{"operation":"document","citation":"CPF 320035019H","title":"CITGO PIPELINE CO — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2003-07-17","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320035019H","body":"Corrective Action Order involving CITGO PIPELINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2003-07-17 and is reported as closed as of 2013-11-14. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320035019H_CAO_07172003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_CAO_07172003.pdf\n\n320035019h_cao_07172003_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019h_cao_07172003_text.pdf\n\n320035019H_Closure_11142013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_Closure_11142013.pdf\n\n320035019H_Closure_11142013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_Closure_11142013_text.pdf\n\n320035019H_Closure_11142013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nNovember 14, 2013\nMr. Carl Ostach\nVice President, Domestic Field Operations\nWest Shore Pipe Line\n5 TEK Park\n9999 Hamilton Boulevard\nBreinigsville, Pennsylvania 18031\nMr. Jim Sanders\nGeneral Manager Terminals and Pipelines\nCITGO Petroleum Corporation\n123 Eldridge Parkway\nHouston, Texas 77077\nCPF No. 3-2003-5019H\nDear Mr. Ostach and Mr. Sanders:\nOn July 17, 2003, the Pipeline and Hazardous Materials Safety Administration (PHMSA)\nissued to CITGO Petroleum Corporation a Corrective Action Order in the above-referenced\ncase. This Order included a requirement to take corrective actions on your pipeline.\nBuckeye Partners, LP became the operator of the West Shore Pipeline on January 1, 2009.\nBased on our review of the documentation you provided, it has been determined that you\nhave complied with the terms of this Order.\nAccordingly, this case is now closed and no further action is contemplated with respect to\nthe matters involved in this case. Thank you for your cooperation in this matter.\nSincerely,\nLinda Daugherty\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2005}