{"operation":"document","citation":"CPF 320115002M","title":"VECTREN ENERGY DELIVERY OF OHIO — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-03-18","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(c), 195.452, 195.452(f)(3), 195.452(f)(6), 195.452(f)(7), 195.452(l)(1).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320115002M","body":"Notice of Amendment involving VECTREN ENERGY DELIVERY OF OHIO. PHMSA's enforcement data identifies the cited regulations as 195.402(c),  195.452,  195.452(f)(3),  195.452(f)(6),  195.452(f)(7),  195.452(l)(1). The case was opened on 2011-03-18 and is reported as closed as of 2011-09-16. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320115002M_Closure Letter_09162011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Closure%20Letter_09162011.pdf\n\n320115002M_Closure Letter_09162011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Closure%20Letter_09162011_text.pdf\n\n320115002M_NOA_03182011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_NOA_03182011.pdf\n\n320115002M_NOA_03182011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_NOA_03182011_text.pdf\n\n320115002M_Operator Response to NOA_04142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Operator%20Response%20to%20NOA_04142011.pdf\n\n320115002M_Closure Letter_09162011_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nSeptember 16, 2011\nMr. Rick Schach\nVice President\nVectren Energy Delivery of Ohio\n211 N.W. Riverside Drive\nEvansville, Indiana 47708\nCPF 3-2011-5002M\nDear Mr. Schach:\nOn December 13 through December 16, 2010, a representative from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of Vectren Energy’s procedures in Evansville,\nIndiana. As a result of the inspection, Vectren Energy was issued a Notice of Amendment on\nMarch 18, 2011, which proposed amendments of your procedures.\nVectren Energy submitted its amended procedures on June 20, 2011. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been addressed.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2226}