{"operation":"document","citation":"CPF 320111018H","title":"TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-11-17","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320111018H","body":"Corrective Action Order involving TENNESSEE GAS PIPELINE COMPANY. The dataset does not identify a cited regulation for this case. The case was opened on 2011-11-17 and is reported as closed as of 2016-04-01. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320111018H_CAO_11172011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_CAO_11172011.pdf\n\n320111018H_CAO_11172011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_CAO_11172011_text.pdf\n\n320111018H_Closure Letter_04012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_Closure%20Letter_04012016.pdf\n\n320111018H_Closure Letter_04012016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_Closure%20Letter_04012016_text.pdf\n\n320111018H_Closure Letter_04012016_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 1, 2016\nMr. Gary Buchler\nChief Operating Officer (COO)\nNatural Gas Pipelines Group\nTennessee Gas Pipeline Company\n1001 Louisiana Street\nSuite 1000\nHouston, Texas 77002\nCPF 3-2011-1018H\nDear Mr. Buchler:\nOn November 17, 2011, the Pipeline and Hazardous Materials Safety Administration\n(PHMSA) issued to Tennessee Gas Pipeline Company a Corrective Action Order (Order) in\nthe above-referenced case. This Order included required actions to be taken on and along\nyour pipeline. Based on our review of the documentation you provided, it has been\ndetermined that you have complied with the terms of this Order.\nAccordingly, this case is now closed. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":1763}