# BRIDGER PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 320055036
- **title:** BRIDGER PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-09-27
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(a), 195.402(c), 195.440, 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055036.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055036.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320055036
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320055036
**body:**

Notice of Probable Violation involving BRIDGER PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.402(a),  195.402(c),  195.440,  195.589(c). The case was opened on 2005-09-27 and is reported as closed as of 2006-10-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320055036_Final Order_02162006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055036/320055036_Final%20Order_02162006.pdf

CPF NO  3-2005-5036 BRIDGER PIPELINE LLC.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055036/CPF%20NO%20%203-2005-5036%20BRIDGER%20PIPELINE%20LLC.pdf

CPF_NO_3-2005-5036.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055036/CPF_NO_3-2005-5036.pdf

320055036_Final Order_02162006.pdf

U.S. Department 400Seventh Street, S.W.
of Transportation Washington, D.C. 20590
Pipeline and
Hazardous Morerials Wety
Administrotion
Mr. H. A. True, I11
President
Bridger Pipeline, LLC
455 North Poplar Street
Casper, WY 82601
Re: CPF No. 3-2005-5036
Dear Mr. Bridger:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in
the above-referenced case. It makes findings of violation and specifies actions to be taken to
comply with the pipeline safety regulations. When the terms of the Compliance Order are
completed, as determined by the Director, Central Region, OPS, this enforcement action will
be closed. Your receipt of this Final Order constitutes service of that document under 49
C.F.R. 9 190.5.
Sincerely,
James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
cc: Ivan Huntoon
Director, Central Region, OPS
CERTIPIED MAIL - RETURN RECEIPT REQUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of
Bridger Pipeline, LLC,
Respondent.
1
1
1
1
1
1
CPF NO. 3-2005-5036
FINAL ORDER
On June 6-10,2005, pursuant to 49 U.S.C. 9 601 17, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Central Region, conducted an on-site
pipeline safety inspection of Respondent's facilities and records in Newcastle, Wyoming and
Baker, Montana. As a result of the inspection, the Director, Central Region, PHMSA, issued to
Respondent, by letter dated September 27,2005, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. $ 190.207, the Notice proposed
finding that Respondent had committed violations of 49 C.F.R. Part 195, and proposed that
Respondent take certain measures to correct the alleged violations.
Respondent responded to the Notice by letter dated October 24,2005 (Response). Respondent
did not contest the allegations of violation but provided information concerning the corrective
actions it has initiated. Respondent did not request a hearing, and therefore has waived its right
to one.
FINDINGS OF VIOLATION
In its Response, Respondent did not contest the alleged violations in the Notice. Accordingly, I
find that Respondent violated the following sections of 49 C.F.R. Part 195, as more fully
described in the Notice:
49 C.F.R. 5 195.402(a) (Notice Item 1) -failing to prepare and follow procedures for
operations, maintenance, and emergencies for the 10" Little Missouri System in accordance
with all applicable requirements of Part 195; and
49 C.F.R. 6 195.402(c) (Notice Item 2) -failing to prepare and follow welding procedures
for pipeline repairs in accordance with the requirements of 9 195.226(c).



2
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Items 1 and 2 in the Notice. Under 49
U.S.C. 5 601 18(a), each person who engages in the transportation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under chapter 601. Pursuant to the authority of 49 U.S.C. 5 601 18(b) and 49 C.F.R.
5 190.217, Respondent is ordered to take the following actions to ensure compliance with the
pipeline safety regulations applicable to its operations:
1. Submit a general plan and proposed schedule for developing and implementing
procedures for operations, maintenance and emergencies that address the inadequacies
described in the ]\Jotice and meet the applicable requirements of 49 C.F.R. Part 195 to the
Director, Central Region, OPS;
2. Within 90 days following receipt of this Order, submit a copy of the written procedures
for operations, maintenance and emergencies addressing the inadequacies described in
the Notice and meeting the requirements of 49 C.F.R. Part 195 to the Director, Central
Region, OPS; and
3. Within 180 days following receipt of this Order: (1) complete the training of Bridger
personnel on the written procedures for operations, maintenance, and emergencies as
revised and updated; and (2) maintain records of the training including the names of
people trained and the dates the training occurred in accordance with applicable
recordkeeping requirements.
The Regional Director has indicated that Respondent has submitted a general plan and proposed
schedule for establishing the procedures and conducting the training. These actions comply with
the requirements in Item 1 of this Compliance Order.
The Regional Director may extend the period for complying with any of the required items if the
Respondent requests an extension in writing and adequately justifies the reasons for the
extension.
WARNING ITEMS
The Notice did not propose a civil penalty or compliance order for Items 3,4, and 5 in the
Notice. Therefore, these are considered warning items. The warnings were for Respondent's
failure to adequately follow its procedures for maintaining liaison with fire, police and other
public officials in accordance with 195.402!~)!12); failure to demonstrate that an adequate
public education program was established in accordance with 5 195.440; and failure to maintain
records of atmospheric corrosion surveys in accordance with 5 195.589. Respondent presented
information its response showing that it has initiated actions to address these items. Respondent



3
is warned that if these items are not fully addressed, enforcement action will be taken if a
subsequent inspection reveals a violation.
Under 49 C.F.R. 5 190.2 15, Respondent has a right to submit a petition for reconsideration of
this Final Order. Should Respondent elect to do so, the petition must be received within 20 days
of Respondent's receipt of this Final Order and must contain a brief statement of the issue(s).
The terms of the Order, including any required corrective action, remain in full effect unless the
Associate Administrator, upon request, grants a stay.
Failure to comply with this Final Order may result in the assessment of civil penalties of up to
$100,000 per violation per day, or in the referral of the case for judicial enforcement. The terms
and conditions of this Final Order are effective on receipt.
Date Issued
for Pipeline Safety