{"operation":"document","citation":"CPF 320091016M","title":"VECTOR PIPELINE, L.P. — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2009-07-28","effective_on":null,"summary":"CLOSED notice of amendment citing 192.917(c), 192.925(b), 192.933(b), 192.935(b)(1).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091016m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091016m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320091016m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320091016M","body":"Notice of Amendment involving VECTOR PIPELINE, L.P.. PHMSA's enforcement data identifies the cited regulations as 192.917(c),  192.925(b),  192.933(b),  192.935(b)(1). The case was opened on 2009-07-28 and is reported as closed as of 2010-03-19. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320091016M_Closure Letter_03192010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091016M/320091016M_Closure%20Letter_03192010.pdf\n\n320091016M_Closure Letter_03192010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091016M/320091016M_Closure%20Letter_03192010_text.pdf\n\n320091016M_NOA_07282009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091016M/320091016M_NOA_07282009.pdf\n\n320091016M_NOA_07282009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091016M/320091016M_NOA_07282009_text.pdf\n\n320091016M_Operator_Response_08252009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091016M/320091016M_Operator_Response_08252009.pdf\n\n320091016M_Closure Letter_03192010_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nMarch 19, 2010\nMr. Steve Letwin\nExecutive Vice President, Gas\nEnbridge Employee Services Inc.\n1100 Louisiana\nHouston, TX 77001\nCPF 3-2009-1016M\nDear Mr. Letwin:\nOn July 23-27, 2007 and July 30-31, 2007, representatives from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of the Vector Pipeline L.P. (Vector) integrity\nmanagement procedures in Superior, Wisconsin. As a result of the inspection, Vector was\nissued a Notice of Amendment on July 28, 2009, which proposed amendment of your\nprocedures.\nVector submitted its amended procedures on August 25, 2009. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nIvan A. Huntoon\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2182}