# WEST SHORE PIPELINE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 320115004H
- **title:** WEST SHORE PIPELINE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-04-20
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320115004h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320115004H
**body:**

Corrective Action Order involving WEST SHORE PIPELINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2011-04-20 and is reported as closed as of 2015-10-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320115004H_CAO_04202011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_CAO_04202011.pdf

320115004H_CAO_04202011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_CAO_04202011_text.pdf

320115004H_Closure Letter_10222015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_Closure%20Letter_10222015.pdf

320115004H_Closure Letter_10222015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115004H/320115004H_Closure%20Letter_10222015_text.pdf

320115004H_Closure Letter_10222015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 22, 2015
Mr. Thomas S. (Scott) Collier
Vice President, Performance Assurance
West Shore Pipe Line Co.
TEK Park Five
999 Hamilton Boulevard
Breinigsville, Pennsylvania 18031
Re: CPF No. 3-2011-5004
Request for Closure
Dear Mr. Collier:
On April 20, 2011, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to West Shore Pipe Line Company a Corrective Action Order in the above-
referenced case. This Order included a requirement to take corrective actions on your
pipeline. Based on our review of the documentation you provided it has been determined
that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to
the matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 1866