# PANHANDLE EASTERN PIPELINE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 320091009H
- **title:** PANHANDLE EASTERN PIPELINE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2009-05-13
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091009h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091009h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091009h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320091009H
**body:**

Corrective Action Order involving PANHANDLE EASTERN PIPELINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2009-05-13 and is reported as closed as of 2015-07-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320091009H_CAO_05132009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091009H/320091009H_CAO_05132009.pdf

320091009H_CAO_05132009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091009H/320091009H_CAO_05132009_text.pdf

320091009H_Closure_07082015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091009H/320091009H_Closure_07082015.pdf

320091009H_Closure_07082015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091009H/320091009H_Closure_07082015_text.pdf

320091009H_Closure_07082015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 8, 2015
Mr. Eric J. Amundsen
Vice President – Technical Services
Panhandle Eastern Pipe Line Company, LP
1300 Main Street
Houston, Texas 77002
CPF 3-2009-1009H
Dear Mr. Amundsen:
On May 13, 2009, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Panhandle Eastern Pipe Line Company, LP (a subsidiary of Energy Transfer Partners, LP) a
Corrective Action Order in the above-referenced case. This Order included a requirement to take
corrective actions on your 200 Line pipeline, and on June 30, 2015, you provided a Final Report
of the completed actions.
On April 16, 2015, PHMSA issued a Consent Order, CPF 3-2014-1008S that includes corrective
measures for the Panhandle Eastern Pipe Line system. Therefore, future corrective measures
applicable to your 200 Line pipeline will be performed per the terms of the Consent Order.
Accordingly, CPF 3-2009-1009H is now closed and no further action is contemplated with
respect to the matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration