{"operation":"document","citation":"CPF 320121011M","title":"KPC PIPELINE, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-11-27","effective_on":null,"summary":"CLOSED notice of amendment citing 192.911(a), 192.911(c), 192.911(h), 192.911(k), 192.911(l), 192.911(m).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320121011M","body":"Notice of Amendment involving KPC PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 192.911(a),  192.911(c),  192.911(h),  192.911(k),  192.911(l),  192.911(m). The case was opened on 2012-11-27 and is reported as closed as of 2014-04-09. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320121011M_Closure_04092014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Closure_04092014.pdf\n\n320121011M_Closure_04092014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Closure_04092014_text.pdf\n\n320121011M_NOA_11272012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_NOA_11272012.pdf\n\n320121011M_NOA_11272012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_NOA_11272012_text.pdf\n\n320121011M_Operator_Response_to_NOA_01072013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Operator_Response_to_NOA_01072013.pdf\n\n320121011M_Closure_04092014_text.pdf\n\nUPS NEXT DAY AIR\nApril 9, 2014\nMr. Joe Fowler\nVice President, Operations\nKPC Pipeline, LLC\n19970 161st Street\nOlathe, Kansas 66062\nCPF 3-2012-1011M\nDear Mr. Fowler:\nOn December 8-10, 2010, representatives of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) and the Kansas Corporation Commission (KCC) pursuant to Chapter 601 of\n49 United States Code inspected KPC Pipeline, LLC’s (KPC’s) procedures for gas transmission\nintegrity management. As a result of the inspection, PHMSA issued a Notice of Amendment to KPC\non November 27, 2012, which proposed amendment of your procedures.\nKPC Pipeline, LLC submitted its amended procedures on January 7, 2013. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in the Notice of Amendment have\nbeen corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you for\nyour cooperation.\nSincerely,\nLinda Daugherty\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2127}