{"operation":"document","citation":"CPF 320105001H","title":"ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2010-01-19","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320105001H","body":"Corrective Action Order involving ENBRIDGE ENERGY, LIMITED PARTNERSHIP. The dataset does not identify a cited regulation for this case. The case was opened on 2010-01-19 and is reported as closed as of 2016-03-01. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320105001H_CAO_01192010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_CAO_01192010.pdf\n\n320105001H_CAO_01192010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_CAO_01192010_text.pdf\n\n320105001H_Closure Letter_03012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_Closure%20Letter_03012016.pdf\n\n320105001H_Closure Letter_03012016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_Closure%20Letter_03012016_text.pdf\n\n320105001H_Closure Letter_03012016_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nMarch 1, 2016\nMr. Bradley F. Shamla\nVice President, US Operations\nEnbridge Energy, LP\n7701 France Avenue South, Suite 600\nEdina, Minnesota 55435\nCPF 3-2010-5001H\nDear Mr. Shamla:\nOn January 19, 2010, the Pipeline and Hazardous Materials Safety Administration\n(PHMSA) issued to Enbridge Energy Partners, L.P. (“Enbridge”) a Corrective Action Order\nin the above-referenced case. This Order included a requirement to take corrective actions\non your pipeline. Based on our review of the documentation you provided, it has been\ndetermined that you have complied with the terms of this Order.\nAccordingly, this case is now closed and no further action is contemplated with respect to\nthe matters involved in this case. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration\ncc: Mr. Andrew J. Harrington, Enbridge, Inc.\nCalgary, Alberta Canada\nMr. Jeffrey D. Wiese, Associate Administrator of Pipeline Safety\nWashington, D.C.","truncated":false,"body_characters":1984}