{"operation":"document","citation":"CPF 320091013M","title":"MoGAS PIPELINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2009-07-28","effective_on":null,"summary":"CLOSED notice of amendment citing 192.905(c), 192.911(k), 192.911(l), 192.911(m), 192.915(b), 192.917(a), 192.917(c), 192.917(e)(1), 192.919(e), 192.921(a)(1), 192.921(a)(4), 192.925(b), 192.933(b), 192.935(a), 192.935(b)(1), 192.935(c), 192.937(a), 192.937(b), 192.947(d).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091013m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091013m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091013m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320091013M","body":"Notice of Amendment involving MoGAS PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 192.905(c),  192.911(k),  192.911(l),  192.911(m),  192.915(b),  192.917(a),  192.917(c),  192.917(e)(1),  192.919(e),  192.921(a)(1),  192.921(a)(4),  192.925(b),  192.933(b),  192.935(a),  192.935(b)(1),  192.935(c),  192.937(a),  192.937(b),  192.947(d). The case was opened on 2009-07-28 and is reported as closed as of 2011-04-27. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320091013M_Closure Letter_04272011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091013M/320091013M_Closure%20Letter_04272011.pdf\n\n320091013M_Closure Letter_04272011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091013M/320091013M_Closure%20Letter_04272011_text.pdf\n\n320091013M_NOA_07282009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091013M/320091013M_NOA_07282009.pdf\n\n320091013M_NOA_07282009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091013M/320091013M_NOA_07282009_text.pdf\n\n320091013M_Operator response_08282009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091013M/320091013M_Operator%20response_08282009.pdf\n\n320091013M_Closure Letter_04272011_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 27, 2011\nMr. David Wallen\nVice President\nMoGas Pipeline LLC\n110 Algana Ct.\nSt. Peters, Missouri 63376\nRe: CPF 3-2009-1013M\nDear Mr. Wallen:\nOn March 19-21, 2007, representatives of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) and the Missouri Public Service Commission, pursuant to chapter\n601 of 49 United States Code, conducted an on-site pipeline safety inspection of the MoGas\nPipeline (previously Missouri Pipeline Company) integrity management procedures in St.\nPeters, Missouri. As a result of the inspection, MoGas was issued a Notice of Amendment on\nJuly 28, 2009, which proposed amendment of your procedures.\nMoGas responded on August 28, 2009, and has subsequently submitted its revised procedures.\nMy staff reviewed the amended procedures, including the latest revision submitted on April\n26, 2011, and it appears that the inadequacies outlined in this Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and that this case is now closed.\nThank you for your cooperation.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2508}