# DCP MIDSTREAM — Notice of Amendment

- **operation:** document
- **citation:** CPF 320091012M
- **title:** DCP MIDSTREAM — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2009-07-27
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.905(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091012m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091012m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320091012m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320091012M
**body:**

Notice of Amendment involving DCP MIDSTREAM. PHMSA's enforcement data identifies the cited regulation as 192.905(c). The case was opened on 2009-07-27 and is reported as closed as of 2010-03-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320091012M_Closure Letter_03192010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091012M/320091012M_Closure%20Letter_03192010.pdf

320091012M_Closure Letter_03192010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091012M/320091012M_Closure%20Letter_03192010_text.pdf

320091012M_NOA_07272009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091012M/320091012M_NOA_07272009.pdf

320091012M_NOA_07272009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091012M/320091012M_NOA_07272009_text.pdf

320091012M_Response to NOA_08242009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091012M/320091012M_Response%20to%20NOA_08242009.pdf

320091012M_Closure Letter_03192010_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 19, 2010
Mr. Brent Backes
General Vice President and General Counsel
DCP Midstream
370 17th Street, Suite 2500
Denver, Colorado 80202
CPF 3-2009-1012M
Dear Mr. Backes:
On October 16-20, 2006 and October 30-November 1, 2006, representatives from the Pipeline
and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49
United States Code, conducted an on-site pipeline safety inspection of Duke Energy Field
Services’ integrity management procedures in Denver, Colorado. As a result of the
inspection, DCP Midstream was issued a Notice of Amendment on July 27, 2009, which
proposed amendment of your procedures.
DCP Midstream submitted its amended procedures on August 24, 2009. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Ivan A. Huntoon
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2163
