# AMOCO OIL CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 320105010H
- **title:** AMOCO OIL CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-08-26
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105010h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105010h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320105010h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320105010H
**body:**

Corrective Action Order involving AMOCO OIL CO. The dataset does not identify a cited regulation for this case. The case was opened on 2010-08-26 and is reported as closed as of 2014-09-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320105010H_CAO_08262010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105010H/320105010H_CAO_08262010.pdf

320105010H_CAO_08262010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105010H/320105010H_CAO_08262010_text.pdf

320105010H_Closure_09032014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105010H/320105010H_Closure_09032014.pdf

320105010H_Closure_09032014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320105010H/320105010H_Closure_09032014_text.pdf

320105010H_Closure_09032014_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 3, 2014
Mr. Steve Pankhurst
President
BP Pipelines (North America), Inc.
21800 Torch Parkway
Warrenville, Illinois 60555
CPF 3-2010-5010H
Dear Mr. Pankhurst:
On August 26, 2010, the Pipeline and Hazardous Materials Safety Administration
(PHMSA) issued to BP Pipelines (North America), Inc. a Corrective Action Order in the
above-referenced case. This Order included a requirement to take corrective actions on
your pipeline. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to
the matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 1743