- **summary:** CLOSED warning letter citing 192.5(a)(1), 192.5(b)(1), 192.5(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-22025002wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-22025002wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-22025002wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/22025002WL
**body:**

Warning Letter involving EL PASO NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.5(a)(1),  192.5(b)(1),  192.5(b)(2). The case was opened on 2025-07-15 and is reported as closed as of 2025-07-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

22025002WL_Warning Letter_07152025_(23-266055).pdf: https://primis.phmsa.dot.gov/enforcement-documents/22025002WL/22025002WL_Warning%20Letter_07152025_(23-266055).pdf

22025002WL_Warning Letter_07152025_(23-266055)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/22025002WL/22025002WL_Warning%20Letter_07152025_(23-266055)_text.pdf

22025002WL_Warning Letter_07152025_(23-266055)_text.pdf

WARNING LETTER
VIA ELECTRONIG MAIL TO: Steven Romano@kindermorgan.com;
Tom Otjen@kindermorgan.com; Zach Ragain@kindermorgan.com
July 15, 2025
Steven Romano
Chief Operating Officer
El Paso Natural Gas Co.
1001 Louisiana St.
Suite 1000
Houston, TX 77002
CPF 2-2025-002-WL
Dear Mr. Romano:
From February 21, 2023 to October 20, 2023, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to
Chapter 601 of 49 United States Code (U.S.C.), inspected El Paso Natural Gas Company,
L.L.C. (EPNG) procedures, records, and facilities in Oklahoma, Texas, New Mexico,
Colorado, and Arizona.1
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1. § 192.5 Class Locations.
1 El Paso Natural Gas Company, L.L.C., is a subsidiary of Kinder Morgan. See
https://pipeportal.kindermorgan.com/portalui/DefaultKM.aspx?TSP=EPGD (last accessed June 2, 2025).



(a) This section classifies pipeline locations for purposes of this part. The following
criteria apply to classifications under this section.
(1) A “class location unit” is an onshore area that extends 220 yards (200 meters)
on either side of the centerline of any continuous 1- mile (1.6 kilometers) length of
pipeline.
(2)….
(b) Except as provided in paragraph (c) of this section, pipeline locations are
classified as follows:
(1) A Class 1 location is:
(i) An offshore area; or
(ii) Any class location unit that has 10 or fewer buildings intended for human
occupancy.
(2) A Class 2 location is any class location unit that has more than 10 but fewer
than 46 buildings intended for human occupancy.
EPNG failed to comply with 49 CFR § 192.5(b)(2) because it did not properly identify
certain Class 2 locations.
At the time of PHMSA's inspection, EPNG presented its current class locations graphically
through Kinder Morgan’s GeoMap software. Two locations, one just west of Amarillo,
Texas, and the other just west of Flagstaff, Arizona, were classified as Class 1 locations in
the GeoMap software. However, each of these locations met the definition of a Class 2
location.
Each location consisted of a main line with a branch line extending laterally from the main
line. Each main line was listed as a Class 1 location, while the branch line was listed as a
Class 2 location. In each location, buildings intended for human occupancy (BIHOs) were
located within 220 yards of the centerline on the mainline and branch line such that more
than 10 BIHOs were contained within the class location unit extending from the main line
to the branch line. The transition from the main to the branch line is a continuous length of
pipeline under § 192.5(a)(1).
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$272,926 per violation per day the violation persists, up to a maximum of $2,729,245 for a
related series of violations. For violation occurring on or after December 28, 2023 and before
December 30, 2024, the maximum penalty may not exceed $266,015 per violation per day the
violation persists, up to a maximum of $2,660,135 for a related series of violations. For violation
occurring on or after January 6, 2023 and before December 28, 2023, the maximum penalty may
not exceed $257,664 per violation per day the violation persists, up to a maximum of $2,576,627
for a related series of violations. For violation occurring on or after March 21, 2022 and before
January 6, 2023, the maximum penalty may not exceed $239,142 per violation per day the



violation persists, up to a maximum of $2,391,142 for a related series of violations. For violation
occurring on or after May 3, 2021 and before March 21, 2022, the maximum penalty may not
exceed $225,134 per violation per day the violation persists, up to a maximum of $2,251,334 for
a related series of violations. For violation occurring on or after January 11, 2021 and before
May 3, 2021, the maximum penalty may not exceed $222,504 per violation per day the violation
persists, up to a maximum of $2,225,034 for a related series of violations. For violation
occurring on or after July 31, 2019 and before January 11, 2021, the maximum penalty may not
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for
a related series of violations.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the items identified in this letter. Failure to do so will result in
EPNG being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 2-2025-002-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. § 552(b).
Sincerely,
James A. Urisko
Director, Southern Region, Office of Pipeline Safety