# VECTREN ENERGY DELIVERY OF OHIO — Notice of Amendment

- **operation:** document
- **citation:** CPF 320115002M
- **title:** VECTREN ENERGY DELIVERY OF OHIO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-03-18
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c), 195.452, 195.452(f)(3), 195.452(f)(6), 195.452(f)(7), 195.452(l)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115002m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320115002M
**body:**

Notice of Amendment involving VECTREN ENERGY DELIVERY OF OHIO. PHMSA's enforcement data identifies the cited regulations as 195.402(c),  195.452,  195.452(f)(3),  195.452(f)(6),  195.452(f)(7),  195.452(l)(1). The case was opened on 2011-03-18 and is reported as closed as of 2011-09-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320115002M_Closure Letter_09162011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Closure%20Letter_09162011.pdf

320115002M_Closure Letter_09162011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Closure%20Letter_09162011_text.pdf

320115002M_NOA_03182011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_NOA_03182011.pdf

320115002M_NOA_03182011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_NOA_03182011_text.pdf

320115002M_Operator Response to NOA_04142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115002M/320115002M_Operator%20Response%20to%20NOA_04142011.pdf

320115002M_Closure Letter_09162011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 16, 2011
Mr. Rick Schach
Vice President
Vectren Energy Delivery of Ohio
211 N.W. Riverside Drive
Evansville, Indiana 47708
CPF 3-2011-5002M
Dear Mr. Schach:
On December 13 through December 16, 2010, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Vectren Energy’s procedures in Evansville,
Indiana. As a result of the inspection, Vectren Energy was issued a Notice of Amendment on
March 18, 2011, which proposed amendments of your procedures.
Vectren Energy submitted its amended procedures on June 20, 2011. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been addressed.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2226
