{"operation":"document","citation":"CPF 320115006H","title":"TC OIL PIPELINE OPERATIONS INC — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-06-03","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115006h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115006h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320115006h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320115006H","body":"Corrective Action Order involving TC OIL PIPELINE OPERATIONS INC. The dataset does not identify a cited regulation for this case. The case was opened on 2011-06-03 and is reported as closed as of 2015-01-13. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320115006H_Amended CAO_06282011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_Amended%20CAO_06282011.pdf\n\n320115006H_Amended CAO_06282011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_Amended%20CAO_06282011_text.pdf\n\n320115006H_CAO_06032011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_CAO_06032011.pdf\n\n320115006H_CAO_06032011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_CAO_06032011_text.pdf\n\n320115006H_Closure_01132015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_Closure_01132015.pdf\n\n320115006H_Closure_01132015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320115006H/320115006H_Closure_01132015_text.pdf\n\n320115006H_Closure_01132015_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nJanuary 13, 2015\nMr. Vern Meier\nVice President\nTC Oil Pipeline Operations, Inc.\n717 Texas Avenue, Suite 2400\nHouston, Texas 77002\nCPF 3-2011-5006H\nDear Mr. Meier:\nOn June 3, 2011, the Pipeline and Hazardous Materials Safety Administration (PHMSA)\nissued to TC Oil Pipeline Operations, Inc. a Corrective Action Order in the above-\nreferenced case. This Order included a requirement to take corrective actions on your\npipeline. Based on our review of the documentation you provided, it has been determined\nthat you have complied with the terms of this Order.\nAccordingly, this case is now closed. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":1956}