{"operation":"document","citation":"CPF 320055009","title":"TESORO HIGH PLAINS PIPELINE COMPANY LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2005-02-10","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a), 195.402(c), 195.402(c)(13), 195.402(e), 195.403(c), 195.404(c)(3), 195.406, 195.420(a), 195.426, 195.428(d), 195.436, 195.442(a), 195.569, 195.573(e), 195.575, 195.583, 195.585, 195.587, 195.589(c).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320055009.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320055009.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320055009","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320055009","body":"Notice of Amendment involving TESORO HIGH PLAINS PIPELINE COMPANY LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c),  195.402(c)(13),  195.402(e),  195.403(c),  195.404(c)(3),  195.406,  195.420(a),  195.426,  195.428(d),  195.436,  195.442(a),  195.569,  195.573(e),  195.575,  195.583,  195.585,  195.587,  195.589(c). The case was opened on 2005-02-10 and is reported as closed as of 2010-12-28. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320055009_Closure Letter_12282010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055009/320055009_Closure%20Letter_12282010.pdf\n\n320055009_Closure Letter_12282010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055009/320055009_Closure%20Letter_12282010_text.pdf\n\n320055009_Closure Letter_12282010_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nDecember 28, 2010\nMr. Michael L. McCann\nVice President, Pipeline & Terminals\nTesoro Refining and Marketing Company\n1900 Ridgewood Parkway\nSan Antonio, TX 78259\nCPF 3-2005-5009\nDear Mr. McCann:\nOn September 19-20, 2002; September 30-October 3, 2002; October 29-October 30, 2002 and\nNovember 19-21, 2002, representatives of the Central Region, Office of Pipeline Safety, and\nthe Minnesota Office of Pipeline Safety, pursuant to Chapter 601 of 49 United States Code,\nconducted an onsite pipeline safety inspection of your Operation and Maintenance Procedural\nmanuals at Roseville, MN and your records and field facilities in North Dakota and\nMinnesota. As a result of the inspection, Tesoro was issued a Notice of Amendment on\nFebruary 10, 2005, which proposed amendment of your procedures.\nTesoro submitted its amended procedures on March 11, 2005. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2138}