# MoGAS PIPELINE LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 320111008M
- **title:** MoGAS PIPELINE LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-06-09
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.13(c), 192.605(a), 192.605(b)(1), 192.605(b)(2), 192.605(b)(4), 192.605(b)(5), 192.605(b)(8), 192.605(c)(1), 192.615(a)(3), 192.615(a)(4), 192.615(b)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111008m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111008m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111008m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320111008M
**body:**

Notice of Amendment involving MoGAS PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 192.13(c),  192.605(a),  192.605(b)(1),  192.605(b)(2),  192.605(b)(4),  192.605(b)(5),  192.605(b)(8),  192.605(c)(1),  192.615(a)(3),  192.615(a)(4),  192.615(b)(3). The case was opened on 2011-06-09 and is reported as closed as of 2012-02-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320111008M_Closure_02032012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111008M/320111008M_Closure_02032012.pdf

320111008M_Closure_02032012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111008M/320111008M_Closure_02032012_text.pdf

320111008M_NOA_06092011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111008M/320111008M_NOA_06092011.pdf

320111008M_NOA_06092011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111008M/320111008M_NOA_06092011_text.pdf

320111008M_Operator Response and Request for Time Extension_07062011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111008M/320111008M_Operator%20Response%20and%20Request%20for%20Time%20Extension_07062011.pdf

320111008M_Closure_02032012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 3, 2012
Mr. David Ries
President
MoGas Pipeline LLC
110 Algana Court
St. Peters, MO 63376
CPF 3-2011-1008M
Dear Mr. Ries:
On October 4-8, 25-29, 2010 and November 1-4, 2010, representatives of the Pipeline and
Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United
States Code inspected the operation and maintenance procedures for MoGas Pipeline LLC
(MoGas) at your offices in St. Peters, MO. As a result of the inspection, MoGas Pipeline LLC
was issued a Notice of Amendment on June 9, 2011, which proposed amendment of your
procedures.
MoGas Pipeline LLC submitted its amended procedures on October 31, 2011. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2302
