{"operation":"document","citation":"CPF 320125002H","title":"SUNOCO PIPELINE L.P. — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-01-18","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320125002H","body":"Corrective Action Order involving SUNOCO PIPELINE L.P.. The dataset does not identify a cited regulation for this case. The case was opened on 2012-01-18 and is reported as closed as of 2016-11-04. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320125002H_CAO_01182012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_CAO_01182012.pdf\n\n320125002H_CAO_01182012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_CAO_01182012_text.pdf\n\n320125002H_Closure Letter_11042016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_Closure%20Letter_11042016.pdf\n\n320125002H_Closure Letter_11042016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_Closure%20Letter_11042016_text.pdf\n\n320125002H_Closure Letter_11042016_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nNovember 4, 2016\nMr. David R. Chalson\nSr. Vice President, Operations\nSunoco Pipeline L.P.\n4041 Market Street\nAston, PA 19014\nCPF 3-2012-5002H\nDear Mr. Chalson:\nOn January 18, 2012, the Pipeline and Hazardous Materials Safety Administration (PHMSA)\nissued to Sunoco Pipeline L.P. a Corrective Action Order (CAO) in the above-referenced case.\nThis Order included required actions to be taken on and along your pipeline. Based on our\nreview of the documentation you provided, it has been determined that you have complied with\nthe terms of this Order.\nAccordingly, this case is now closed. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration\ncc: Mr. Michael Hennigan\nPresident Sunoco Pipeline, L.P.\n1818 Market Street, Suite 1500\nPhiladelphia, PA 19103","truncated":false,"body_characters":1797}