# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 320075002
- **title:** NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2007-02-08
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(a), 195.412(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320075002.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320075002.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320075002
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320075002
**body:**

Notice of Probable Violation involving NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.412(a). The case was opened on 2007-02-08 and is reported as closed as of 2011-02-10. Proposed civil penalty: $38,000. Assessed civil penalty: $38,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320075002_Closure Letter_02102011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_Closure%20Letter_02102011.pdf

320075002_Closure Letter_02102011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_Closure%20Letter_02102011_text.pdf

320075002_FinalOrder_02052009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_FinalOrder_02052009.pdf

320075002_FinalOrder_02052009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_FinalOrder_02052009_text.pdf

320075002_Notice Letter_02082007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_Notice%20Letter_02082007.pdf

320075002_Operator Response to notice letter_03282007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075002/320075002_Operator%20Response%20to%20notice%20letter_03282007.pdf

320075002_FinalOrder_02052009_text.pdf

Mr. Todd Denton
Vice President, Regional Operations
NuStar Energy, L.P.
2330 N. Loop 1604 West
San Antonio, TX 78248-4512
Re: CPF No. 3-2007-5002
Dear Mr. Denton:
Enclosed is the Final Order issued in the above-referenced case. It makes a finding of violation,
assesses a civil penalty of $38,000, and specifies actions that need to be taken by NuStar to
comply with the pipeline safety regulations. The penalty payment terms are set forth in the Final
Order. When the civil penalty has been paid and the terms of the compliance order completed,
as determined by the Director, Central Region, this enforcement action will be closed. Your
receipt of the Final Order constitutes service of that document under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ivan A. Huntoon, Director, Central Region, PHMSA
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [7005 0390 0005 6163 2621]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
______________________________
)
In the Matter of )
)
NuStar Energy, L.P. ) CPF No. 3-2007-5002
(f/k/a Valero, L.P.), )
)
Respondent. )
______________________________)
FINAL ORDER
Between May 15-17, June 12-14, June 19-22, and August 21-24, 2006, pursuant to 49 U.S.C. §
60117, a representative of the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), conducted an on-site safety inspection of the
interstate hazardous liquid pipeline facilities of Valero, L.P. (Valero or Respondent), located in
Missouri, Illinois, Indiana, Iowa, and Nebraska, and known as the Kaneb Pipeline. On or around
April 1, 2007, Valero changed its name to NuStar Energy, L.P., and currently operates the line
through its subsidiary, NuStar Pipeline Operating Partnership, L.P. NuStar Energy is a major
energy company operating over 4,000 miles of crude oil and petroleum product pipelines
throughout the United States.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated February 8, 2007, a Notice of Probable Violation, Proposed Civil Penalty and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Respondent had committed various violations of 49 C.F.R. Part 195,
assessing a civil penalty of $38,000, and requiring Valero to take certain measures to correct the
violations. The Notice also proposed finding that Respondent had committed another probable
violation of 49 C.F.R. Part 195 and warning Valero to take appropriate corrective action or be
subject to future enforcement action.
By letter dated March 28, 2007, Valero1 responded to the Notice (Response). The company
contested the allegations in part, requested that OPS reduce or eliminate the civil penalty, and
asked that OPS modify or withdraw the compliance order. Respondent did not request a hearing
and therefore has waived its right to one.
1 Valero responded to the Notice through its then-operating subsidiary, Kaneb Pipe Line Operating Partnership, L.P.



2
FINDINGS OF VIOLATION
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.412(a), which states:
§ 195.412 Inspection of rights-of-way and crossings under navigable
waters.
(a) Each operator shall, at intervals not exceeding 3 weeks, but at least
26 times each calendar year, inspect the surface conditions on or adjacent to
each pipeline right-of-way. Methods of inspection include walking, driving,
flying or other appropriate means of traversing the right-of-way….
The Notice alleged that Valero failed to conduct adequate inspections of the surface conditions
of its anhydrous ammonia pipeline rights-of-way in the following four locations:
1) At four road crossings between Mile Posts (MP) 41.4 and 45.4 near Mountain View,
2) 3) 4) Missouri;
MP 47.9 near Litchfield, Illinois;
MP 115.1 near Trillia, Illinois; and
MP 33.0 near Arlington, Nebraska.
Specifically, the Notice alleged that Valero relied upon aerial patrols to inspect these rights-of-
way but was unable to effectively “inspect the surface conditions on or adjacent to” them from
the air due to overgrown vegetation.
In its Response, Valero contested the allegation, arguing (1) that although the rights-of-way
might appear to be obstructed from the ground, they were clearly visible from the air; 2) that its
current patrols were adequate to identify third-party encroachments; and 3) some vegetation in
the rights-of-way might be useful in aerial inspections.2
Upon review, I find these arguments unpersuasive. Using aerial patrols for these four rights-of-
way as the sole method of inspection was inappropriate under § 195.412(a). The purpose of that
regulation is to ensure that operators regularly inspect the surface conditions of their pipeline
rights-of-way, by appropriate means, in order to detect encroachments and various other threats
to the integrity of their facilities. If an operator cannot view surface conditions, then aerial
patrols are ineffective. Respondent’s rights-of-way in these locations were covered in dense
overgrowth, as shown in Valero’s own photographs of the area.3 Relying solely on aerial patrols
is inappropriate in areas where such overgrowth prevented Valero from observing surface
conditions and potential damage to its facilities or encroachments to its rights-of-way.
Respondent could have used ground patrols as an additional method of inspection but elected not
to do so.
2 In its Response, Valero wrote, “….[I]t may actually be preferable to maintain some vegetation in the vicinity of the
pipeline in order to help identify small leaks. As noted, ammonia may not provide a direct visual result; however,
ammonia leaks can affect the foliage in the vicinity, meaning that it is easier for the pilot to visually identify small
leaks through foliage changes rather than through direct visual observation.” Response, at 2.
3 Response, Exhibit A.



3
Respondent’s assertion that a right-of-way for an anhydrous ammonia pipeline does not need to
be cleared as extensively as a petroleum pipeline is not supported by the regulations.
The pipeline safety regulations require patrols in order to reduce the risk of third-party
encroachments and other threats to the pipeline in advance of a leak. The regulations do not
carve out exceptions to the required patrols based on the type of hazardous product traveling
through the pipe. Although a release of anhydrous ammonia might alter the color of foliage,
relying on reports of an odor or a discoloration would only identify existing leaks but not address
unauthorized activities along the right-of-way.
Finally, Respondent’s post-inspection actions cannot serve to cure or reduce the violation. At the
time of the inspection, these four rights-of-way were obscured by overgrown vegetation.
Although Respondent has since cleared them, as depicted in the photographs provided to OPS,
Valero had an ongoing obligation to keep its rights-of-ways clear without necessitating a visit
from an OPS inspector. Accordingly, I find that Respondent violated 49 C.F.R. § 195.412(a) by
failing to adequately inspect the surface conditions on or adjacent to its pipeline rights-of-way in
the four locations described above.
These findings of violation will be considered a prior offense in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations.
49 U.S.C. § 60122 and 49 C.F.R. § 190.225 require that, in determining the amount of the civil
penalty, I consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; the Respondent’s ability to pay the penalty and any effect that
the penalty may have on its ability to continue doing business; and the good faith of Respondent
in attempting to comply with the pipeline safety regulations. In addition, I may consider the
economic benefit gained from the violation without any reduction because of subsequent
damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $38,000 for Respondent’s violations of 49 C.F.R. §
195.412(a), as set forth in Item 2 of the Notice and discussed more fully above. In its Response,
Valero requested that OPS review the penalty assessment and either waive or reduce the amount
on account of the company’s post-inspection actions to clear the rights-of-way, its alleged good
faith compliance with the regulations, and its proactive measures to improve its right-of-way
program. Respondent also asserted that no adverse environmental impacts had occurred on
account of the alleged violation.



4
I find these arguments unpersuasive for several reasons. First, while Respondent may have acted
promptly to correct the violations after the inspection occurred, Respondent failed to regularly
inspect its rights-of-way by an appropriate method, as required by § 195.412(a). The rights-of-
way should have been either patrolled by additional methods or kept cleared for aerial inspection
without the necessity of an inspector’s visit.
As for Respondent's good faith argument, PHMSA does indeed consider an operator's good faith
efforts to achieve compliance at the time the agency proposes a civil penalty amount. For
example, if an operator has taken reasonable steps to comply with a particular regulation but
such efforts are subsequently deemed insufficient as the result of an inspection, PHMSA may
consider such actions as a mitigating factor in calculating a civil penalty. Similarly, if an operator
acts on the basis of an incorrect, but otherwise reasonable, interpretation of a regulation, the
agency may propose a lower penalty than would otherwise be assessed. In this case, however,
Respondent failed to demonstrate that its patrols were conducted in a good faith effort to achieve
compliance. Respondent was aware of the overgrowth in the rights-of-way yet neglected to take
appropriate pre-inspection actions, either by adding ground patrols or other inspection methods
or by more thoroughly or by frequently clearing the rights-of-way. In addition, I would note that
Valero was issued a warning in 2004 to clear its rights-of-way on this same line.4
While it is fortunate that a release did not occur on the Kaneb Pipe Line while the rights-of-way
were covered by vegetative growth, this is not a basis upon which to reduce or eliminate the civil
penalty. Without consistent and effective patrols of the surface conditions of pipeline rights-of-
way, operators may be unaware of third-party encroachments or other damage that could lead to
pipeline accidents. It is particularly important that Respondent clear the Kaneb Pipeline rights-
of-way since many of them are located near roads, highways, and rivers. In addition, one of the
four rights-of-way cited above is located at a foreign pipeline crossing, thereby further increasing
the need for appropriate surface inspections.
Based upon the foregoing, I find that Respondent has not demonstrated any circumstances
justifying a reduction or waiver of the civil penalty. Accordingly, having reviewed the record
and considered the assessment criteria, I assess Respondent a total civil penalty of $38,000.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require this payment be made by wire transfer, through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, OK 73125; (405) 954-8893.
Failure to pay the $38,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a United
States District Court.
4 CPF No. 3-2004-5034W.



5
COMPLIANCE ORDER
The Notice also proposed a compliance order with respect to Item 2 for violation of 49 C.F.R. §
195.412(a). Under 49 U.S.C. § 60118(a), each person who engages in the transportation of
hazardous liquids or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under chapter 601. Pursuant to the authority of 40 U.S.C.
§ 60118(b) and 49 C.F.R. § 190.217, Respondent, now known as NuStar Energy, L.P., is ordered
to take the following actions to ensure compliance with the pipeline safety regulations applicable
to its operations. Respondent must-
1. Provide a plan and schedule of action for clearing the rights-of-way where aerial
patrolling is utilized. The plan must be provided to the Director, Central Region, Pipeline
and Hazardous Materials Safety Administration, 901 Locust Street, Room 462, Kansas
City, MO 64106.
2. Identify sections of pipeline rights-of-way along NuStar’s anhydrous ammonia line in
Missouri, Illinois, Indiana, Iowa and Nebraska that are overgrown and will remain
overgrown for a period of time while awaiting clearing. For these sections, Respondent
must provide an alternative means to aerial patrolling in order to comply with § 195.412.
3. Provide the plan and schedule to the Director within 30 days from the date of the receipt
of the Final Order.
4. Implement the plan and schedule required by Items 1 and 2 of this Compliance Order
within 60 days from the date of the receipt of the Final Order.
5. Maintain documentation of the safety improvement costs associated with fulfilling this
Compliance Order and submit the total to the Director, Central Region. Costs shall be
reported in two categories; 1) total cost associated with preparation/revision of plans,
procedures, studies, and analyses and 2) total costs associated with replacements,
additions, and other changes to pipeline infrastructure.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent demonstrating good cause for an extension.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
WARNING ITEM
With respect to Item 1, the Notice alleged a probable violation of Part 195 but did not propose a
civil penalty or compliance order for this item. Therefore, this item is considered to be a
warning item. The warning was for:



6
49 C.F.R. § 195.402(d)(5) (Notice Item 1) ─ Valero’s alleged failure to follow its
operating and maintenance procedures by neglecting to periodically review
personnel responses during abnormal operating conditions for the years 2004 and
2005.
Valero did not present any explanation in its Response regarding this allegation. Having
considered such information, I find, pursuant to 49 C.F.R. § 190.205, that a probable violation of
49 C.F.R. § 195.402(d)(5) (Notice Item 1) occurred as of the date of the inspection. NuStar
Energy is hereby advised to review and correct such conditions. In the event that OPS finds a
violation for this item in a subsequent inspection, NuStar Energy may be subject to future
enforcement action.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be received within 20 days of Respondent’s receipt of this
Final Order and must contain a brief statement of the issue(s). The filing of the petition
automatically stays the payment of any civil penalty assessed. All other terms of this order,
including any required corrective action, shall remain in full force and effect unless the Associate
Administrator, upon request, grants a stay. The terms and conditions of this Final Order shall be
effective upon receipt.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

320075002_Closure Letter_02102011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 10, 2011
Mr. Todd Denton,
Vice President, Regional Operations
NuStar Pipeline Operating Partnership L.P.
2330 N. Loop 1604 West
San Antonio, TX 78248-4512
CPF 3-2007-5002
Dear Mr. Denton:
On February 5, 2009, the Pipeline and Hazardous Material Safety Administration (PHMSA)
issued to Valero, L.P a Final Order, including a Civil Penalty and Compliance Order in the
above-referenced case. NuStar Energy, LP. is the current operator responsive to this Order. The
Compliance Order required that NuStar: 1) provide a plan and schedule of action for clearing the
right-of-way (ROW) where aerial patrolling is utilized, 2) identify sections of the pipeline ROW
along NuStar’s anhydrous ammonia line in Missouri, Illinois, Indiana, Iowa and Nebraska that
are overgrown and perform an alternative method of patrolling. Based on payment of the Civil
Penalty and a review of the documentation you provided on March 9, 2009 and January 25,
2011, it has been determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration

320075002_Notice Letter_02082007.pdf

@
U.S. Deporlrnent
of Tronsportotion
Pipellne ond
Hqzordous l$qterlols Sotefy
Admlnlstrqflon
901 Locust Street, Suite 462
Kansas City, MO 64106-2641
NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 8,2007
Mr. Rodney Reese
Vice President, Regional Operations
Valero L.P.
One Valero Way
Mail Stop C2G-140
San Antonio, TX 7 8249 -1616
cPF 3-2007-5002
Dear Mr. Reese:
On May 15-17, June 12-14, Jwe 19-22 and August 2l-24,2006, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601
of 49 United States Code inspected your Kaneb Pipe Line Company (Kaneb) anhydrous
ammonia pipeline facilities and records in Missouri, Illinois, Indiana, Iowa and Nebraska.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violation(s) are:
1) S195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall pr€pare and follow for each pipeline system a
manual of written procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies.



(d) Abnormal operation. The manual required by paragraph (a) of this section
must include procedures for the following to provide safety when operating
design limits have been exceeded:
(5) Periodically reviewing the response of operator personnel to determine
the effectiveness ofthe procedures controlling abnormal opdration and
taking corrective action where deficiencies are found.
Kaneb did not follow its operations and maintenance procedures and did not perform any
reviews of operator personnel responses to abnormal operating conditions (AOC's) during
the 2004 - 2006 time period inspected.
Kaneb has an appropriate AOC form (KPL-J-196) and used it to document the occurrence
of AOC's. However, a review of these forms showed your personnel did not use the
"EVALUATION" section of the form to periodically document any reviews of the
effectiveness ofthe procedures used in controlling the abnormal operations situations.
2) $195.412 Inspection of rights-of-way and crossings under navigable waters.
(a) Each operator shall, at intervals not exceeding 3 weeks, but at least 26 times each
calendar year, inspect the surface couditions on or adjacent to each pipeline
right-of-way. Methods of inspection include walking, driving, flying or other
appropriate means of traversing the right-of-way.
Kaneb did not adequately patrol numerous sections of the right-of-way on your anhydrous
ammonia pipeline system in Missouri, Illinois and Nebraska.
Kaneb uses aerial patrolling to inspect the condition of the pipeline righrof-way. The
right-of-way was found to be overgrown at several locations, making aerial patrolling an
ineffective means of inspecting the condition of the pipeline right-of-way. Your personnel
were aware of the poor right-of-way conditions and did not use any other means of patrol
in these areas of dense cover. Some areas noted during the audit of the anhydrous
ammonia pipeline system are as follows:
1)
2)
3)
4)
At 4 road crossings in an approximate 4 mile pipeline section from MP4l.4 to MP45.4
near Mountain View, Missouri (approximately 150 feet along the pipeline in each
direction from the road crossing, thence opening up into open cropland and being
clear)
In an approximate 500 foot section of woods at a foreign line crossing with a Conoco-
Phillips pipeline at MP 47.9 near Litchfield, Illinois
In an approximate 300 foot section of small woods on either side of a creek crossing at
MPI 15.1 near Trilla, lllinois
In an approximate 200 foot section of small woods on the west side of the Elkhorn
River crossing at MP33,0 near Arlington, Nebraska



Proposed Civil Penal8
Under 49 United States Code, $ 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of
$1,000,000 for any related series of violations. The Compliance Officer has reviewed the
circumstances and supporting documentation involved in the above probable violation(s) and
has recommended that you be preliminarily assessed a civil penalty as follows:
Item Number
L
PENALTY
$38,000
Warning Items
With respect to Item I we have reviewed the circumstances and supporting documents
involved in this case and have decided not to conduct additional enforcement action or
penalty assessment proceedings at this time. We advise you to promptly conect this item. Be
advised that failure to do so may result in Kaneb being subject to additional enforcement
action.
Proposed Comoliance Order
With respect to Item 2 pursuant to 49 United States Code $ 60118, the Pipeline and
Hazardous Materials Safety Administration proposes to issue a Compliance Order to Kaneb.
Please refer to the Proposed Compliance Order, which is enclosed and made a part of this
Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled,Response Options for Pipeline
Operators in Compliance Proceedings. Please refer to this document and note the response
options. If you do not respond within 30 days of receipt of this Notice, this constitutes a
waiver of your right to contest the allegations in this Notice and authorizes the Associate
Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice
to you and to issue a Final Order.
In your correspondence on this matter, please refer to CPF 3-2007-5002 and for each
document you submit, please provide a copy in electronic format whenever possible.
SincerelS
d/.,*." 0"lJ*,h;-
Ivan A. Huntoon
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings



PROPOSED COMPLIANCE ORDER
Pursuant to 49 Unite; States Code $ 601 18, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Kaneb a Compliance Order in regards to Item
Number 2 of the Notice for its anhydrous ammonia pipeline system in the states of Missouri,
Illinois, Indiana, Iowa and Nebraska incorporating the following remedial requirements to
enswe the compliance of Kaneb with the pipeline safety regulations:
1. Pertaining to inspection ofthe surface conditions on or adjacent to the pipeline right-
of-way, provide to Ivan A. Huntoon, Director, Central Region, Pipeline and
Hazardous Materials Safety Administration, 901 Locust Street, Room 462, Kansas
City, MO 64106 a plan and schedule of action for clearing the right-of-way where
aerial patrolling will be utilized.
2. The plan must identify sections of pipeline right-of-way throughout the system that are
overgrown and will remain overgrown for a period of time while awaiting clearing.
For these sections, Kaneb must provide an altemate means to aerial patrolling in order
to comply with inspection of the surface conditions on or adjacent to the pipeline
right-of-way as required by 9195.412.
3. Provide the plan and action schedule within 30 days from the date of receipt of the
Final Order.
4.
Implement the plan and schedule required by items 1 and 2, above, within 60 days
from the date ofreceipt ofthe Final Order.
5.
Kaneb shall maintain documentation of the safety improvement costs associated with
fulfilling this Compliance Order and submit the total to Ivan A. Huntoon, Director,
Central Region, Pipeline and Hazardous Materials Safety Administration, 901 Locust
Sffeet, Room 462, Kansas City, MO 64106. Costs shall be reported in two categories:
l) total cost associated with preparation/revision of plans, procedwes, studies and
analyses, and 2) total costs associated with replacements, additions and other changes
to pipeline infrastructure.
- **truncated:** false
- **body characters:** 27487