# CITGO PIPELINE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 320035019H
- **title:** CITGO PIPELINE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2003-07-17
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320035019h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320035019H
**body:**

Corrective Action Order involving CITGO PIPELINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2003-07-17 and is reported as closed as of 2013-11-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320035019H_CAO_07172003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_CAO_07172003.pdf

320035019h_cao_07172003_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019h_cao_07172003_text.pdf

320035019H_Closure_11142013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_Closure_11142013.pdf

320035019H_Closure_11142013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035019H/320035019H_Closure_11142013_text.pdf

320035019H_Closure_11142013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 14, 2013
Mr. Carl Ostach
Vice President, Domestic Field Operations
West Shore Pipe Line
5 TEK Park
9999 Hamilton Boulevard
Breinigsville, Pennsylvania 18031
Mr. Jim Sanders
General Manager Terminals and Pipelines
CITGO Petroleum Corporation
123 Eldridge Parkway
Houston, Texas 77077
CPF No. 3-2003-5019H
Dear Mr. Ostach and Mr. Sanders:
On July 17, 2003, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to CITGO Petroleum Corporation a Corrective Action Order in the above-referenced
case. This Order included a requirement to take corrective actions on your pipeline.
Buckeye Partners, LP became the operator of the West Shore Pipeline on January 1, 2009.
Based on our review of the documentation you provided, it has been determined that you
have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to
the matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Director, Central Region
Pipeline and Hazardous Materials Safety Administration