# PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 320045013
- **title:** PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2004-04-26
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(b)(1), 195.452(c)(1), 195.452(c)(1)(i)(A), 195.452(e), 195.452(f), 195.452(g), 195.452(g)(4), 195.452(h)(2), 195.452(h)(4)(i), 195.452(i)(1), 195.452(j)(1), 195.452(j)(5), 195.452(k), 195.452(l)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320045013.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320045013.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320045013
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320045013
**body:**

Notice of Probable Violation involving PHILLIPS 66 PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.452(b)(1),  195.452(c)(1),  195.452(c)(1)(i)(A),  195.452(e),  195.452(f),  195.452(g),  195.452(g)(4),  195.452(h)(2),  195.452(h)(4)(i),  195.452(i)(1),  195.452(j)(1),  195.452(j)(5),  195.452(k),  195.452(l)(1). The case was opened on 2004-04-26 and is reported as closed as of 2007-02-15. Proposed civil penalty: $35,000. Assessed civil penalty: $35,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320045013_Final Order_08292005.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320045013/320045013_Final%20Order_08292005.pdf

cpf_320045013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320045013/cpf_320045013.pdf

320045013_Final Order_08292005.pdf

@
U.S. Deportment
of Tronsportotion
Pipeline ond
Hozordous tftoferiols Sofety
Administrotion
AUG 29 ru05
Mr. David ysebaert
General Manager
ConocoPhillips pipelines and Terminals
P.Q. Box 2t97 (772s2)
600 North Dairy Ashford
Houston, TX 77079
RE: CPF No. 3-2004-5013
Dear Mr. Ysebaert:
Enclosed is the Final order issued by the Associate Administrator for pipr
line Safety
lXlt":,:b"_:l,lffi"T* .ur": ,It makes findings of viotarion, assesses u .iuii ."d;":H:;;J;i
penalty of
of certain
:l'l,TlLg,il1,T"in,:lu"ce procedures. The Final Order urro ,p""ines actions ro
comply with the pipeline safety regulations and revision oicertain operating and
taken to
procedures. The penalty pay-"ttt terms are set forth in the Final order, w
ntenance
penalty is paid and the terms of the compriance order and amendment of pr
the civil
completed, as determined by the Director, central Region, 1ffi*frffi;i;:
ures are
ll:i"^d- Your receipt of the Final order constitutes service of that document undt
will be
s 190.5.
49 C.F.R.
Sincerely,
fik
Aa* /LL=-
t/ f,
Vm., Rewolds
Pipeline iompliance Registry
Office of Pipeline Safety
Enclosure
fteven G. Cooper, Counsel for Conocophillips
!_t..pl"n G. Ellison, Counsel for Conocophillips
Keith H. wooten, piperine integriiy Direetor, conocophiiiips
Ivan Huntoon, Director, CentraiRegion, OpS



Background
1n2002, Conoco merged with Phillips Petroleum Company to create a new entit
ConocoPhillips
Pipelines and Terminals. At that time each entity was operating a separate
ty Management
Program @vIP). An IMP inspection was conducted at Phillips inFebruary 2002
Conoco's IMP
was inspected by OPS in September,2002. Although Respondent informed O
of its intent to
integratethetwo separateIMPs, OPS toldRespondent in2002 thattheycouldmain
mtwo separate
baseline assessments. The Notice is unrelated to the factthat Respondent had
separate IMPs
at the time of the inspection.
FINDINGS OF VIOLATION
Uncontested
Respondent did not contest the alleged violation of $ 195.452 in Items 3(B),4(A-
B), and 7(A- E), 8(A, C), 9(A-C) and 10(A-B) of the Notice. Accordingly, I find
violated 49 C.F.R. Part 195. as more fullv described in the Notice:
49 C.F.R. 5 195.452(exl) - failure to identify or document the primary
for each assessed sesment.
49 C.F.R. $ 195.452(f) - failure to include in its written integrity
program a process for reviewing and updating assumptions used in the risk
49 C.F.R. $ 195.452(g) and (iX1-4) - failure to analyze all available in
about the integrity of the entire pipeline and the consequences of a fi
Respondent failed to provide for the timely use of the Assessment Hi
Plaruring Document, used to capture data from the information analysis;
develop a formal process to assure that the input information is cu
running the risk analysis, as the data obtained from prior internal inspec
(ILI) was not being used as required for input to the risk model or as val
the risk results; and failure to develop a formal process for conducti
Matter Experts (SME) evaluations that provides a logical documented st
49 C.F.R. $ 195.452(i)(1) - failure to take sufficient measures to p
mitigate the consequences of a pipeline failure that could affect
Respondent's Preventive and Mitigative Process needs to be expanded
HCA specific risk drivers that exist in each HCA and failure to integra
analysis with the preventive and mitigative process for HCA segments.
These findings of violation will be considered prior offenses in any subsequent
taken against Respondent.
, 5(A-C), 6(4.-
prior to
on tools
identify
its risk



Contested
Item 2 of the Notice alleged that Respondent violated 49 C.F.R. $ 195.452 (
including in its written baseline assessment plan(BAP) internal inspection tools
detecting deformation anomalies in the pipe that must be repaired as required by
$ 195.452(h). At the time of the inspection, Respondent was performing pipeli
evaluate only top side dents identified in High Consequences Areas (HCAs).
reviewed five out of eight ILI tool runs which revealed that only a gauging plate
identify deformations in the piggable segments. OPS determined that these ej
identified as prior assessments in the BAP, will require a geometry tool run to
assessment.
tXiXa) by not
(ILI) capable of
excavatrons to
OPS inspectors
assessments, all
ualify as a prior
Irr its response to ltem2" Respondent asserted that OPS failed to provide an
uate regulatory
basis for the Notice and that the IMP rules does not require that the internal i
Lon tool used in
its baseline assessment must be capable of discerning the anomalies listed in 49 C.F
R. $ 1e5.4s2(h).
Respondent argued that the internal inspection performed in its prior assessments
clearly meet the
requirements of the IMP rule. Respondent advised that it has made unp
rmderstand how OPS interpreted and implemented IMP. Respondent further advi
and integration of its two IMPs, Conoco and Phillips, is very complex. Respond
thatthemerger
t asserted that it
was first notified during the inspection that OPS interpreted the IMP regulati
assessments to require running geometry inspection tools in a more rigorous
on that the rule
requires.
OPS argued that the process used by Respondent was inadequate to find a
Respondent's plan was to run a MFL tool for top side dents with metal loss. The
the type of tool that can find the requisite defects and that the plan should have i
a deformation tool. OPS further argued that Respondent understands the intent
knowledge of the rule. As a result of an IMP inspection in February 2002, Phl
enforcement document that directed it to provide more details in the IMP processes
the inputs and outputs of these processes. On a second occasion, this matter was di
with the IMP team members of both Conoco and Phillips in September 2002,
official were present during most of the Conoco IMP inspection. OPS argued that
through two IMP inspections and the resulting enforcement action, Respondent
the IMP rule requirements.
or anomaly, as
MFL tool is not
luded the use of
and has clear
ips received an
Phillips IMP
rhaving gone
fully aware of
Respondent argued that had OPS advised Respondent earlier of OPS interpretati
could have been avoided. Respondent suggested that the violation has been
completed the baseline assessment for 50% of its pipe segments that could
employing the ILI tools identified by OPS.
the violation
as it has
,
bct HCAs by
OFS couiitered that, ,Jiiring ihc hearing, Respondent was informed that once its n
conducting a correct risk analysis were in place it should complete a new ri
segments in the Conoco and Phillips BAPs. OPS also requested the new risk a
applied first to those line segments that had not yet been assessed and then applied
ttrat naa akeadybeen assessed. OPS concluded that Respondent's post hearing sub
to show that Respondent addressed OPS directions and require additional modifi
procedures for
ranking of all
lysis process be
those segments
issions still fail



4
Contrary to Respondent's position, the focus of the Notice are the inadequate p
procedures to achieve the optimal results and not the fact that Respondent had
or was in the process of integrating the two program .h2002, OPS told Respond
maintain two separate baseline assessments.
, processes and
separate IMPs
that they could
At the time of the inspection, Conoco was using a geometry tool to assess de
along with an ILI tool to find other anomalies. However, Phillips used a gaugr
used a geometry tool occasionally. Phillips was only digging top side dents.
place but the process was inadequate to find the deformation anomalies, de
grooves. The plan should have included the use of a deformationtool. The MFL
of tool that can identify the requisite defects. There are two pieces of
implementation and the plan and process. There was a lack of consideration in
Respondent may have changed its plan as suggested on page 8 of its brief dated
and intends to meet the baseline assessment, at the time of the inspection
performing pipeline excavations to evaluate only top side dents identified in HC
post hearing submissions fail to show that this issue has been satisfactorily
I find that Respondent violated 49 C.F.R. g 195.452 (cXlXiXa) by not includi
baseline assessment plan ILI tools capable of detecting deformation anomalies in t
be repaired as required by 49 C.F.R. $ 195.452(h).
ns in the pipe
plate and only
process was in
I is not the type
involved. the
ugust I1,2004,
Respondent's
, Accordingly,
g in its written
pipe that must
Item 3A of the Notice alleged that Respondent violated 49 C.F.R. $ 195.4
establishing an integrity assessment schedule that prioritizes pipeline segments for
Notice further alleged Respondent did not base the assessment schedule on all
reflect the risk conditions on the pipeline segment. The factors an operator must
but are not limited to 49 C.F.R. $ 195.452 (e)(1)(! through (eXlXix). At the time
Respondent was using two different risk models to risk rank the pipelines and
was notprovided adequate informationto determinewhetherthehighestriskpipeh
being assessed as required by the IMP rule.
2 (e)(1) by not
risk factors that
ider include.
f the inspection,
inspection team
segments were
In its response to Item 34, Respondent asserted that prior to the merger each oper
completed baseline assessments of 50% of its riskiest pipeline segments that cou
within the required time frame and that each developed a written integrity mana
successfully
affect an HCA
t plan that
addressed the risks of each segment, with the baseline assessment to be developed
from prioritizingthe risk factors on each segment. Respondent explained that
efforts have been made to meet the requirements of each of the integrity manag
nce the merger,
ent plans of the
two legacy companies by performing the planned baseline assessments. Resp
that it has been working to create a third integrated integrity management plan
adopts the best
practices of each of the two legacy plans that one day will fully replace the two pl
Respondent
posed that OPS is aware of these efforts and support them. Respondent further ar1
that the IMP
rule recognizes lhat the livfP is a continually- changing program that will sr'zslr'r
frorn the initial
program and that a provision of the rule requires Respondent to document char
to its baseline
ptutt. fnt -le specifically contemplates at least one such change-when a new HC
is identified and
ihat newly identified HCA must be added to the baseline plan within one year
d assessed in 5
years.



OPS clarified that there can be a Conoco baseline assessment plan (BAP) and teHeritageBAP
or the Respondent can have a single BAP. It is the Respondent's choice. The is not whether
there are separate BAPs or a single BAP. OPS argued that its findings stemmed
Respondent's
failure to provide sufficient information during the inspection to support the ion that the two
lists were risk ranked as required by 49 C.F.R. 5 I95.452. There is a lack of il to explain the
process or to show how Respondent created the list of the highest risk pipeli segments. Both
IMPs lacked the attributes to demonstrate risk ranking, as OPS could not
ine from the
information provided how Respondent arrived at its results.
Contraryto Respondent:s position, the focus of Item 3 is an inadequate desc of the processes used to achieve the identified results, not whether it had BAP. Respondent submitted additional information during the pre-hearing and Much of the information submitted addressed Respondent's future plans to comp While there is no requirement that Respondent have a single BAP, adequate details to explain the process used to determine the prioritization of
assessed. Nevertheless, Respondent provided no information to support the pri
used to develop the two lists that risk ranked the pipelines. The process for priority of assessment action must be carefully explained. Respondent has fai
document the risk analysis process. Accordingly, I find that Respondent vi
519s,4s2 (eX1).
or explanation
BAPs or a single
-hearing stages.
e a single BAP.
must provide
me segments
ftrzatron process
ining the relative
to adequately
Iated 49 C.F.R.
ASSESSMENT OF PENALTY
Under 49 U.S.C. ' 60122, Respondent is subject to a civil penalty not to exc
' violation for each day of the violation up to a maximum of $1,000,000 for an
violations. The Notice proposed a $35,000 civil penalty for violations of 49 C.F $100,000 per
related series of
Part 195.
49 U.S.C. 5 60122 and 49 C.F.R. S 190.225 require that, in determining the penalty, I consider the following criteria: nature, circumstances, and gravity of the
of Respondent's culpability, history of Respondent's prior offenses, Respondent's
penalty, good faithbyRespondent in attempting to achieve compliance, the ability to continue in business, and such other matters as justice may require.
of the civil
iolation, degree
ility to pay the
n Respondent's
Item 2 of the Notice proposed a civil penalty of $20,000 for violati of 49 C.F.R.
$195.452(cX1)(a), as Respondent failed to include in its written baseline capable of detecting deformation anomalies in the pipe that must be repaired as
49 C.F.R. $ 195.452(h). In response to Item 2,ilte Respondent argued that t
penalty should not be levied for any real or perceived missteps it may have m
process because the IMP rule was meant to be a broad and flexible, performance
lew <ietaiied requirements. Respc,iideni explained that Conoco and Phillips
companies and that both met the first two IMP deadlines, to identify all pipeline se
affect HCAs and develop a written IMP. Respondent further explained that OPS t
the inspection the challenges ConocoPhillips faced in its efforts to create an inte
plan a ILI
uired by
proposed civil
in the learning
system with
frrrn rii cfinnl
that could
ognized during
IMP shortlyafter a merger.



The focus of the Notice and this Order are the inadequate plan, processes and p ures to achieve
the optimal results. The Notice is unrelated to the fact that Respondent had two e IMPs at
the time of the inspection. The primary objective of the Federal pipeline safety is public
safety. Failure to find the deformation anomalies, defects, gouges and grooves in subject areas
could result in a release and adversely affect public safety and the environment. R pondent has not
shown any circumstance that would have prevented or justified it not includi
in its written
baseline assessment plan an ILI capable of detecting deformation anomalies in t
pipe that must
be repaired as required by 49 C.F.R. $ 195.452(h). Accordingly, having review
the record and
considered the assessment criteria, I assess Respondent a civil penalty of $20,
for violation of
49 C.F.R. 5 r9s.4s2.
Item 3A of the Notice proposed a civil penalty of $10,000 for violation of 49 F.R.$ r9s.4s2
(eX1), as Respondent failed to provide sufficient details of the process used for pri
to prioritize the highest risk pipeline segments, and failed to adequately documen
ty assessment,
the risk analysis
process.
Respondent argued that OPS proposed a civil penaltybecause Respondent was ble to state with
absolute certainty that the baseline assessments performed on the two legacy IMP
will capture
50Yo of all the highest risk pipeline segments.
While there is no requirement for a statement of absolute certainty, Respondent
ust establish an
integrity assessment schedule that shows it prioritized the highest risk pipeli
segments and
describe in sufficient details the process and procedures used to achieve its resul
. Respondent is
required to base the assessment schedule on all relevant categories ofrisk factors t
reflect the risk
conditions on its pipeline, in accordance with 49 C.F.R. 5 195.452 (e)(1)(i) throu h (e)(l)(ix). An
operator's failure to sufficiently document its risk analysis process and analyze potential effects
ofpipeline failures on high consequence areas at specific locations along the pi ine will leave it
ill-prepared to address the severity and extent of the consequences that ensue fol
rwing a failure.
A release or failure under such circumstances increases the risk of harm to public and the
environment. Respondent has not shown any circumstance that would have prev
nted or justified
it not including sufficient details about the processes and procedures used to ri
rank its HCA
segments and the segments listed in Respondent's BAP. Accordingly, having rev ed the record
and considered the assessment criteria, I assess Respondent a civil penalty of $10,
for violation
,
of 49 C.F.R. g I9s. sZ(eXl).
Item 4C of the Notice proposed a civil penalty of $5,000 for violation of 49 C.F. $ 1e5.452(0,
as Respondent's factors for risk ranking facilities do not include the
fundamental reason for applying risk analysis techniques to integrity manage
obtain an integrated understanding of threats to segment integrity and potential losses of integrity. Therefore, it is essential that an operator's risk assessment
identifies the iirajor tl^r-r-eats to HCAs for a given pipeline segment or facility, id
threats rank in relation to each other, and how the segments and facilities com
based on the risk to HCAs. Respondent did not contest the allegation.
reviewed the record and considered the assessment crtterTa,I assess Respondent
of HCAs. A
programs is to
es from
h clearly
tifv ho'*r those
to each other
ingly, having
civil penalty of$5,000, for violation of 49 C.F.R. $ 195.452(t.



Accordingly, having reviewed the record and considered the assessment criteria, I a total civil penalty of $35,000. A determination has been made that Respo
pay this penalty without adversely affecting its ability to continue business.
Respondent
has the abilitv to
Payment of the civil penalty must be made within 20 days of service. Federal
(49 C.F.R. $ 89.21(b)(3)) require this payment be made by wire transfer, t Reserve Communications System (Fedwire), to the account of the U.S. Tr
instructions are contained in the enclosure. After completing the wire trans
the electronic funds transfer receipt to the Office of the Chief Counsel (
Hazardous Materials Administration, Room 8417, U.S. Department ofTransporta
Street, SW, Washington, DC 20590-0001.
gh the Federal
. Detailed
,
send a copy of
1), Pipeline and
on,400 Seventh
Questions conceming wire transfers should be directed to:
120), Federal Aviation Administration, Mike Monroney
Oklahoma City, OK 73125; (405) 954-8893.
Financial Operations vision (ANIZ-
Aeronautical Center. .O. Box 25082.
Failure to pay the $35,000 civil penalty will result in accrual of interest at the c
accordancewith3l U.S.C. $3717,31 C.F.R. $ 901.9 and49 C.F.R. $ 89.23. P
authorities, alate penalty charge of six percent (6%)per anntlm will be charged payment ls not
made within 110 days of service. Furthermore, failure to paythe civil penalty
of the matter to the Attorney General for appropriate action in an United States
annual rate in
to those same
result in referral
strict Court.
COMPLIAIICE ORDER
The Notice proposed a Compliance Order with regards to Item 3(A-B), 4(A), 5( ), and 7(A,C),
violation of 49 C.F.R .' 19 5 .452(eX 1 ), 19 5.452(D, 19 5 .a52G)0 X 1 -4), and 19 5 .4 ix1)
Under 49 U.S.C. $ 601 18(a), each person who engages in the transportation of liquids or
who owns or operates a pipeline facility is required to comply with the applicable
safety standards
established under chapter 601. Pursuant to the authority of 49 U.S.C. $ 601 18(b)
and 49 C.F.R
S I90.2I7, Respondent is hereby ordered to take the following actions to ensure
liance with
the pipeline safety regulations applicable to Respondent's operations:
1. Within 30 daysprovide aproposed schedule for establishing and implemen
amendments:
thefollowing
I. With regard to Item 3(a), develop a risk ranked Baseline
jointly or separately, with sufficient information to show that
pipeline segments are being assessed in a prioritized manner and
processes and procedures on how conducting the risk ranking of
affect segments and the risk ranking of the segrnents listed in the B
with 49 C.F.R. $ 19s.as2 (e)(1).
Plan, either
highest risk
lude detailed
he HCAs could
in aeeordarrce
,
IL With regard to Item 3(b), establish the primary risk threats for each
in accordance with 49 C.F.R. 5195.452 (eXl).
segment



8
ng assumptions
.F.R.$ r95.452
m.
With regard to Item 4(a), establish a process for reviewing and upd
that were used in the risk analysis process, in accordancewith 49
(f)
ry.
With regard to Item 5(a), revise your Assessment Plan Hi
Document to provide sufficient details of the results of your Infi
in accordance with 49 C.F.R. $ 195.a52 (g).
V.
With regard to Item 5(b), develop a process to review and
information is the most up to date information available
analysis, in accordance with 49 C.F.R. $ 195.a52 (g).
VL With regard to Item 5(c), develop a formal process for conducting
that provides a logical documented structure, if SME evaluations
apart of the IMP, in accordance with49 C.F.R. $ 195.a52 G).
vII. With regard to Item 7(a), develop a process to identify risk specific
for each HCA and review the existing preventive and mitiga
determine whether additional measures are required, in
5 res.4s2(i)(1) and (D(4).
Vm. With regard to
ItemT(c), develop a process that integrates the
analysis of each
HCA that could affect segment with the preventi
process for that
same segrnent in accordance with 49 C.F.R. $1
(rx4).
x. With regard to Item 1 (I-V[I), submit written procedu
implementation of the procedures satisfying the requirements of P
days of receipt of this Order, to Mr. Ivan Huntoon, Director, O
Safety, Central Region, 901 Locust, Room 452.,Kansas City, MO
The Regional Director may extend the period for complying with
the req
Respondent requests an extension and adequately justifies the reasons
for the ex
AMENDMENT OF PROCEDURES
and Planning
tion Analysis,
evaluations
ve measures to
with 49 C.F.R.
Its of the risk
and mitigative
.a52$)(r) and
and proof of
l95,within 180
e of Pipeline
106-264r.
items if the
Items 2, 4(B-C), 6(,4.-8), 7(8, D, E), 8(A, C), 9(A-C) and 10(A-B) of
Notice alleeed
inadequacies in Respondent's integfity management program and proposed to
ire amendment
of Respondent's procedures to comply with the requirements of 49 C.F.R. $$
s.as2(c)(1)(a),
r9s.4s2(t), r9s.4s2 (h)(2-4),19s.4s2(l)(r), r95.4s26)(1X2), r9s-452(k), r9s.4s
D(1XiXiD.
Respondent did not contest the proposed Notice of Amendment but reques
schedule to implement the provisions. Accordingly, I find that Respondent's inte
procedures are inadequate to ensure safe operation of its pipeline system' Pursu
g 6010S(a) and 49 C.F.R. 5 190.237, Respondent is ordered to make the followi
integrity management program and procedures. Respondent must:
an altemative
tymanagement
tto 49 U.S.C.
revisions to its



1. 2.
a
J .
4.
5. 6. ,7
8.
9. 10.
l 1 I t .
9
Amend your procedures to include a process that requires the use
detecting deformation anomalies when intemal tool surveys
assessment method. in accordance with those listed in 49 C.F.R.
tools capable of
chosen as the
res.452(h).
Amend your procedures to include a process that documents the
verall results of
integrated data analysis and conclusions regarding the integrity of
he segment. The
process must provide details on how to perform a detailed review
f the assessment
results, generate a repair schedule, and perform anintegrated eva
uation of overall
pipeline integrity.
Amend your procedures to include a process for risk ranking facil
factors for the presence of HCAs.
es that includes
Amend your procedures to provide sufficient details that c
procedure for discovery and repair of anomalies.
y describe your
Amend yourprocedures to revise your existing process for
in Appendix K of part 3 of your IMP. The revised process must
the requirements of paragraph 451.7 of ANSI837.4 regarding t
of a required pressure reduction.
reduction found
consistent with
implementation
Amend your procedures to include a process for evaluating preventi measures, including the impact on risk of implementing a preven
project.
andmitigative
ve or mitieative
Amend your procedures to revise your existing process for detection capability for HCAs that are in close proximity to the the evaluation of the potential risk reduction on these HCA could luating the leak
ine, including
t segments.
Amend your procedures to expand
guidance for the utilization of the
mitigative measures.
your process for EFRD eval
flow chart for evaluation
ation to include
preventive and
Amend your procedures to expand your procedure for sel assessment method and selection of the appropriate ILI tool(s), the appropriate
licable.
Amend your procedures to expand your procedures for conducti
assessment of a HCA that could affect the segment, as the revised
procedures submitted on August ll,2004, requires additional
a hydrostatic
hydrostatic test
ification.
A - - - J r u I l w l l u \ r n r r r h r n ^ a A t t . o o
J v u r l / r v v v u s r v o
your IMP, as the August
tc expand your progess for e'raluating th effectiveness of
11, 2004, submission requires additional ification.



12.
Amend your procedures to expand your process for commun
company the performance evaluation results on the effectiveness
any follow-up that may be required as the August II,2004, su
additional modifi cation.
13. Amend your procedures to expand your Management of Change
a revision control process to specifically address revision control
t4.
Amend your procedures to revise your corporate document
include the documents required by your IMP.
15. Submit the amended procedures within 30 days following recer
Director, Office of Pipeline Safety Central Region, 901 Locust,
City, MO 64106-2641.
The Regional Director may extend the period for complying with the requ
Respondent requests an extension and adequately justifies the reasons for the ex
WARNING ITEM
The Notice did not propose a civil penalty or corrective action for Item 1, 4(D) and
Respondent that it should take appropriate corrective action to correct the i
presented information in its response showing that it has addressed the cited ite
again warned that if OPS finds a violation in a subsequent inspection, en
taken.
Failure to comply with this Final Order may result in the assessment
of civil
$100,000 per violationper day, or in the referral of the case for judicial
enforcem
Under 49 C.F.R. $ 190.215, Respondent has a right to submit a Petition for R
Final Order. The petition must be received within 20 days of Respondent's
Order and must contain a brief statement of the issue(s). The filing of the peti
stays the payment of any civil penalty assessed. A11 other terms of the order, incl
corrective action and amendment of procedures, remain in full effect
Administrator, upon request, gfants a stay. The terms and conditions of this
effective upon receipt.
IMP, including
ission requires
ion schedule to
of this Order to
452, Kansas
items if the
(E) but warned
Respondent
Respondent is
action will be
Ities of up to
on of this
ipt of this Final
automatically
ng anyrequired
the Associate
inal Order are
C.
\ cj"i
I-$ ,/ \
( \
for Pipeline Safety
- **truncated:** false
- **body characters:** 27953