{"operation":"document","citation":"CPF 320115004H","title":"WEST SHORE PIPELINE CO — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-04-20","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320115004H","body":"Corrective Action Order involving WEST SHORE PIPELINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2011-04-20 and is reported as closed as of 2015-10-22. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320115004H_CAO_04202011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_CAO_04202011.pdf\n\n320115004H_CAO_04202011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_CAO_04202011_text.pdf\n\n320115004H_Closure Letter_10222015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_Closure%20Letter_10222015.pdf\n\n320115004H_Closure Letter_10222015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_Closure%20Letter_10222015_text.pdf\n\n320115004H_Closure Letter_10222015_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nOctober 22, 2015\nMr. Thomas S. (Scott) Collier\nVice President, Performance Assurance\nWest Shore Pipe Line Co.\nTEK Park Five\n999 Hamilton Boulevard\nBreinigsville, Pennsylvania 18031\nRe: CPF No. 3-2011-5004\nRequest for Closure\nDear Mr. Collier:\nOn April 20, 2011, the Pipeline and Hazardous Materials Safety Administration (PHMSA)\nissued to West Shore Pipe Line Company a Corrective Action Order in the above-\nreferenced case. This Order included a requirement to take corrective actions on your\npipeline. Based on our review of the documentation you provided it has been determined\nthat you have complied with the terms of this Order.\nAccordingly, this case is now closed and no further action is contemplated with respect to\nthe matters involved in this case. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":1866}