# ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Corrective Action Order

- **operation:** document
- **citation:** CPF 320105001H
- **title:** ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-01-19
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105001h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320105001H
**body:**

Corrective Action Order involving ENBRIDGE ENERGY, LIMITED PARTNERSHIP. The dataset does not identify a cited regulation for this case. The case was opened on 2010-01-19 and is reported as closed as of 2016-03-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320105001H_CAO_01192010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_CAO_01192010.pdf

320105001H_CAO_01192010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_CAO_01192010_text.pdf

320105001H_Closure Letter_03012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_Closure%20Letter_03012016.pdf

320105001H_Closure Letter_03012016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105001H/320105001H_Closure%20Letter_03012016_text.pdf

320105001H_Closure Letter_03012016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 1, 2016
Mr. Bradley F. Shamla
Vice President, US Operations
Enbridge Energy, LP
7701 France Avenue South, Suite 600
Edina, Minnesota 55435
CPF 3-2010-5001H
Dear Mr. Shamla:
On January 19, 2010, the Pipeline and Hazardous Materials Safety Administration
(PHMSA) issued to Enbridge Energy Partners, L.P. (“Enbridge”) a Corrective Action Order
in the above-referenced case. This Order included a requirement to take corrective actions
on your pipeline. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to
the matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Andrew J. Harrington, Enbridge, Inc.
Calgary, Alberta Canada
Mr. Jeffrey D. Wiese, Associate Administrator of Pipeline Safety
Washington, D.C.
- **truncated:** false