NOA/22024010NOA_Closure%20Letter_06022025_(22-235530)_text.pdf

22024010NOA_Notice of Amendment_07152024_(22-235530).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22024010NOA/22024010NOA_Notice%20of%20Amendment_07152024_(22-235530).pdf

22024010NOA_Notice of Amendment_07152024_(22-235530)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22024010NOA/22024010NOA_Notice%20of%20Amendment_07152024_(22-235530)_text.pdf

22024010NOA_Closure Letter_06022025_(22-235530)_text.pdf

VIA ELECTRONIC MAIL TO: mlittle@colpipe.com; qfrazier@colpipe.com;
dlangley@colpipe.com
June 2, 2025
Ms. Melanie Little
President, Chief Executive Officer
Colonial Pipeline Company
P.O. Box 1624
Alpharetta, GA 30009-9934
RE: CPF 2-2024-010-NOA
Dear Ms. Little:
On February 14, 2022, to February 17, 2022, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Colonial Pipeline Company’s procedures,
records, and facilities in New Jersey, Maryland, Texas, Georgia, Louisiana, North Carolina,
Tennessee, South Carolina, Mississippi, Alabama, and New York. On July 15, 2024, pursuant to
49 CFR § 190.206, PHMSA issued a Notice of Amendment which proposed amendment of
Colonial Pipeline Company’s procedures.
Colonial Pipeline Company submitted its amended procedures on May 20, 2025. PHMSA has
reviewed the amended procedures, and it appears that the inadequacies outlined in the Notice of
Amendment have been corrected.
This letter is to inform you that no further action is necessary, and this case is now closed.
Thank you for your cooperation.
Sincerely,
James A. Urisko
Director, Southern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration

22024010NOA_Notice of Amendment_07152024_(22-235530)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: mlittle@colpipe.com; qfrazier@colpipe.com;
dlangley@colpipe.com
July 15, 2024
Ms. Melanie Little
President, Chief Executive Officer
Colonial Pipeline Company
P.O. Box 1624
Alpharetta, GA 30009-9934
CPF 2-2024-010-NOA
Dear Ms. Little:
From February 14, 2022, to February 17, 2023, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code
(U.S.C.), inspected Colonial Pipeline Company’s (Colonial) procedures, records, and facilities in
New Jersey, Maryland, Texas, Georgia, Louisiana, North Carolina, Tennessee, Mississippi,
South Carolina, Alabama, and New York.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
Colonial’s plans or procedures. The items inspected and the inadequacies are described below:
1. §195.452 Pipeline integrity management in high consequence areas
(a) ….
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must continually
change the program to reflect operating experience, conclusions drawn from results of
the integrity assessments, and other maintenance and surveillance data, and evaluation
of consequences of a failure on the high consequence area. An operator must include, at
minimum, each of the following elements in its written integrity management program:
(1) ….
(5) A continual process of assessment and evaluation to maintain a pipeline's integrity
(see paragraph (j) of this section)….



2. Colonial failed to meet 49 C.F.R. §195.452(f)(5) because it did not include in its written
integrity management program a sufficient process of assessment and evaluation to maintain
a pipeline’s integrity using In-Line Inspection (ILI) assessments, pursuant to §§
195.452(j)(5)(i) and 195.591. Specifically, Colonial did not specify which ILI tool analyst
qualification levels, as described in ANSI/ANST ILI-PQ-2005, are required to analyze the
ILI data.
49 C.F.R. § 195.591 specifically requires that “When conducting in-line inspection of
pipelines required by this part, each operator must comply with the requirements and
recommendations of API Std 1163, Inline Inspection Systems Qualification Standard…” API
Standard 1163, Second Edition, April 2013 (API 1163), Annex C, Section C.1.13 states, “In
addition, the operator should also discuss analyst’s qualifications (Level 1, Level 2, or Level
3) for whom should perform the analysis.” API 1163 references ANSI/ANST ILI-PQ-2005 in
section 2.
Colonial’s Integrity Management Program, Appendix L, titled ILI Technical Specification,
last revised in 2018, prescribed the responsibilities of Colonial and in-line inspection vendors
when conducting in-line inspection surveys of Colonial’s pipelines. Section 5 of this
document, titled “Personnel and Equipment Qualifications,” specified that “Personnel and
equipment used to perform in-line inspections and analyze the results shall be qualified
according to ASNT ILI-PQ, In-line Inspection Personnel Qualification and Certification.”
No additional information was presented in this document that describes to which level those
personnel must be qualified. The ANSI/ANST ILI-PQ-2005 standard does not prescribe
minimum qualification levels for acceptance by operators.
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must continually
change the program to reflect operating experience, conclusions drawn from results of
the integrity assessments, and other maintenance and surveillance data, and evaluation
of consequences of a failure on the high consequence area. An operator must include, at
minimum, each of the following elements in its written integrity management program:
(1) ….
(5) A continual process of assessment and evaluation to maintain a pipeline's integrity
(see paragraph (j) of this section);
Colonial failed to meet 49 C.F.R. § 195.452(f)(5) because its procedures did not establish a
continual process of assessment and evaluation to maintain a pipeline’s integrity.
Specifically, Colonial’s procedures did not specify a means for how Colonial will "otherwise
accept" an ILI tool run that did not meet the program's 100% of pipe wall inspection
threshold.
Appendix L of Colonial’s Integrity Management Program, titled “ILI Technical
Specification,” last revised in 2018, prescribed the responsibilities of Colonial personnel and
in-line inspection vendors in conducting in-line inspection surveys of Colonial’s pipelines.
Section 9 of Appendix L, titled “Acceptance Criteria,” specified that “Unless otherwise
accepted by the COMPANY [Colonial], the inspection survey shall be deemed acceptable
only when 100 percent of the pipe wall has been inspected and the data is sufficient to meet



the performance specification.” Colonial procedure(s) did not elaborate on what situations
would be otherwise acceptable.
3. § 195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) ….
(b) Ensure through evaluation that individuals performing covered tasks are qualified;
Colonial failed to meet 49 C.F.R. § 195.505(b) because its procedures are not adequate to
ensure through evaluation that individuals performing covered tasks are qualified.
Colonial Procedure NOP-ROW-001, titled “Right-of-Way Procedure, Exposed Piping,”
dated December 13, 2022, prescribed guidelines for response to unintentionally exposed
pipe. This procedure did not require that personnel who examine exposed portions of buried
pipelines are qualified to do so. This procedure also allowed personnel who are not qualified
to conduct coating inspections to determine severity before the appropriate department
(Corrosion Control) is notified of the exposure. Consequently, if an unqualified individual
determines the coating is in “good” condition, no corrosion control measures are
implemented.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Enforcement Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
90 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested that Colonial Pipeline Company maintain documentation of the safety



improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to the Director, Southern Region, Pipeline and Hazardous
Materials Safety Administration. In correspondence concerning this matter, please refer to
CPF 2-2024-010-NOA and, for each document you submit, please provide a copy in electronic
format whenever possible.
Sincerely,
James A. Urisko
Director, Southern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings