# TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order

- **operation:** document
- **citation:** CPF 320111018H
- **title:** TENNESSEE GAS PIPELINE COMPANY — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-11-17
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320111018h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320111018H
**body:**

Corrective Action Order involving TENNESSEE GAS PIPELINE COMPANY. The dataset does not identify a cited regulation for this case. The case was opened on 2011-11-17 and is reported as closed as of 2016-04-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320111018H_CAO_11172011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_CAO_11172011.pdf

320111018H_CAO_11172011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_CAO_11172011_text.pdf

320111018H_Closure Letter_04012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_Closure%20Letter_04012016.pdf

320111018H_Closure Letter_04012016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320111018H/320111018H_Closure%20Letter_04012016_text.pdf

320111018H_Closure Letter_04012016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 1, 2016
Mr. Gary Buchler
Chief Operating Officer (COO)
Natural Gas Pipelines Group
Tennessee Gas Pipeline Company
1001 Louisiana Street
Suite 1000
Houston, Texas 77002
CPF 3-2011-1018H
Dear Mr. Buchler:
On November 17, 2011, the Pipeline and Hazardous Materials Safety Administration
(PHMSA) issued to Tennessee Gas Pipeline Company a Corrective Action Order (Order) in
the above-referenced case. This Order included required actions to be taken on and along
your pipeline. Based on our review of the documentation you provided, it has been
determined that you have complied with the terms of this Order.
Accordingly, this case is now closed. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration