{"operation":"document","citation":"CPF 320085010H","title":"MARATHON PIPE LINE LLC — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2008-08-18","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320085010h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320085010h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320085010h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320085010H","body":"Corrective Action Order involving MARATHON PIPE LINE LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2008-08-18 and is reported as closed as of 2011-10-20. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320085010H_CAO_08182008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320085010H/320085010H_CAO_08182008.pdf\n\n320085010h_cao_08182008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320085010H/320085010h_cao_08182008_text.pdf\n\n320085010H_Closure Ltr_10202011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320085010H/320085010H_Closure%20Ltr_10202011.pdf\n\n320085010H_Closure Ltr_10202011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320085010H/320085010H_Closure%20Ltr_10202011_text.pdf\n\n320085010H_Closure Ltr_10202011_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nOctober 20, 2011\nMr. Shawn Lyon\nVice President of Operations\nMarathon Pipe Line, LLC\n539 South Main St.\nFindlay, Ohio 45840\nCPF 3-2008-5010-H\nDear Mr. Lyon:\nOn August 18, 2008, the Pipeline and Hazardous Materials Safety Administration (PHMSA)\nissued to Marathon Pipe Line, LLC a Corrective Action Order in the above-referenced case.\nThis Order included requirements to take corrective actions on your pipeline. Based on our\nreview of the documentation you provided, it has been determined that you have complied\nwith the terms of this Order.\nAccordingly, this case is now closed and no further action is contemplated with respect to the\nmatters involved in this case. Thank you for your cooperation in this matter.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":1752}