# KPC PIPELINE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 320121011M
- **title:** KPC PIPELINE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-11-27
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.911(a), 192.911(c), 192.911(h), 192.911(k), 192.911(l), 192.911(m).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320121011m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320121011M
**body:**

Notice of Amendment involving KPC PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 192.911(a),  192.911(c),  192.911(h),  192.911(k),  192.911(l),  192.911(m). The case was opened on 2012-11-27 and is reported as closed as of 2014-04-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320121011M_Closure_04092014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Closure_04092014.pdf

320121011M_Closure_04092014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Closure_04092014_text.pdf

320121011M_NOA_11272012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_NOA_11272012.pdf

320121011M_NOA_11272012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_NOA_11272012_text.pdf

320121011M_Operator_Response_to_NOA_01072013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121011M/320121011M_Operator_Response_to_NOA_01072013.pdf

320121011M_Closure_04092014_text.pdf

UPS NEXT DAY AIR
April 9, 2014
Mr. Joe Fowler
Vice President, Operations
KPC Pipeline, LLC
19970 161st Street
Olathe, Kansas 66062
CPF 3-2012-1011M
Dear Mr. Fowler:
On December 8-10, 2010, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) and the Kansas Corporation Commission (KCC) pursuant to Chapter 601 of
49 United States Code inspected KPC Pipeline, LLC’s (KPC’s) procedures for gas transmission
integrity management. As a result of the inspection, PHMSA issued a Notice of Amendment to KPC
on November 27, 2012, which proposed amendment of your procedures.
KPC Pipeline, LLC submitted its amended procedures on January 7, 2013. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in the Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Linda Daugherty
Director, Central Region
Pipeline and Hazardous Materials Safety Administration