# ONEOK NGL PIPELINE, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 320095007
- **title:** ONEOK NGL PIPELINE, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2009-06-29
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.561(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320095007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320095007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320095007
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320095007
**body:**

Notice of Probable Violation involving ONEOK NGL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulation as 195.561(b). The case was opened on 2009-06-29 and is reported as closed as of 2013-11-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320095007_Final Order_11272013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320095007/320095007_Final%20Order_11272013.pdf

320095007_Final Order_11272013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320095007/320095007_Final%20Order_11272013_text.pdf

320095007_NOPV PCP_06292009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320095007/320095007_NOPV%20PCP_06292009.pdf

320095007_NOPV PCP_06292009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320095007/320095007_NOPV%20PCP_06292009_text.pdf

320095007_Final Order_11272013_text.pdf

NOVEMBER 27, 2013
Mr. Terry K. Spencer
President
ONEOK NGL Pipeline, LP
100 West 5th Street
Tulsa, OK 74103
Re: CPF No. 3-2009-5007
Dear Mr. Spencer:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and finds that ONEOK NGL Pipeline, LP, has completed the actions specified in the
Notice to comply with the pipeline safety regulations. Therefore, this case is now closed.
Service of the Final Order by certified mail is deemed effective upon the date of mailing, or as
otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Linda Daugherty, Director, Central Region, OPS
Mr. Wes Christensen, Senior Vice President, Operations
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
ONEOK NGL Pipeline, LP, ) CPF No. 3-2009-5007
)
Respondent. )
____________________________________)
FINAL ORDER
On the dates of April 16-20, 2007, April 23-27, 2007, April 30-May 3, 2007, May 14-18, 2007,
June 4-8, 2007, July 10-13, 2007, July 23-26, 2007, and December 17-19, 2007, pursuant to
49 U.S.C. § 60117, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), conducted an on-site pipeline safety
inspection of the facilities and records of ONEOK NGL Pipeline, LP (ONEOK or Respondent),
relating to its Line 5 pipeline construction project near Hutchinson, Kansas, and Argonia,
Kansas. ONEOK owns and operates over 2400 miles of natural gas liquid pipelines that
transport natural gas from production areas throughout Oklahoma, Kansas and Texas.1
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated June 29, 2009, a Notice of Probable Violation and Proposed Compliance Order
(Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that ONEOK had
violated 49 C.F.R. § 195.561 and ordering Respondent to take certain measures to correct the
alleged violation.
ONEOK responded to the Notice by letter dated July 31, 2009 (Response). The company did not
contest the allegation of violation but provided information concerning the corrective actions it
had taken and planned to take. Respondent did not request a hearing and therefore has waived its
right to one.
FINDING OF VIOLATION
In its Response, ONEOK did not contest the allegation in the Notice that it violated 49 C.F.R.
Part 195, as follows:
1 ONEOK Partners, LP, available at
http://www.oneokpartners.com/Customers/NaturalGasLiquids/Pipelines/NGLPipeline.aspx (last accessed on
September 30, 2013).



2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.561(b), which states:
§ 195.561 When must I inspect pipe coating used for external
corrosion control?
(a) You must inspect all external pipe coating required by §195.557
just prior to lowering the pipe into the ditch or submerging the pipe.
(b) You must repair any coating damage discovered.
The Notice alleged that Respondent violated 49 C.F.R. § 195.561(b) by failing to properly repair
external coating damage discovered on a section of its pipeline prior to lowering the pipe into a
ditch. Specifically, the Notice alleged that ONEOK personnel improperly applied 3M coating
repair patch sticks to external coating damage found on a 27.19-mile-long portion of its Line 5
pipeline. During the inspection, PHMSA’s inspector witnessed ONEOK personnel repairing
coating by applying heat directly to the 3M patch stick, rather than the parent-coating surface,
which was contrary to 3M’s written application instructions.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.561(b) by failing to properly
repair external coating damage discovered on a section of its Line 5 pipeline prior to lowering
the pipe into a ditch.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for a violation of
49 C.F.R. § 195.561(b). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. The Director
indicates that Respondent has taken the following actions to respond to the proposed compliance
order:
1. With respect to the violation of § 195.561(b) (Item 1), Respondent assessed the
affected section of its pipeline using an inline inspection tool in 2010 and 2012.
Respondent also performed a close interval cathodic protection survey and a
corrosion growth analysis on the affected pipeline. Respondent has submitted
documentation of the results of these actions and the Director has determined that any
threat of significant external corrosion appears to have been mitigated at this time.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.



3
The terms and conditions of this Final Order [CPF No. 3-2009-5007] are effective upon service
in accordance with 49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety