# CENTRA PIPELINE MINNESOTA INC. — Notice of Amendment

- **operation:** document
- **citation:** CPF 320061023M
- **title:** CENTRA PIPELINE MINNESOTA INC. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2006-11-22
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.905(a), 192.905(b), 192.905(c), 192.907(b), 192.909(a), 192.911(k), 192.911(l), 192.917(a), 192.917(b), 192.917(c), 192.917(e)(5), 192.933(b), 192.933(c), 192.933(d), 192.935(a), 192.935(b)(1)(iv), 192.935(c), 192.937(b), 192.943(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320061023m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320061023m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320061023m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320061023M
**body:**

Notice of Amendment involving CENTRA PIPELINE MINNESOTA INC.. PHMSA's enforcement data identifies the cited regulations as 192.905(a),  192.905(b),  192.905(c),  192.907(b),  192.909(a),  192.911(k),  192.911(l),  192.917(a),  192.917(b),  192.917(c),  192.917(e)(5),  192.933(b),  192.933(c),  192.933(d),  192.935(a),  192.935(b)(1)(iv),  192.935(c),  192.937(b),  192.943(b). The case was opened on 2006-11-22 and is reported as closed as of 2011-01-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320061023M_Closure Letter_01062011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320061023M/320061023M_Closure%20Letter_01062011.pdf

320061023M_Closure Letter_01062011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320061023M/320061023M_Closure%20Letter_01062011_text.pdf

320061023M_Closure Letter_01062011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 6, 2011
Mr. Todd Karry, President
Energy Fundamentals Group
2324 Main Street
London, Ontario
Canada N6P 1A9
Re: CPF 3-2006-1023M
Dear Mr. Karry:
On August 7-10, 2006, representatives from the Pipeline and Hazardous Materials Safety
Administration (PHMSA) and the Minnesota Office of Pipeline Safety, pursuant to chapter
601 of 49 United States Code, conducted an on-site pipeline safety inspection of the Centra
Pipelines Minnesota (EFG) integrity management procedures in Baudette, Minnesota. As a
result of the inspection, EFG was issued a Notice of Amendment on November 22, 2006,
which proposed amendment of your procedures.
Your current integrity management program, including the procedures which were amended
as a result of the 2006 inspection, was reviewed April 5-9, 2010 as part of a scheduled
integrity management inspection, and it appears that the inadequacies outlined in the Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2118
