# CENEX PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 320055002
- **title:** CENEX PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-01-18
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.404(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055002.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055002.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055002
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320055002
**body:**

Notice of Probable Violation involving CENEX PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 195,  195.404(a). The case was opened on 2005-01-18 and is reported as closed as of 2006-09-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320055002_Final Order_09012006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055002/320055002_Final%20Order_09012006.pdf

CPF_3-2005-5002.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055002/CPF_3-2005-5002.pdf

320055002_Final Order_09012006.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety Administration
400 Seventh Street, S.W.
Washington, D.C. 20590
SEP - 1 2006
Mr. Dan Knepper
Vice President, Energy Operations
Cenex Pipeline, LLC
803 Highway 2 12 South
Laurel, MT 59044-0909
RE: CPF NO. 3-2005-5002
Dear Mr. Knepper:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the
above-referenced case. It makes a finding of violation and acknowledges your completion of the
proposed compliance order items to comply with the pipeline safety regulations. This case is
now closed. Your receipt of the Final Order constitutes service of that document under 49
C.F.R. § 190.5.
Sincerely,
~ & e s Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
cc: Ivan A. Huntoon
Director, Central Region, PHP-300
CERTIFIED MAIL -RETURN RECEIPT REQUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of
Cenex Pipeline, LLC,
Respondent
)
)
)
CPF NO. 3-2005-5002
FINAL ORDER
Between August 30 and October 2 1,2004, pursuant to 49 U.S.C. 8 60 1 17, a representative of the
Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS)
conducted an on-site pipeline safety inspection of Respondent's pipeline facilities in North
Dakota and records in Laurel, Montana. As a result of the inspection, the Director, Central
Region, OPS, issued to Respondent, by letter dated January 18,2005, a Notice of Probable
Violation and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. 8 190.207,
the Notice proposed finding that Respondent violated 49 C.F.R. 5 195.404(a) and proposed
ordering Respondent to take certain measures to correct the alleged violation.
Respondent failed to respond to the Notice within 30 days after it received the Notice.
Respondent responded to the Notice by letter dated April 8,2005 (Response). Respondent did
not contest the allegation of violation, informed OPS that it had revised its maps in accordance
with the Proposed Compliance Order, and submitted copies of its revised maps.
FINDING OF VIOLATION
Respondent did not contest the alleged violation in the Notice. Pursuant to 49 C.F.R. $8 190.213
and 190.21 7, I find that Respondent violated 49 C.F.R. 8 195.404(a) by failing to maintain
current maps of its pipeline system as more fully described in the Notice.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.



COMPLIANCE ORDER
Under 49 U.S.C. § 601 18(a), each person who engages in the transportation of hazardous liquids
or who owns or operates a pipeline facility is required to comply with the applicable safety
standards established under chapter 60 1. The Regional Director has indicated that Respondent
has submitted copies of the revised maps in accordance with the Proposed Compliance Order.
Since compliance has been achieved with respect to this violation, it is unnecessary to include
compliance terms in this Order.
The terms and conditions of this Final Order are effective on receipt.
SEP - 1 2006
yv,3+-T e dor L. Wi lke Date Issued
g Associate Administrator
Pipeline Safety