{"operation":"document","citation":"CPF 320065020","title":"ZENITH ENERGY TERMINALS HOLDINGS, LLC — Notice of Probable Violation","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2006-03-03","effective_on":null,"summary":"CLOSED notice of probable violation citing 195.505(a), 195.505(b), 195.505(d), 195.505(e), 195.505(f), 195.505(g).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320065020.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320065020.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320065020","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320065020","body":"Notice of Probable Violation involving ZENITH ENERGY TERMINALS HOLDINGS, LLC. PHMSA's enforcement data identifies the cited regulations as 195.505(a),  195.505(b),  195.505(d),  195.505(e),  195.505(f),  195.505(g). The case was opened on 2006-03-03 and is reported as closed as of 2007-02-20. Proposed civil penalty: $7,500. Assessed civil penalty: $7,500. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320065020_Final Order_02202007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320065020/320065020_Final%20Order_02202007.pdf\n\n320065020_Final Order_02202007.pdf\n\nU.S. Department 400 Seventh Street, S.W.\nof Transportation Washington, D.C. 20590\nPipeline and Hazardous\nMaterials Safety ~dministration\nMr. Barry Frazier\nPresident\nCenter Terminal Company - Toledo\n600 Mason Ridge Center Drive\nSt. Louis, MO 63141\nRe: CPF No. 3-2006-5020\nDear Mr. Frazier:\nEnclosed is the Final Order issued by the Acting Associate Administrator for Pipeline Safety\nin the above-referenced case. It makes a finding of violation and assesses a civil penalty of\n$7,500. I acknowledge receipt of your wire transfer of $7,500 on April 5,2006 and accept it as\npayment in full of the civil penalty assessed in the Final Order. This case is now closed. Your\nreceipt of the Final Order constitutes service of that document under 49 C.F.R. $ 190.5.\nSincerely,\nw\nJames Reynolds\nPipeline Compliance Registry\ncc: Ivan Huntoon\nDirector, Central Region, PHMSA\nEnclosure\nCERTIFIED MAIL -RETURN RECEIPT REOUESTED\n\n\n\nDEPARTMENT OF TRANSPORTATION\nPIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION\nOFFICE OF PIPELINE SAFETY\nWASHINGTON, DC 20590\nIn the Matter of\nCenter Terminal Company - ) CPF NO. 3-2006-5020\nToledo )\n) 1\n1\n1\nRespondent 1\nFINAL ORDER\nOn March 3,2006, in accordance with 49 C.F.R. 5 190.207, the Director, Central Region,\nPipeline and Hazardous Materials Safety Administration (PHMSA), issued to Respondent a\nNotice of Probable Violation and Proposed Civil Penalty (Notice). The Notice proposed finding\nthat Respondent committed a violation of 49 C.F.R. Part 195 and proposed assessing a civil\npenalty of $7,500 for the alleged violation.\nRespondent did not contest the allegation in the Notice and submitted a wire transfer in the\namount of the proposed civil penalty ($7,500), waiving further right to respond and authorizing\nthe entry of this Final Order.\nPursuant to 49 C.F.R. $ 190.213 and 49 U.S.C. 5 60122, I find that Respondent violated the\nfollowing section of 49 C.F.R. Part 195, as more fully described in the Notice:\n49 C.F.R. 5 195.505-failing to have a written qualification program in place during the\nspecified period.\n- -\n\n\n\nThis finding of violation will be considered a prior offense in any subsequent enforcement action\ntaken against Respondent. Having reviewed the record and considered the assessment criteria, I\nassess Respondent a civil penalty of $7,500, already paid by Respondent.\nThe terms and conditions of this Final Order are effective on receipt.\nf ~ d f f r $ ~ b.Wiese\nAssociate Administrator\nfor Pipeline Safety\nate Issued","truncated":false,"body_characters":3118}